Loading presentation...

Present Remotely

Send the link below via email or IM

Copy

Present to your audience

Start remote presentation

  • Invited audience members will follow you as you navigate and present
  • People invited to a presentation do not need a Prezi account
  • This link expires 10 minutes after you close the presentation
  • A maximum of 30 users can follow your presentation
  • Learn more about this feature in our knowledge base article

Do you really want to delete this prezi?

Neither you, nor the coeditors you shared it with will be able to recover it again.

DeleteCancel

Make your likes visible on Facebook?

Connect your Facebook account to Prezi and let your likes appear on your timeline.
You can change this under Settings & Account at any time.

No, thanks

Maryland Medical System

No description
by

Victoria Lippmeier

on 18 June 2013

Comments (0)

Please log in to add your comment.

Report abuse

Transcript of Maryland Medical System

University of Maryland Medical System
Who we are
Nationally ranked firm within the top:
50 Program Management Firms (ENR)
500 Design Firms (ENR)
250 Architectural Firms (ENR)
100 Construction Management-for-Fee/ PM Firms (ENR)
Hispanic Business Top 500 (Ranked 109 - 2012)
Professional Employees
48 Technical & Scientific Disciplines
Over 140 Licensed Professional Staff
Over 20% with Masters & Ph.D. Degrees
CSA Offers Diversity and Proven Performance
Certified MBE with University of Maryland Medical System
CSA Central, Inc. is a National Minority Supplier Development Council (NMSDC®) Corporate Plus® Member
Certified MBE by Prince George's County
Supplier Development and Diversity Division
Certified MBE by Howard County, MD
New York
New Jersey
Washington, D.C.
Pennsylvania
Florida
Puerto Rico
Our Regional
Operations
“Quality Service throughout the US, Caribbean and Latin America”
Argentina
Haiti
Mexico
Panama
Peru
UNITED STATES
CENTRAL AND
SOUTH AMERICA
Maryland
“The Ideal ‘Green’ Building System Promotes Efficiency, Durability And Occupancy Comfort… Equally”
Servicing Our Clients with a Focus
on Asset Optimization
Architecture and Engineering
Site Evaluation
Conceptual/Feasibility Studies
Infrastructure Gap Analysis
Asset Evaluation and Management
Sustainable Design to Reduce Energy Cost
Investment Grade Energy Audits
Energy Conservation Measures
LANDOVER
Metro-Plex I
8401 Corporate Drive
Suite 470
Landover,
MD 20785-2224
Medical/Science Centers
Medical Facilities Experience
Interiors/MEP
SUNY Stony Brook Health Science Center 9 Electrical Substations Retrofit
State University of NY

William Paterson University Science Hall Renovation
WPU/HOK Architects

Columbia University Russ Berrie Medical Science Pavilion Biomedical Science & Technology Park
Columbia University/DBB Architects

University of Pennsylvania Biomedical Engineering Building
University of Pennsylvania
1
2
3
4
1
2
3
4
Medical/Science Centers
Pennsylvania Hospital RenovationPennsylvania Hospital

NJIT CHEN New Laboratory Research Building & Classrooms-
NJIT/Ronald Schmitt ArchitectsNorth

Central Bronx Hospital Renovations NYC Health and Hospitals Corp.

University of Puerto Rico – New Molecular Science Center
Puerto Rico Infrastructure Financing Authority
1
2
3
4
1
2
3
4
Medical Facilities Experience
Exteriors/Civil/Site
Healthcare Facilities
Miami Children’s Hospital Helistop and Medical Building
Miami Children’s Hospital

Texas Tech University Health & Science Center
Texas Tech University

VA Hospital Electrical Distribution System Upgrade
Veterans Administration Caribbean Healthcare System

St. Croix Cardiac are Center HKS Architects
1
2
3
4
1
2
3
4
Medical/Science Centers
Cleveland Clinic Weston
Marshall Erdmann & Associates

Coral Springs Medical Center Emergency Department Expansion
HDR Architecture

Imperial Point Medical Center Emergency Department Expansion
HDR Architecture, Inc.

Baptist Health Town & Country Corporate Medical Facility
TLC Engineering
1
2
3
4
1
2
3
4
Energy Performance
Assessment
Project Experience
Energy Conservation
Dr. Pila Hospital Energy ConservationSavings: $78,000/year

Polytechnic University of Puerto Rico Energy Audits & Conservation Measures.
Savings: $85,140/year

DASNY South Beach Psychiatric Center Building #5 Building Energy Modeling Report
Savings: $326,800/year

PITUSA Stores Energy Audits & Conservation Measures
Savings: $40,850/year
1
2
3
4
1
2
3
4
Energy Conservation
Paseo Verde Affordable & Market-Rate Transit Oriented Housing
Wallace Roberts & Todd

Maintenance & Operations Facility for The High Line Park New York
The City of New York Department of Parks and Recreation

Philadelphia Water Department HVAC & Electrical Lighting Energy
Black & Veatch

East 125th Street Firehouse Adaptive Re-use Project NYC Economic Development Corporation
1
2
3
4
1
2
3
4
Integrated Design/
Energy Efficiency Modeling
Process Overview
BIM Modeling (REVIT)
CSA Group’s goal is to deliver a full Virtual Design and Construction (VDC) package to all of our clients regardless of project size or budget.

Key to Success:




BIM can streamline construction and improve quality:
Careful Front-end Planning
Continuous Monitoring and Modifications as Project Progresses
Facilitating early procurement of various construction elements
Eliminating costly coordination errors and complex shop drawing production
BIM Pre-Design and Analysis
Building and Energy Modeling
Massing model of existing building footprint with exact site location provides weather data, and utility information from nearest weather station history.
Building and Energy Modeling
Building information such as construction assembly U-values, mechanical equipment, and glazing percentages based on site survey are added to massing model, providing in depth building energy use reports.
Building and Energy Modeling
Building Model data is migrated into advanced energy modeling software and actual HVAC Equipment Data, and building constructions are entered. ECMs are entered and compared.
Building and Energy Modeling
Having identified the most effective ECMs based on initial investment and return on investment, information is put back into the building model for construction documentation.
New chiller with cooling tower VFDs
Upgrade All lighting and controls
Double Pane Sliding Glass Doors & Double Pane Windows
Cool roof, roof insulation and PV shade canopies
Common area and guest room faucet flow controls, high efficiency transformers, VFDs on pool pumps and domestic hot water pumps, refrigeration and vending machine optimization
Improved Thermostat and ventilation measures
Baseline vs. ECM Implementation Comparison
BIM- Facilities Management
Program Management
Managing a Portfolio of Projects
Faster response to changes in a project ’s environment
Consistent approach to evaluation of project’s performance
Efficient channel for communication of project’s information and status
Conduit for escalation of project issues
Coordinates and manages relationships between
multiple projects
Provides high level view of project(s) to Senior Management
Ensures adoption of uniform standards by every project
Knowledge repository for project’s information
Program Management Benefits
Program Management Office Approach
Program Management
Puerto Rico American Recovery and Reinvestment Act/ Puerto Rico Infrastructure Finance Authority

Program Management of FEMA -Financed Repairs to Infrastructure Damaged by Hurricane Irene

Program Management of the Capital Improvement Program for PRASA’s East Region

City of Miami General Engineering Consultant
1
2
3
4
1
2
3
4
Program Management
Diverplex Program Management - Puerto Rico Department of Transportation and Public Works

City of Miami General Engineering Consultant

Puerto Rico Convention Center District

Cincinnati Public Schools Capital Improvement Program
1
2
3
4
1
2
3
4
Medical Facilities Experience
Exteriors/Civil/Site
Healthcare Facilities
Miami Children’s Hospital Helistop and Medical Building
Miami Children’s Hospital

Texas Tech University Health & Science Center
Texas Tech University

VA Hospital Electrical Distribution System Upgrade
Veterans Administration Caribbean Healthcare System

St. Croix Cardiac Center HKS Architects
1
2
3
4
1
2
3
4
Medical/Science Centers
Cleveland Clinic Weston
Marshall Erdmann & Associates

Coral Springs Medical Center Emergency Department Expansion
HDR Architecture

Imperial Point Medical Center Emergency Department Expansion
HDR Architecture, Inc.

Baptist Health Town & Country Corporate Medical Facility
TLC Engineering
1
2
3
4
1
2
3
4
Medical
Facilities
Exteriors/
Civil/Site
Medical Facilities Experience
Interiors/MEP
Medical/Science Centers
SUNY Stony Brook Health Science Center 9 Electrical Substations Retrofit
State University of NY

William Paterson University Science Hall Renovation
WPU/HOK Architects

Columbia University Russ Berrie Medical Science Pavilion Biomedical Science & Technology Park
Columbia University/DBB Architects

University of Pennsylvania Biomedical Engineering Building
University of Pennsylvania
1
2
3
4
1
2
3
4
Medical/Science Centers
Pennsylvania Hospital
Renovation

New Jersey Institute of Technology CHEN New Laboratory Research Building & Classrooms-
NJIT/Ronald Schmitt ArchitectsNorth

Central Bronx Hospital Renovations NYC Health and Hospitals Corp.

University of Puerto Rico – New Molecular Science Center
Puerto Rico Infrastructure Financing Authority
1
2
3
4
1
2
3
4
Medical
Facilities
Interiors/
MEP
Completed Projects for an Aggregate of over $400 Million
Completed Projects for an Aggregate of over $75 Million
Energy Performance
Assessment
Project Experience
Energy Conservation
Paseo Verde Affordable & Market-Rate Transit Oriented Housing
Wallace Roberts & Todd

Maintenance & Operations Facility for The High Line Park New York
The City of New York Department of Parks and Recreation

Philadelphia Water Department HVAC & Electrical Lighting Energy
Black & Veatch

East 125th Street Firehouse Adaptive Re-use Project NYC Economic Development Corporation
1
2
3
4
1
2
3
4
Energy Conservation
Completed Projects
Resulting in Annual
Savings of over
$1 Million / year
Program Management
Completed Projects for an Aggregate of over $11 Billion
Energy Efficient Design
Renewable Energy
Completed Projects for an Aggregate of over $150 Million
Completed Projects for an Aggregate of over $875 Million
Presentation
of Qualifications
X
Potential Location for New Regional Prince George's County Medical Center
X
An MBE firm with proven depth of resources and experience
to tackle any job regardless of size or complexity.
Our Business Model is based on partnership with our Clients from start to finish. We excel in Owner’s Representative role.
True Full Service Project Delivery Company with ability to customize any variety or levels of service:





All required disciplines provided in-house, with a focus on efficient design and engineering.
Our Value
Architecture, MEP and Civil Engineering, Energy Conservation
Supported by proven Project Management Protocols and Program Management tools to address a portfolio of projects of all sizes and complexity.
Summary
How can CSA help UMMS?
Energy Conservation
Dr. Pila Hospital Energy ConservationSavings: $78,000/year

Polytechnic University of Puerto Rico Energy Audits & Conservation Measures.
Savings: $85,140/year

DASNY South Beach Psychiatric Center Building #5 Building Energy Modeling Report
Savings: $326,800/year

University of Miami Health System
Energy Performance Assessment
1
2
3
4
1
2
3
4
AGENDA
Medical Facilities Experience
Exteriors/Civil/Site
Interiors/MEP
Who we are
Energy Performance Assessment
Program Management
Our Value
Full transcript