Loading presentation...

Present Remotely

Send the link below via email or IM

Copy

Present to your audience

Start remote presentation

  • Invited audience members will follow you as you navigate and present
  • People invited to a presentation do not need a Prezi account
  • This link expires 10 minutes after you close the presentation
  • A maximum of 30 users can follow your presentation
  • Learn more about this feature in our knowledge base article

Do you really want to delete this prezi?

Neither you, nor the coeditors you shared it with will be able to recover it again.

DeleteCancel

Make your likes visible on Facebook?

Connect your Facebook account to Prezi and let your likes appear on your timeline.
You can change this under Settings & Account at any time.

No, thanks

Varna Integrated Plan for Urban Regenration and Development

No description
by

Todorka Dimitrova

on 26 February 2015

Comments (0)

Please log in to add your comment.

Report abuse

Transcript of Varna Integrated Plan for Urban Regenration and Development

Varna Integrated Plan
for
Urban Regeneration and Development

Case Study
The Integrated Plan for Urban Regeneration and Development (IPURD) of the city of Varna is a project elaborated under the Scheme" BG161RO001/1.4-07/2010 "Support for integrated plans for urban rehabilitation and development" of the Operational Program "Regional Development".

The project duration was 30 months with a budget totals at 999,542.00 BGN. The funds was provided in proportion 85:10:5%, respectively from the following sources:

 European Fund for regional development - 849,610.70 BGN
 State Budget of republic of Bulgaria - 99,954.20 BGN
 Budget of the Municipality of Varna - 49,977.10 BGN

The Integrated Plan for Urban Regeneration and Development is an innovative tool for planning and management of urban formations, which is based on the application of the unified approach to spatial, temporal and functional coordination and integration of policy and management actions, mobilization of resources and development and implementation of strategic projects for the development of the city .


By the methods of integrated spatial planning, the strategic planning of regional development and the traditional planning, the project aims to ensure adequate planning foundation for sustainable growth of Varna in the next programming period (2014 - 2020) in a broad partnership, publicity and commitment of all stakeholders.

EXPECTATIONS IN DEVELOPING OF IPURD-VARNA
Providing adequate planning basis for development of the city in the next programming period

Integrated problem solving

Effective utilization of comparative advantages of Varna


1.
Raising energy efficiency in public and residential buildings

2.
Improving the urban environment - including public recreation areas,
parks, gardens, playgrounds, spaces, pedestrian and cycle lanes, pedestrian
zones, subways, street networks and street lighting and more.

3.
Development of business infrastructure in the area with potential for economic
development
4.
Building new sports facilities - gyms, swimming pools, soccer fields, stadiums, volleyball and basketball courts, tennis courts and more.
5.
Improving the cultural sites - cultural centers, theaters, community centers, libraries, museums, exhibition halls and more.
6.
Maintain and enhance educational facilities - kindergartens, primary and secondary schools and more.
7.
Improvement of health and social facilities - hospitals, social housing centers.
8.
Introducing integrated urban transport - plans and systems for traffic management, improve accessibility and upgrading transport infrastructure, development of route network and more.

STARTING POINT FOR IPURD-VARNA DEVELOPMENT
• Identification of local stakeholders
• Public consultation
• Active information through the web-site www.ipgvr-varna.bg
• Public discussions

Strategic and planning documents related to Varna
Updated Information for:

Functions and use of the territory
Bottlenecks in infrastructure provision
Characteristics of the environment, including the level of completeness, conditions of buildings, public amenities, ecological status, etc.
The population that inhabits / use environment, its demographic and socioeconomic characteristics
Prospects for the development and importance of the particular territory for the overall city development.

GOALS IN DEVELOPMENT OF THE PLAN
The Integrated Plan for Urban Regeneration and Development is aimed to create conditions for:


Territory sustainable development

Reducing the inner-city differences

Improving the living conditions and the work conditions for the business community

Establishment of an integrated approach to planning and management of the city, aimed at efficient capitalization of its comparative advantages

STAGES OF DEVELOPMENT OF THE PLAN

Worked out a target and problem analysis of the current situation in the space-functional, socio-economic and environmental plans, and in terms of availability of plans and schemes in force for the territory of Varna.

Formulated a vision for the city development with a horizon to 2020.

Approved three zones for influence.

Held public hearings, discussions, expert panels, surveys (targeted 65 organizations in total).

Developed a strategic framework of the IPURD - Varna.

Identified and prioritized projects for inclusion in the IPURD - Varna.

Developed detailed plans (Plan for Western Industrial Zone - Part II " with an area of 1,657,856 m2).

Developed technical specifications for detailed design of the 12 sites, included in the plan.

Completed environmental procedures under the Environment Protection and Biodiversity Acts.

STEPS IN PLANNING
ZONES FOR IMPACT

• Zone with a predominant social
character
- urban areas with predominantly
residential functions. The sign of integration of this
type of areas covers the problems of occupation, taking
into account the overall state of the residential environment - the
degree of completion and status of technical and social infrastructure,
the quality of the living environment;


• Zone with potential for economic development
- urban areas with a
predominant purpose for manufacturing and other business activities
with functional, average characteristics and condition of the technical infrastructure that do not meet the investment demand for development
of the existing and new economic activities, and free territories, defined
with the development plans for these purposes;


• Areas with public functions and high public importance
can be the
downtown, central walkways and other areas with available or possible
concentration of functions with a public nature and high public
importance, areas with predominance of buildings with public
administrative functions and the presence of buildings -
real estate with cultural values.

SELECTION OF CRITERIA
for the types of zones
->
Group I: Status of the technical infrastructure and the environment


Missing or poor condition of the existing systems of the technical
infrastructure, street, sidewalk and alley paving.

Missing or underdeveloped elements of public transport (regular
shuttle buses and related infrastructure).

Undeveloped, natural state, unfurnished or in poor condition
elements of the urban living environment (green areas for
widespread public use , spaces between residential blocks,
playgrounds, street and alley lighting).

Environment with impaired ecological parameters.

Group II: Socio-economic


High level of poverty and exclusion

High level of long-term unemployment

Unsatisfactory demographic indicators (high mortality, lower life
expectancy, impaired educational structure, too high number of
household members, etc.).

Low level of economic activities

The majority of the population are ethnic, minority groups or
immigrants, refugees;

Low standard of education, a large number of students who leave
school early

Low level of energy efficiency of buildings

High level of crime and public nuisance


Group III: Physical and economic parameters of housing


Availability of housing, located in different types of residential
buildings, which were constructed in industrial way and need to be
updated

Other buildings, which were built more than 20 years ago

Poor condition of buildings

Low real estate prices



ZONES APPROVED FOR IMPACT
LIST OF PROJECTS, INCLUDED IN THE IPURD - VARNA
BUDGET OF THE IPURD - VARNA AS PER ZONES OF INFLUENCE
BUDGET OF THE IPURD - VARNA AS PER PROJECTS' TYPE
SELECTION OF CRITERIA
for the types of zones
->
Partners in the implementation of IPURD - VARNA

• Initial list of 155 projects totaling 686 973 764 BGN with VAT
(Exchange rate: 1 BGN = 1,95583 RUR)
• Reserve list of 40 projects, totaling 445 581 109 BGN with VAT
o
Urban environment;
o
Educational infrastructure;
o
Social infrastructure;
o
Health infrastructure;
o
Cultural infrastructure;
o
Sport infrastructure;
o
Economic Development;
o
Renovation of multifamily buildings and public administrative buildings
(municipal and state);
o
Promoting sustainable urban mobility and integrated urban transport.
Thank you for your attention !
Full transcript