Loading presentation...

Present Remotely

Send the link below via email or IM

Copy

Present to your audience

Start remote presentation

  • Invited audience members will follow you as you navigate and present
  • People invited to a presentation do not need a Prezi account
  • This link expires 10 minutes after you close the presentation
  • A maximum of 30 users can follow your presentation
  • Learn more about this feature in our knowledge base article

Do you really want to delete this prezi?

Neither you, nor the coeditors you shared it with will be able to recover it again.

DeleteCancel

Make your likes visible on Facebook?

Connect your Facebook account to Prezi and let your likes appear on your timeline.
You can change this under Settings & Account at any time.

No, thanks

CONTROL DE CALIDAD EN OBRA

No description
by

on 20 November 2013

Comments (0)

Please log in to add your comment.

Report abuse

Transcript of CONTROL DE CALIDAD EN OBRA

CUIDADO DE LA OBRA
NORMAS TECNICAS A ADOPTARSE EN LA CONSTRUCCION DE LA OBRA
ENCOFRADO Y DESENCOFRADO NORMAL PARA ESTRUCTURAS
Los encofrados se usaran para confinar el concreto y darle la forma de acuerdo a las dimensiones requeridas y deberán estar sujetos a las normas ACI 347-68.
Estos deben de tener la capacidad suficiente para resistir las presiones resultantes de la colocación y vibrado del concreto y la suficiente rigidez para mantener las tolerancias especificadas. El ingeniero supervisor residente aprobara la madera de utilizarse, de acuerdo con estas especificaciones y serán diseñadas para producir unidades de concreto idénticas en forma, líneas y medidas, a las unidades mostradas en los plano.
Los encofrados deberán poseer un adecuado sistema de arriostre, para mantener su posición y su forma durante el vaciado y el endurecimiento del concreto.
Los encofrados deberán ser sellados y ajustados, para evitar pérdidas del mortero durante el vaciado.
CONTROL DE CALIDAD EN OBRA
Expediente Técnico “Fortalecimiento de Capacidades y Mejoramiento del Sistema de Riego por Aspersión en el Centro Poblado Huiñacc y Huayllaccoto”

Este es un sistema de procedimientos y normas por las cuales el constructor, fabricante de materiales, etc., controla las propiedades del trabajo terminado. El control de calidad hace parte de los Criterios de Calidad. Es una función del contratista o fabricante. Debemos recordar que independientemente de que tan sofisticado sea el programa, este en si no garantiza un producto de calidad. LO ESTAMOS HACIENDO BIEN?

El Contratista cuidará la obra de la buena conservación de los trabajos ejecutados,tomando para ello todas las medidas necesarias de seguridad.
El desmonte proveniente de la limpieza será eliminado a un botadero debidamente designado.
El Contratista en la obra por cuenta propia habilitará un ambiente para la Oficina de inspección, donde guardará copia de todos los planos, presupuestos y especificaciones técnicas. EL RESIDENTE DE OBRA podrá en esa Oficina consultar los documentos,teniendo libre acceso a la obra, para la revisión de los trabajos.
La construcción de la obra, se efectuará de conformidad con las siguientes Normas y
Reglamentos:
Reglamento Nacional de Construcciones
Normas ITINTEC
Normas Peruanas de Concreto
Normas A. C. I. (American Concrete Institute)
Normas A.S.T.M. (American Society for testing and materials)
Normas A.A.S.H.O. (American Association of State Hihway Officials)
COMO VERIFICAR LA
CALIDAD DE LA OBRA
REVOQUES Y ENLUCIDOS EN RESERVORIO
Esta partida se refiere al tarrajeo que debe de hacerse en muros a fin de cumplir con lo especificado en los planos respectivos. El Ing. Residente debe ordenar una mezcla,de cemento y arena fina, en una proporción de 1:3, más impermeabilizante, la misma que debe de aplicarse en superficies limpias y debidamente humedecidas
.
TARRAJEO DEL TIPO RAYADO O PRIMARIO CON MORTERO DE 1:5
Las caras exteriores que no van estar en contacto con el agua, serán enlucidas
utilizando mortero de cemento - areno y sin la participación de aditivos
impermeabilizantes.
El revoque será ejecutado previa limpieza y humedecimiento de las superficies donde debe ser aplicado.
La mezcla de mortero será de la siguiente proporción:
Mortero cemento – arena para pañeteo, proporción 1:5.
Estas mezclas se preparan en bateas de madera perfectamente limpias de todo residuo anterior.
La superficie a obtener serán planas, sin resquebraduras, aflorescencias o defectos.
Los tubos de instalación empotrados deberán colocarse a mas tardar antes del inicio
del tartajeo, luego se resanara la superficie dejándola perfectamente al ras si que
ninguna deformidad marque el lugar en que ha sido picada la pared para este trabajo.
REFINE, NIVELACION Y FONDOS TUBERIA HASTA 6”INCLUYE CAMA DE
APOYO
Para proceder a instalar las líneas de agua, previamente las zanjas excavadas deberán
estar refinadas y niveladas.
Consiste en el perfilamiento tanto de las paredes como del fondo, teniendo especial cuidado que no quede, protuberancias rocosas que hagan contacto con el cuerpo del tubo
La nivelación se efectuará en el fondo de la zanja, con el tipo de cama de apoyo aprobada por la supervisión.
CAMA DE APOYO PARA TUBERIA
Mínimo índice de plasticidad 15%
Mínimo que pase por la malla Nº 200 de la serie Sieve 25%
El material para rellenos será arcilla u otro material impermeable aprobado por el Ingeniero Supervisor.
Los rellenos no podrán tener escombros árboles, troncos, materiales en pie o entrelazados, raíces o basura. Antes de comenzar la construcción se eliminará el césped, humus u otra materia orgánica; igualmente la zona del terraplén será movida (arada) de tal manera de que el material del terraplén se adhiera al terreno natural.
Todos los agujeros causados por la extracción de tacones y la corrección de todas las irregularidades en la zona serán rellenados con material selecto.
COMPACTACION
El material para la formación de los rellenos será colocado en capas
horizontales de 20 a 30 cm de espesor y que abarque todo el ancho de la sección esparcidas suavemente, con equipo esparcidor u otro equipo aplicable. Capas de
espesor mayor de 30 cm no serán usadas sin autorización del Ingeniero Supervisor.
Los rellenos por capas horizontales deberán ser ejecutados en una longitud que hagan
factible métodos de acarreo, mezcla, riego o secado y compactación usados.
Piedra o roca en rellenos de tierra no deberán exceder de 15 cm medidos en su Espesor máximo.