Loading presentation...

Present Remotely

Send the link below via email or IM

Copy

Present to your audience

Start remote presentation

  • Invited audience members will follow you as you navigate and present
  • People invited to a presentation do not need a Prezi account
  • This link expires 10 minutes after you close the presentation
  • A maximum of 30 users can follow your presentation
  • Learn more about this feature in our knowledge base article

Do you really want to delete this prezi?

Neither you, nor the coeditors you shared it with will be able to recover it again.

DeleteCancel

Make your likes visible on Facebook?

Connect your Facebook account to Prezi and let your likes appear on your timeline.
You can change this under Settings & Account at any time.

No, thanks

Final Year Project Proposal : Industrialized Building System

No description
by

mai ishak

on 3 June 2014

Comments (0)

Please log in to add your comment.

Report abuse

Transcript of Final Year Project Proposal : Industrialized Building System

LITERATURE REVIEW
PROBLEM STATEMENT
There is no clear procedure available for design of IBS Structure.
There is no clear information available for design and analysis for component of precast concrete structure.
The SAP2000 software are not widely used in IBS industry
METHODOLOGY
EXPECTED RESULT
Three characteristic will be observe that are:
Maximum moment
Maximum shear
Maximum deflection
CONCLUSION
The analysis of precast concrete can be carried out in two ways that are manual calculation and using SAP2000.
The differences between IBS and conventional method can be seen using the result from SAP2000.
The understanding of joint connection is important in either Industrialize Building System or conventional method as it affect the load distribution, strength and stability.
INDUSTRIALIZED BUILDING SYSTEM:
DESIGN AND ANALYSIS OF PRECAST CONCRETE STRUCTURE

OBJECTIVE
The objective of the project are:

To figure out the procedure of design of IBS structure.
To design and perform an analysis of precast concrete structure of slab, beam and column.
To compare the manual calculation of analysis with SAP2000 software.
To investigate the differences between conventional method and Industrial Building System method using SAP2000 software.
Theoretically, all three values for pinned connection must be greater than rigid connection
SITI UMAIRA ISSHAM BINTI ISHAK
158407

SUPERVISOR : DR FARZAD HEJAZI
SCOPE OF STUDY
INTRODUCTION
Overall Flowchart
Pre-planning
Determine the objective and type of IBS group to be analyze
Carried out manual calculation
Determine the design procedure for precast concrete
Analysis structure using SAP2000 software
The structure component is analyze using software
Compare the result
For precast concrete, the manual and software result is compare
The structure to be analyze is chosen
Design the structural component of slab, beam and column using precast concrete
Bending Moment Diagram of structural component from conventional method is analyzes
Bending moment diagram of IBS and Conventional method is differentiate
Beam design calculation
Design of Column
Comparing the bending moment diagram from analysis using SAP2000
REFERENCES
THANK YOU
Supervisor :Dr. Farzad Hejazi
Examiners:
Dr.Izian Abd. Karim
Ir.Dr.Raizal Saifulnaz Muhamad Rashid
Advantage and disadvantages of precast concrete construction
IBS Content Scoring System
(IBS SCORE)
A manual which provide a complete guidance to evaluate the IBS Score for any building project.
IBS Score is the score for computing the total IBS component used in a building project as set out in the manual.
The IBS Score manual provide:
IBS Score Formula
IBS Factor for each of the elements used
Methods of calculating the IBS Score
Notes and sample calculations
Differences between pinned and rigid connection
behavior of beam to column connection is assumed to be rigid, semi-rigid or pinned.
connection between precast and monolithic
Precast structure performed better than the monolithic due to the welding at reinforcement lapping which increased the joint reinforcement.
All the joins part are sufficiently stiffed. It occur when no relative rotational movement of beam is transferred completely to column.
Does not allow transmission of movement to the columns and it has no stiffness which indicate that it is free to rotate under loading.
The structure that will be analyzed is a double storey house which will be constructed using Industrialize Building System
The Industrialize Building System used pinned connection in the construction
A technique of construction in which the manufactured of component is carried out in a controlled environment and then transported to site for position and assemble. CIDB Malaysia (2001)
Conventional method normally used rigid connection.
Therefore, the double storey house will be analyze with both rigid and pinned connection to get the differences.
The structural components that involve in the analysis are beam, column and slab.
i. DAN E. BRASON(1978), PCI design handbook–precast pre-stressed concrete, Pre-stressed Concrete Institution.
ii. Geraldine S. Cheok, H.S.Lew (1991), Performance of Precast Concrete Beam to Column Connections
Subjected to Cyclic Loading, PCI journal.
iii. Gary Cudney, P.E (1998), Precast vs. Post-in-Plane
Pinned connection
Rigid connection