Loading presentation...

Present Remotely

Send the link below via email or IM

Copy

Present to your audience

Start remote presentation

  • Invited audience members will follow you as you navigate and present
  • People invited to a presentation do not need a Prezi account
  • This link expires 10 minutes after you close the presentation
  • A maximum of 30 users can follow your presentation
  • Learn more about this feature in our knowledge base article

Do you really want to delete this prezi?

Neither you, nor the coeditors you shared it with will be able to recover it again.

DeleteCancel

PRESUPUESTO Y CONTROL DE MANO DE OBRA

No description
by

ober mallqui

on 10 March 2017

Comments (0)

Please log in to add your comment.

Report abuse

Transcript of PRESUPUESTO Y CONTROL DE MANO DE OBRA

PRESUPUESTO Y CONTROL DE LA MANO DE OBRA
3.5.1 PLANIFICACIÓN DE LA MANO DE OBRA DIRECTA
ESTE PRESUPUESTO CUBRE LAS NESIDADES DE LA MANO DE OBRA DIRECTA PARA PRODUCIR LAS CANTIDADES DE DIFERENTES PRODUCCIONES PLANIFICADAS,Y ESTE SE LE ASIGNA AL FUNCIONARIO DE LA PRODUCCION POR DEPARTAMENTOS.
CALCULO DE MANO DE OBRA DIRECTA
3.5.2 ESTRUCTURA DEL PRESUPESTO DE MANO DE OBRA
ESTE PRESUPUESTO DEBE GUARDAR ARMONIA CON EL PLAN ANUAL DE UTILIDADES,Y DEBE MOSTRAR LAS HORAS PLANIFICADAS Y EL COSTO,LA POLITICA Y PLANES DE LAS CUOTAS PROMEDIO Y ESTANDAR DE SALARIOS.
CLASIFICACIÓN DE MANO DE OBRA
5.5.3 CONTROL DEL COSTO DE MANO DE LA MANO DE OBRA DIRECTA
EL CONROL EFICAZ DEPENDE DE UNA COMPETENTE SUPERVISION,DE LA OBSERVACION DIRECTA Y DE LOS INFORMES DEL DESEMPEÑO DE SU LABOR,Y AL FINAL SE COMPARAN CON LOS RESULTADOS REALES.
Conclusion
EL PRESUPUESTO Y EL CONTROL DE LA MANO DE OBRA ES UN PROYECTO DETALLADO,EN LA CUAL SE RELACIONAN CON EL PRESUPUESTO DE PRODUCCION Y LOS NIVELES DE INVENTARIOS SEGUN LOS DEPARTAMENTOS.
EJEMPLO DE CONTROL DE COSTO DE MANO DE OBRA DIRECTA