Loading presentation...

Present Remotely

Send the link below via email or IM

Copy

Present to your audience

Start remote presentation

  • Invited audience members will follow you as you navigate and present
  • People invited to a presentation do not need a Prezi account
  • This link expires 10 minutes after you close the presentation
  • A maximum of 30 users can follow your presentation
  • Learn more about this feature in our knowledge base article

Do you really want to delete this prezi?

Neither you, nor the coeditors you shared it with will be able to recover it again.

DeleteCancel

Make your likes visible on Facebook?

Connect your Facebook account to Prezi and let your likes appear on your timeline.
You can change this under Settings & Account at any time.

No, thanks

BIM IMPLEMENTATION

No description
by

Moez Jaffer

on 29 August 2013

Comments (0)

Please log in to add your comment.

Report abuse

Transcript of BIM IMPLEMENTATION

GRUNLEY BIM
MARKETING
RFP Responses / Interviews

Sequence Diagrams
Logistical Planning
Responding to BIM Capabilities

BIM/VDC Outreach

Publications/Case Studies
ESTIMATING / PRE-CON
OPERATIONS
BIM Project Execution Plans/LOD
Construction Modeling
Spatial Coordination Process
Management 2D/3D
On-Site Coordination Technology
(Field BIM)
Laser Scanning Technology
4D Timelier / Construction Sequence
Facility Management Integration/
Building Handover (6D)
Virtual Mockups

TRAINING
Spatial Coordination Process 2D/3D

BIM Execution Plans / BIM Plans / PxP / LOD

BIM Capabilities (on-going case studies)

Prolog - Construction Management Tools

Newforma - Project Information Management

P6 Training

BIM Staff Training/Conferences
BIM + IT
BIM Software / Tools Implementation

Project BIM Software/Hardware Procurement

BIM Software / Workflow Standardizations - The Grunley Way
BIM
SPATIAL COORDINATION (S.C.)
First Step - BIM PLAN!

Identify Coordination Requirements during BIM Planning
Gets project team on same page
Gets trades on same page

BIM Planning Sections:
Software Used
Data Exchange Requirements
Schedule/Process Identified
S.C. - Workflow
BIM is a PROCESS not a deliverable

BIM: Building Information Modeling
VDC: Virtual Design and Construction

Without people there is no BIM, it is 10% technology and 90% sociology. We’re taking a different approach; we’re going to focus on training people on projects and developing process rather than focusing on technology.

Implementation Levels
BIM 1.0: Visualization & Drawings
BIM 2.0: Analysis
BIM 3.0: Simulation/Virtualization

1
2
3
TRAD vs CO-LO CLASHING
Questions?
S.C. - MODEL DEVELOPMENT
Coordination Model Terminology
Design Models - Architect/Engineer
Aggregated Design Models - Architect
Fabrication Models - Subcontractors
Aggregated Design Models - GC

Boilerplate Coordination Workflow
A/E delivers models to Contractor
Contractor Validates BIM and circulates to Sub-Contractors (2D/3D)
Subs develops Fabrication Models for Coordination
Contractor Aggregates Models
Issues Identified and Repeat until Sign-off!
BIM IMPLEMENTATION
BIM IN CONSTRUCTION
BIM / VDC + CONSTRUCTION
Develop BIM Early to gain the most ROI

Build based on identified BIM Uses

Plan resources based on Level of Development (LOD)
S.C. - CONSTRUCTION MODELING
Design Model vs. Construction Model
Design Intent / Specifications
2D vs. 3D Contract Document
Placeholder Objects
No BIM QAQC
BIM in construction is
on the rise!

BIM tools for construction are rapidly growing and becoming more cost effective.
OPERATIONS
BIM
TRADITIONAL COORDINATION MEETINGS
CO-LOCATION COORDINATION MEETINGS
4D Sequencing
Integration with Primavera
Visual Scheduling

Model-Based Estimating / Quantity Take off Models (5D)

Logistical Planning

Design Phase BIM
Day 1
Full transcript