Loading presentation...

Present Remotely

Send the link below via email or IM

Copy

Present to your audience

Start remote presentation

  • Invited audience members will follow you as you navigate and present
  • People invited to a presentation do not need a Prezi account
  • This link expires 10 minutes after you close the presentation
  • A maximum of 30 users can follow your presentation
  • Learn more about this feature in our knowledge base article

Do you really want to delete this prezi?

Neither you, nor the coeditors you shared it with will be able to recover it again.

DeleteCancel

Make your likes visible on Facebook?

Connect your Facebook account to Prezi and let your likes appear on your timeline.
You can change this under Settings & Account at any time.

No, thanks

Untitled Prezi

No description
by

Shatha Alshantir

on 17 June 2014

Comments (0)

Please log in to add your comment.

Report abuse

Transcript of Untitled Prezi

**Amana’s growth and success can be characterized by :

1.Focusing on customer requirements and consistently beating expectations.

2.Attracting, developing and retaining the
best talent available.

SUCCESS
Empowering local management: fostering fast decision making processes and allowing for information sharing via AmanaTech®, our proprietary Enterprise Resource Planning system.
Today, Amana has offices in eleven cities across seven countries. Each office is independently run with capabilities to market, design, procure, and construct projects on a full design-build basis
The Amana offices are located in:
AMANA
Amana is the regional contracting leader in the design-build construction of industrial and commercial facilities, with over 1500 buildings constructed across the region
***
History
Founded in Abu Dhabi on September 12, 1993, the concept of a regional design-build contractor with a decentralized model was conceived by Amana’s CEO, Chebel Bsaibes. Amana is now the regional leader in the design-build of industrial and commercial facilities, with over 1500 buildings constructed across the region

Safety engineering
AMANA
Structured in a decentralized way, the company is able to respond to its clients’ needs in a very quick and efficient way. The company has built its reputation on the ability to offer design-build solutions for extremely fast-track projects

HISTORY
Amana is paving the way in the region with the concept of design-build: engineers at each project-site ensure the delivery of custom-designed, cost-effective solutions to every client. This has in effect, translated into a distinct competitive advantage over other contractors in the region.

Abu Dhabi, United Arab Emirates
Dubai, United Arab Emirates
Sharjah, United Arab Emirates
Doha, Qatar
Kuwait City, Kuwait
Jeddah, Saudi Arabia
Khobar, Saudi Arabia
Riyadh, Saudi Arabia
Sohar, Oman
Cairo, Egypt
Colombo, Sri Lanka

Amana Ranks First for Health and Safety Across ASHGHAL Projects
On April 10, 2014 The Qatari Public Works Authority (ASHGHAL) awarded Amana Qatar Contracting with a certificate for the best health and safety practices for the month March on the healthcare center projects in Doha

Compared against others across ASHGHAL’s 35 ongoing projects, Amana achieved top marks thanks to our comprehensive

Health and Safety Across ASHGHAL Projects:
-Environment, Health, and
-Safety (EHS) management
-system implemented to
- ensure the well-being of all employees
Incidents
*what happened:
in a metal fabrication shop, a forklift was shifting the metal plates. The load was 1.5 m wide and weighed about 2.7 tons. The metal plates were being carried on accustom-made load-handling rack attached to the forks.
The operator traveled with the load elevated about 2 m off the ground so that it could clear welding booth set up near a metal fabrications workstation.
The forklift approached the workstation where the fabricator was welding with his back to the forklift.

The fabricator was wearing a welding helmet and hearing protection. He did not hear the forklift operators attempts to get his attention. Just as the forklift operator applied the brakes, the fabricator turned toward the forklift with its elevated load. The metal plates slid off the forklifts load rack, the forklift tipped forward and the load rack itself slid off the forks
The result
The fabricator was knocked to the ground and suffered serious injuries with fractured and broken bones.
The Accident Causation theory:
The different ways that can lead accident
-Safety procedures such as measurement, inspection, correction, and investigation are ignored or given insufficient attention
-Employees do not receive proper orientation

- Employees are not given sufficient safety training

Corrective and preventive measures
Manufacturer instruction shall be followed strictly while using any forklifts.
. Manufacturer shall be consulted before using any custom-made load-handling attachments, racks or pallets that may affect the stability and rated capacity of forklifts.
. Provide specific written safe work procedures for the operation of forklifts.
Train the forklift operators on the specific
procedures.
Provide adequate training to employees
and insure competent supervision
Develop specific risk assessments based on hazards specific to the worksite, and make sure they are enforced.
. Ensure that mobile equipment operators are directed by signaler with an unobsructed view of the area that the vehicle is backing into.
. Keep forklift routes clear, if necessary ,change workplace layout to keep forklift traffic away from workstations and pedestrians.

A set of procedures that had to be done to avoid such an incident
1- Use an effective means of communication to alert workers who are in the operating forklift and deploy signal man.
2- Ensure a clear view of the work area before moving loads. Do not travel with an elevated load.

3- Ensure that approved load-handling attachments, racks, or pallets and loads that could shift or slip during operation are property secured. refer manual.
4- Ensure that mobile equipment backup alarms are audible above ambient noise levels
Lessons learned who is responsible person
Contributing _ underlying:
. Improper custom made arrangements_ methods.
. Vision obstruction due to improper lifting.
. Inadequate risk assements.
. No signaler.
. Inadequate operational procedure.

HSE News Corner
* As improvement There is some action was taken by Amana company .
HSE :
Health and Safety Executive
OHSAS :
OHSAS Occupational Health and Safety Management System
OHSAS Occupational Health and Safety Standard
OHSAS Occupational Health & Safety Assessment Series
OHSAS Occupational Health & Safety Advisory Services (est. 2001; UK)
OHSAS Occupational Health, Safety and Security
OHSAS Occupational Health and Safety Assessment Scheme (UK)
OHSAS Occupational Health and Safety Auditing System

1- trainings
.5 external trainings (Basic first aid , fire fighting and rigger) conducted covering 30 employees with atotal of 240 training man-hours.
.internal training were conducted ( on 28 different training courses) across the organization covering 1072 employees with a total of 1362 man-hours.

2- ISO and OHSAS audits
DNV audit (recertification for ISO 9001 and periodic audit for ISO 14001 and OHSAS 18001) was successfully completed during December 2013 , no major non conformances were issued by DNV .
DNV :
DNV: Det Norske Veritas
DNV: District of North Vancouver (British Columbia, Canada)
DNV: Direction Nacional de Vialidad (Argentina)
DNV: Deutscher Nordic Walking Nordic Inline Verband (German walking and skating association)
DNV: Do Not Vote
DNV: Der Norske Veritas

3- year 2013 HSE statistics
Permit to work
A permit to work procedure is a formal written system used to control certain types of work which are potentially hazardous.

.Objective of permit :
The primary objectives of the procedure to ensure proper authorization of designated work.

.The essential features of permit to work:
clear definition of who may authorize particular work .
specific instruction and training .
specific work to be carried out within certain time constraints .

Line management :
.Identify , nature, extend of the job , hazards involved.
.limitation as to the extend of the work and time during.
a system of control must be provided.
.to ensure that the part of the plant , installation or equipment affected by the work is in a safe condition before normal work is resumed.

responsibilities :
clear information , instruction
, training and guidance should
be given to all who have
responsibilities under permit
to work procedure.

Typical permit to work has the following components:
- Date and time, definition of the work to be done , checks and procedure .

THANKS
FOR
LISTENING
OUR
PRESENTATION
Shatha Alshantir (1143126)
Alaa Abu adas (1133630)
shereen abu hardan (1038433)
Alaa Awaly (1136964)
Doha

Alkhawaldh(1133584)
OHSAS
At Occupational Health & Safety Advisory Services (OHSAS), we understand that creating a healthy, safe and supportive environment helps your people and your organisation to flourish.
Occupational Health

Health and Safety

Occupational Hygiene

Counselling and Psychology

Asbestos Management
WHEN OUR PEOPLE
ARE
HAPPY AND
HEALTHY THEY
WILL TAKE BETTER
CARE OF OUR BUSINESS

Their rehabilitation and occupational therapy services are designed to help an organisation manage staff absence and underperformance through illness or injury. Access to qualified Occupational Therapists can benefit both employers and employees in many ways, including:

1-  those absent because of illness or injury are helped to back to work more quickly and safely 
2-  employers receive reliable, objective assessments of an employees’ ability to perform their work duties

Rehabilitation and Occupational Therapy
And……..
-employers are provided with reliable, objective information to help them make decisions about the management of employees with illness or injury .
-employers receive practical advice to help them enable employees to perform their duties safely and reduce the risk of aggravating illness or injury.
-employees are educated on their capabilities to help them perform their duties safely and effectively.

Jobsite Evaluation – This half day evaluatidemands of the job are compared to their current abilities. A report is then produced containing recommendations for modifications or actions to be taken to support the employee at workon assesses an employee’s work environment in order to make recommendations to help them manage a medical condition when at work. The physical .

Workplace Support Programme – The programme is made up of an initial assessment of the employee at work lasting up to 1½ hours, followed by up to four workplace visits, lasting no more than 30 minutes each.The Occupational Therapist works with the employee and employer to develop a workplace support programme to help them perform their role. 

OHSAS Workplace visits
The programme assists people returning to work after an illness or injury, or those who are still at work but experiencing difficulties due to health problems. The type of workplace support provided includes:

1-  advice on workplace adjustments, modifications and equipment
2-  education and advice on the management of symptoms at work
3- education on safe and correct movement techniques and postures
4-  support to develop effective coping strategies for work
5-   follow-up with employee and employer to review and adjust the programme.
AND….
OHSAS( 18001) The Health and Safety
What is OHSAS 18001? 
OHSAS 18000 is an international occupational health and safety management system specification. It comprises two parts, 18001 and 18002 and embraces BS8800 and a number of other publications
Who Wrote It? 
OHSAS 18001 was created via a concerted effort from a number of the worlds leading national standards bodies, certification bodies, and specialist consultancies.
How Can it Help?
-OHSAS helps in a variety of respects... it helps: minimise risk to employees/etc; improve an existing OH&S management system; demonstrate diligence; gain assurance; etc.
-Policies and Procedures 
-Central to OHSAS requirements are strong policies and procedures. To assist in this respect, we can therefore offer a full code of practice. 
Information on the Standard?
OHSAS 18000 actually forms part of the acclaimed Health and Safety Electronic Kit. This includes not only the text from OHSAS 18001/2, but a safety manual, and implementation guide and various other materials and information.
Full transcript