Loading presentation...

Present Remotely

Send the link below via email or IM

Copy

Present to your audience

Start remote presentation

  • Invited audience members will follow you as you navigate and present
  • People invited to a presentation do not need a Prezi account
  • This link expires 10 minutes after you close the presentation
  • A maximum of 30 users can follow your presentation
  • Learn more about this feature in our knowledge base article

Do you really want to delete this prezi?

Neither you, nor the coeditors you shared it with will be able to recover it again.

DeleteCancel

APARTAMENTOS INTERVENIDOS HASTA LA FECHA

No description
by

Dayana Gomez Arango

on 5 November 2014

Comments (0)

Please log in to add your comment.

Report abuse

Transcript of APARTAMENTOS INTERVENIDOS HASTA LA FECHA

APARTAMENTOS INTERVENIDOS HASTA LA FECHA

FISURAS
54 Apartamentos en total
DRYWALL
17 Apartamentos en total
Filete de portón
31 Apartamentos en total
GRIFERÍA Y SANITARIOS
PISO - LECHADA
Piso Lechada
POST - VENTAS
39 Aptos de torre 1

15 Aptos de torre 2
6 Aptos de torre 1
11 Aptos de torre 2
11 Aptos en total
13 Aptos en total
3 Aptos de torre 1
8 Aptos de torre 2
5 Aptos de torre 1
Aptos de torre 2
16 Aptos de torre 1
19 Aptos de torre 2
CINTA DE DRYWALL
36 Apartamentos en total
22 Aptos de torre 1
14 Aptos de torre 2
Grifería de cocina
17 Apartamentos en total
5 Aptos de torre 1
12 Aptos de torre 2
Aparato Sanitario
14 Aptos en total
6 Aptos de torre 1
11 Aptos de torre 2
2 Aptos de torre 3
CABINAS Y VENTANAS
89 Apartamentos en total
35 Aptos de torre 1
48 Aptos de torre 2
6 Aptos de torre 3
67 Apartamentos en total
34 Aptos de torre 1
26 Aptos de torre 2
7 Aptos de torre 3
COSTOS GENERADOS POR POST-VENTAS
Mano de obra
$ 15,186,666.67
$ 11,450,239.36
Materiales
TOTAL
$ 26,636,906.03
Costos Generados Gran Portón
Tierra Grata Palmas
Tierra Grata Palmas
$ 15´000.000