Loading presentation...

Present Remotely

Send the link below via email or IM

Copy

Present to your audience

Start remote presentation

  • Invited audience members will follow you as you navigate and present
  • People invited to a presentation do not need a Prezi account
  • This link expires 10 minutes after you close the presentation
  • A maximum of 30 users can follow your presentation
  • Learn more about this feature in our knowledge base article

Do you really want to delete this prezi?

Neither you, nor the coeditors you shared it with will be able to recover it again.

DeleteCancel

Make your likes visible on Facebook?

Connect your Facebook account to Prezi and let your likes appear on your timeline.
You can change this under Settings & Account at any time.

No, thanks

_PRESENTACION_OFICIAL_PFC_SAMUEL_MIGUEZ_21022014

No description
by

Samuel Miguez Bermudez

on 20 February 2014

Comments (0)

Please log in to add your comment.

Report abuse

Transcript of _PRESENTACION_OFICIAL_PFC_SAMUEL_MIGUEZ_21022014

1- MOTIVACIÓN Y OBJETIVO DEL PROYECTO
2- METODOLOGÍA TOPOGRÁFICA
3- DISEÑO DEL TRAZADO
4- MOVIMIENTO DE TIERRAS Y EXPROPIACIÓN
5- PRESUPUESTO

CONTENIDO

1-SITUACIÓN


1. MOTIVACIÓN Y OBJETIVO DEL PROYECTO

3- SOLUCIÓN ADOPTADA

1ª fase: 10.054,31 m2

2ª fase: 8.514,27 m2

3ª fase: 48.873,17 m2

1. MOTIVACIÓN Y OBJETIVO DEL PROYECTO


1- PAUTAS GENERALES:

ESCALA DEL LEVANTAMIENTO TOPOGRÁFICO: 1/1000

SISTEMA DE REFERENCIA: ETRS89

PROYECCIÓN UNIVERSAL TRANSVERSA DE MERCATOR (UTM)

EQUIDISTANCIA CURVAS DE NIVEL: 1 M. (MAESTRAS: 5 M.)

ALTITUD DEL MAR: REFERIDA AL NIVEL MEDIO DEL MAR EN ALICANTE


2. METODOLOGÍA TOPOGRÁFICA


2- OFICINA TÉCNICA PREVIA:


DISTANCIA MÁXIMA DE RADIACIÓN: 565 M.


NÚMERO MÁXIMO DE TRAMOS POR POLIGONAL: 4 TRAMOS





2. METODOLOGÍA TOPOGRÁFICA


2- OFICINA TÉCNICA PREVIA:




CREACIÓN DE LA RED TOPOGRÁFICA

RED BÁSICA: METODOLOGÍA GPS (RTK)

RED INTERMEDIA: POLIGONALES (ESTACIÓN TOTAL)

RED DE DETALLE: RADIACIÓN (GPS + E.T. + E.T. LÁSER)




2. METODOLOGÍA TOPOGRÁFICA


2- OFICINA TÉCNICA PREVIA:

RED BÁSICA (GPS)




2. METODOLOGÍA TOPOGRÁFICA


2- OFICINA TÉCNICA PREVIA:

RED INTERMEDIA (E.T.)






2-TOLERANCIA EN LAS POLIGONALES:






2-TOLERANCIA EN LAS POLIGONALES:





2. METODOLOGÍA TOPOGRÁFICA


1- NORMATIVA

PXOM TERMINO MUNICIPAL DE XOVE (RECIENTE APROBACIÓN AÑO 2012)

DOCUMENTO VI: NORMAS URBANÍSTICAS

NORMA 5: NORMAS XERAIS DE URBANIZACIÓN
NORMA 7: NORMAS PARTICULARES (CAPITULO III: SISTEMA VIARIO)



NORMA 3.1 Instrucción de Carreteras: Casos en los que no se contempla el PXOM






3. DISEÑO Y TRAZADO

2- ACTUACIONES PREVISTAS (EJES)


PAVIMENTACIÓN:

(NORMA 6.1 I.C.)

-Capa 16 cm. mezclas bituminosas

-Capa 40 cm. zahorra







2- ACTUACIONES PREVISTAS

2- ACTUACIONES PREVISTAS (SECCIÓN TIPO)





5. PRESUPUESTO





4.1 MOVIMIENTO DE TIERRAS

1. MOTIVACIÓN Y OBJETIVO DEL PROYECTO

2- MOTIVACIÓN


2. METODOLOGÍA TOPOGRÁFICA

2. METODOLOGÍA TOPOGRÁFICA


2- OFICINA TÉCNICA PREVIA:

RED DE DETALLE (GPS + E.T. + E.T. LÁSER)





4.2 EXPROPIACIÓN

2. METODOLOGÍA TOPOGRÁFICA




Familia, en especial: Jesus Míguez, Teresa Bermúdez, Lucía Bermúdez, Jesus Maragoto.



Richard Redondas, Ángel Fernández (Estación total láser Trimble).



Rebeca López, Alberto Vilariño, Jose Luis G., Lorena Salgado.



Fco. Javier López.








AGRADECIMIENTOS
Full transcript