Loading presentation...

Present Remotely

Send the link below via email or IM

Copy

Present to your audience

Start remote presentation

  • Invited audience members will follow you as you navigate and present
  • People invited to a presentation do not need a Prezi account
  • This link expires 10 minutes after you close the presentation
  • A maximum of 30 users can follow your presentation
  • Learn more about this feature in our knowledge base article

Do you really want to delete this prezi?

Neither you, nor the coeditors you shared it with will be able to recover it again.

DeleteCancel

Make your likes visible on Facebook?

Connect your Facebook account to Prezi and let your likes appear on your timeline.
You can change this under Settings & Account at any time.

No, thanks

Copy of Build Your Ideas - Free Prezi Template

Illustrate how you build your ideas with this free Prezi Template including Construction Machinery visuals. Download from Prezibase.com or save a copy right here
by

Jack Farley

on 17 May 2014

Comments (0)

Please log in to add your comment.

Report abuse

Transcript of Copy of Build Your Ideas - Free Prezi Template

ENGINEERING ETHIC
GROUP 2

INTRODUCTION
Engineering Ethics
Applied Ethics
System Of Moral Principles
The practice of engineering
HKIE CODE OF CONDUCT
Uphold the
dignity
and
reputation
of the Institution
Act with
fairness
and
integrity
towards all persons
HKIE CODE OF CONDUCT
Rule 1 - Responsibility to the Profession
Rule 2 - Responsibility to Colleagues
Rule 3 - Responsibility to Employers or Clients
Rule 4 - Responsibility to the Public

STATE: 1. Lack of thorough and serious review to the initial design.

careful review and calculation shall be performed before the initial design is established


STATE: 2. Lack of communication with the contractor company.

design documents shall be checked
clearly presented to the contractor before the construction work.



STATE: 3. Gross negligence of resident engineer was shown in this case.

resident engineers shall take the responsibility of supervision to ensure the construction work is conducted according to the finalized design.
resident engineer shall ensure the construction work satisfies the quality and safety requirement.

What lead the disaster to occur?
Failure of the cross-beam at weld joint
Significant change of original design.
It required the whole of the rod below the fourth floor to be screw threaded.

These threads would probably have been damaged and unusable as the structure for the fourth floor
Why the design was changed?
Lack of proper communication between Jack D. G, Associates and Havens Steel.

The drawings prepared by Jack D. G and Associates were only preliminary sketches but were interpreted by Havens as finalized drawings.

Jack D. G and Associates failed to review the initial design thoroughly, and accepted Havens' proposed plan without performing basic calculations that would have revealed its serious intrinsic flaws

Why the change design was approved?
Hyatt Regency Kansas City

Location: in Kansas City, Missouri, the USA

Height: 504.0 ft (153.62 m), 45-story hotel

Functional area:42,860 sq ft (3,982 m2)

Open Time: opened on July 1, 1980

Disaster: 114 deaths and 219 injuries.
Case Background

Rule 1 Responsibility to the Profession

Rule 2 Responsibility to Colleagues

Rule 3 Responsibility to Employers or Clients

Rule 4 Responsibility to the Public


State: 1.The signification mistake occurred but not engineers noticed that.

Neither the resident engineer nor the site engineer held their duty.
The engineers should inspect the construction work carefully.
Discussion on contractor’s work
Discussion on contractor’s work

State: 2. The construction method in not feasible.

The contractor engineer redesigned the detail of connection and without notice to consultant.
The structural component redesign work should return to consultant.



State: 3. The redesign specification required approval from the Engineer.

The contractor Engineer should be able to realize the redesign specification is not qualified but still approve it.
The contractor Engineer should check the submitted specification carefully.


Discussion on consultant’s work
Hyatt Regency walkway collapse. (2014, May 12). In Wikipedia, The Free Encyclopedia. Retrieved 06:01, May 16, 2014, from http://en.wikipedia.org/w/index.php?title=Hyatt_Regency_walkway_collapse&oldid=608171265
Reference
Thanks for your attention!

Group member
DB028972 LIAO HAO
DB027176 CHU CHI WAI
DB027613 HE NI YI
DB028942 LIU YUE TING
DB028402 KUOK CHI CHONG
DB027149 HUANG JIAN WEI
Original design:

cross-beam in fourth floor support the weight from fourth walkway.
Actual design:

cross-beam in fourth floor support the weight from fourth and second walkway.
HUMBLE, CAUTIOUS , RELIABLE