Loading presentation...

Present Remotely

Send the link below via email or IM

Copy

Present to your audience

Start remote presentation

  • Invited audience members will follow you as you navigate and present
  • People invited to a presentation do not need a Prezi account
  • This link expires 10 minutes after you close the presentation
  • A maximum of 30 users can follow your presentation
  • Learn more about this feature in our knowledge base article

Do you really want to delete this prezi?

Neither you, nor the coeditors you shared it with will be able to recover it again.

DeleteCancel

Make your likes visible on Facebook?

Connect your Facebook account to Prezi and let your likes appear on your timeline.
You can change this under Settings & Account at any time.

No, thanks

CONSTRUCTION D'UN BATIMENT COMMUNAL

No description
by

Fabien Boc

on 1 October 2013

Comments (0)

Please log in to add your comment.

Report abuse

Transcript of CONSTRUCTION D'UN BATIMENT COMMUNAL

CONSTRUCTION D'UN BATIMENT COMMUNAL PHASE APD
SOMMAIRE
- Démarrage Etude APD
*Quantitatif
*Notice
*Plannification

-Indice BT

Qualification des entreprises
Démarrage Etude APD
Terrassement en pleine masse

Mise en forme de remblaiement pour la plate forme en 0/80 sur une ép: 0.40m

Essaie à la plaque

Fouilles en puits et en rigoles

Enlèvement des terres et stockages

Remblaiement a la suite de la pose des massifs et longrines
Quantitatif
Terrassement:
Quantitatif
Gros oeuvre:
Quantitatif
Préparation de chantier :
Quantitatif
Panneau de chantier
Bureau de chantier
Equipement hygiène et sécurité
Branchements :
-Electrique (avec consommation
-Eau
-Téléphonne
Bennes de chantier
Implantation
Clôture non jointive :
-Ht clôture : 1.50 m à 2.00 m.
Portillon
Portail
Grue Fixe
Massif:

Dimension 1.00 x 1.00m
Gros Béton épaisseur 0.10m
Béton épaisseur 0.40m dosé a 350kg
Féraillage : 27kg/m3

Semelles filantes:

Dimension 0.50x 0.40m
Gros béton sur 10 cm
Béton dosé a 350kg
Féraillage : 28kg/m3

Gros oeuvre:
Quantitatif
Gros oeuvre:
Mur en élévation
BBM 20 x 25 x 50 sur une hauteur de 4m
BBM 20 x 20 x 50 en U pour chaînage intermediaire a 2.00m et chaînage haut 4.20m
Quantitatif
Gros oeuvre:
Linteaux
Béton : 20 x 25 cm
Aciers T 4.00kg/ml
Quantitatif
Gros oeuvre:
Quantitatif
Gros oeuvre:
Poteaux

Béton dosé a 350kg

Acier T 100kg/m3

Quantitatif
Gros oeuvre:
Gros oeuvre:
Plancher dalle pleine BA ep 20 cm

Dalle beton dosée a 350kg

Acier TS 3kg /m²

Acier T 7.5kg/m²

Quantitatif
Dalle pleine BA ep 15 cm

Dalle beton dosée a 350kg

Acier TS 3kg /m²

Acier T 7.5kg/m²

isolation sous dallage 2 couche croisé de 100mm

Finition quartz lissé
Gros oeuvre:
Quantitatif
OUVRAGE DIVERS
Quantitatif
Seuils

Béton dosée a 350kg /m3

Acier 3.5 kg / m²

Gros oeuvre:
Quantitatif
Trous, scellementet ouvrage divers

Trait de niveau
Gros oeuvre:
Chaînage et raidisseur

Béton dosée a 350kg
Acier T 3kg/ml

pour le chainage utilisation de bloc U 20 x20 x50cm
Poutre

Béton dosé a 350kg

Acier T 130kg / m3
Quantitatif
Charpente métallique
Quantitatif
Poteaux de structure

IPN 240

Charpente métallique
Structure de la charpente
*Poutre périphérique IPN 120
*Chevron IPN 120
*Pannes IPN 100

Tube en acier 80x80mm soudée entre les IPN pour le tablier de fenêtre
option