Loading presentation...

Present Remotely

Send the link below via email or IM

Copy

Present to your audience

Start remote presentation

  • Invited audience members will follow you as you navigate and present
  • People invited to a presentation do not need a Prezi account
  • This link expires 10 minutes after you close the presentation
  • A maximum of 30 users can follow your presentation
  • Learn more about this feature in our knowledge base article

Do you really want to delete this prezi?

Neither you, nor the coeditors you shared it with will be able to recover it again.

DeleteCancel

Make your likes visible on Facebook?

Connect your Facebook account to Prezi and let your likes appear on your timeline.
You can change this under Settings & Account at any time.

No, thanks

CSI 16 Divisions

Construction Specifications Institute (CSI) 16 Divisions
by

david king

on 12 September 2011

Comments (0)

Please log in to add your comment.

Report abuse

Transcript of CSI 16 Divisions

Build a 3 unit
townhouse Division 01 —
General Requirements Division 02 — Site Construction Division 03 — Concrete Division 04 — Masonry Site Layout and Engineering Access Roads Clear the site Rough-in building location
Grade and Drain Finish Grade Division 05 — Metals Division 06 —
Wood and Plastics Division 08 — Doors and Windows Division 07 — Thermal and Moisture Protection Division 09 —
Finishes Division 10 —
Specialties Division 11 —
Equipment Division 12 —
Furnishings Division 16 —
Electrical Division 15 —
Mechanical Division 14 —
Conveying System Division 13 —
Special Construction Building layout / engineering Excavate Footings Formwork and reinforcing steel Place and cure concrete Strip forms Damp-Proof Building Layout Engineering Build 1st and 2nd floor frame Build porches and decks Place exterior doors and windows Build roof system HVAC system Electrical System Misc. sub- system Sheetrock Paint and wall coverings Cabinetry Interior doors Insulation Trim Carpentry Hardware / Mechanical FInishes Roofing Materials Siding Masonry Painting Landscaping Inspection by contractor Close out inspection Punch list CSI 16 division Build a 3 unit
townhouse CSI Master division Division 01 —
General Requirements Division 00 —
Procurement and Contracting Requirements Inspection by contractor Close out inspection Punch list Division 06 —
Wood and Plastics Building Layout Engineering Build 1st and 2nd floor frame Build porches and decks Division 07 — Thermal and Moisture Protection Grade and Drain Build roof system Insulation Roofing Materials Siding Division 08 — Openings Division 02 — Existing Conditions Division 03 — Concrete Division 04 — Masonry Division 05 — Metals Division 09 —
Finishes Division 10 —
Specialties Division 11 —
Equipment Division 12 —
Furnishings Division 13 —
Special Construction Division 14 —
Conveying System Division 21— Fire Supresion Masonry Formwork and reinforcing steel Place and cure concrete Strip forms Damp-Proof Division 22— Plumbing Division 33— Utilities Division 26— Electrical Division 34— Transportation Division 23—HVAC Division 28— Electronic safety
and Security Division 27— Communications Division 32— Exterior improvements Division 31— Earthwork Division 35 - Waterways Division 48 — Electrical Power Generation Division 44 — Pollution Control Equipment Division 43 — Process Gas and Liquid Handling, Purification and Storage Equipment Division 45 — Industry-Specific Manufacturing Equipment Division 41 — Material Processing and Handling Equipment Division 42 — Process Heating, Cooling, and Drying Equipment Division 40 — Process Integration Place exterior doors and windows Sheetrock Paint and wall coverings Trim Carpentry Hardware / Mechanical FInishes Painting Landscaping Cabinetry Plumbing HVAC system Misc. sub- system Electrical System Excavate Footings Building layout / engineering Siding