Loading presentation...

Present Remotely

Send the link below via email or IM

Copy

Present to your audience

Start remote presentation

  • Invited audience members will follow you as you navigate and present
  • People invited to a presentation do not need a Prezi account
  • This link expires 10 minutes after you close the presentation
  • A maximum of 30 users can follow your presentation
  • Learn more about this feature in our knowledge base article

Do you really want to delete this prezi?

Neither you, nor the coeditors you shared it with will be able to recover it again.

DeleteCancel

Planning Presentation Rev.1

by

Indah Kusuma

on 5 February 2016

Comments (0)

Please log in to add your comment.

Report abuse

Transcript of Planning Presentation Rev.1

1
CIKARANG BEKASI LAUT
2
3
4
5
Kijing Deep Water Port
Sungai Musi dan Lematang
Cikarang Bekasi Laut
Proyek yang saat ini dalam tahap Pre-Konstruksi antara lain:
Deep Water Port
Kijing
Sungai Musi & Lematang
TANJUNG CARAT DEEP SEA PORT
Tanjung Carat & Tanjung Api Api
Pengembangan Pelabuhan Cirebon
LAYOUT TANJUNG CARAT
Pengembangn Pelabuhan Cirebon
Kapasitas Maksimum Terminal

Kontainer
Tahap I : 950.000 TEUs/tahun
Tahap II : 1.000.000 TEUs/tahun
Total : 1.950.000 TEUs/tahun

Curah Cair
Tahap I : 8.340.000 Ton/tahun
Tahap II : 3.840.000 Ton/tahun
Total : 12.180.000 Ton/tahun

Curah Kering : 15.000.000 Ton/tahun

Multipurpose
Tahap I : 500.000 Ton/tahun
Tahap II : 500.000 Ton/tahun
Total : 1.000.000 Ton/tahun

PROGRESS
KENDALA
USULAN KE BOD
CIKARANG BEKASI LAUT
PROGRESS
KENDALA
USULAN KE BOD
Layout Pengembangan Pelabuhan Cirebon
Thank You
LAPORAN KEMAJUAN PROYEK
PROGRESS
Draft akhir Rencana Induk Terminal (RIT)
Koordinasi penyusunan revisi Rencana Induk Pelabuhan
Draft akhir Studi Kelayakan Pengembangan Pelabuhan Cirebon oleh PMLI
KENDALA
Rencana Induk Terminal (RIT) tidak didasari oleh studi kelayakan
Studi kelayakan baru dilaksanakan pada akhir november 2015 dan masih banyak revisi
Feasibility Study
: Pre-FS, Conceptual Barge Design, High Level FS (
will be done)
, Detai FS (
ongoing)
Tata Ruang
: Surat Rekomendas Bupati Kab. Bekasi, Proses Revisi Perpres No. 54 Tahun 2008
Rencana Induk Pelabuhan
: Proses Revisi RIP Tanjung Priok (Penyusunan Draft Final)
Izin Lingkungan
: Environmental Baseline Study
Survey dan Investigasi
(
ongoing
)
RIP Tanjung Priok
dan
Tata Ruang
:
High Level FS belum selesai
Lokasi Inland Terminal masih berubah-ubah
Survey dan Investigasi
:
Pekerjaan tidak dapat on schedule dan terlalu lama
Izin Lingkungan
:
Belum dapat melanjutkan ke tahap AMDAL karena meunggu Detail FS selesai
PROGRESS
KENDALA
USULAN UNTUK BOD