Loading presentation...

Present Remotely

Send the link below via email or IM

Copy

Present to your audience

Start remote presentation

  • Invited audience members will follow you as you navigate and present
  • People invited to a presentation do not need a Prezi account
  • This link expires 10 minutes after you close the presentation
  • A maximum of 30 users can follow your presentation
  • Learn more about this feature in our knowledge base article

Do you really want to delete this prezi?

Neither you, nor the coeditors you shared it with will be able to recover it again.

DeleteCancel

Make your likes visible on Facebook?

Connect your Facebook account to Prezi and let your likes appear on your timeline.
You can change this under Settings & Account at any time.

No, thanks

LEED Submittal Schedule

No description
by

Tim Leung

on 26 August 2013

Comments (0)

Please log in to add your comment.

Report abuse

Transcript of LEED Submittal Schedule

RFP/RFQ
Schematic Design & Design Documentation
Mobilization
Excavation & Services
Enclosure
Finishes
Occupancy
MRp1 - Storage and Collection of Recyclables
SSp1 - Construction Activity Pollution Prevention
MRc2 - Construction Waste Management
Foundation and Structure
IEQc3.1 - Construction IAQ Mgmt Plan: During Construction
IEQc3.1 - Construction IAQ Mgmt Plan: During Construction
Commissioning
IEQc3.1 - Construction IAQ Mgmt Plan: During Construction
WEp1 - Water Use Reduction

IEQc3.2 - Construction IAQ Mgmt Plan: Before Occupancy
EAp1 - Fundamental Commissioning
LEED Submittal Schedule
MRc2 - Construction Waste Management
•Declare that site complies to all site requirements
SSc1 - Site Selection
SSc2 - Development Density and Community Connectivity
SSc3 - Brownfield Redevelopment
SSc4.1 - Alt. Transportation Public Transportation Access
•For Development Density: Provide a satellite photo with project location highlighted and density radius shown.
•For Community Connectivity: Provide an area plan or satellite photo with radius and residential zone/amenities shown.
•Provide a narrative describing the site contamination and remediation efforts undertaken by the project team.
•Letter or executive summary of the report outlining the contamination from an independent environmental assessment firm or relevant regulatory agency confirming that the site is contaminated.
•Provide an area drawing or marked up transit plan showing project location, train routes and walking distance measured from a main entrance. Drawings must have an indication of scale.
•For Transportation Demand Management Plan Option: Provide a copy of the Transportation Demand Management Plan of transportation analysis of the facility including single occupant vehicle reduction calculations.
SSc4.2 - Alt. Transportation: Bicycle Storage & Changing Rooms
SSc4.3 - Alt. Transportation: Low-Emitting & Fuel-Efficient Vehicles
SSc4.4 - Alt. Transportation: Parking Capacity
SSc5.1 - Site Development: Protect and Restore Habitat
SSc5.2 - Site Development: Maximize Open Space
SSc6.1 - Stormwater Design: Quantity Control
SSc6.2 - Stormwater Design: Quality Control
SSc7.1 - Heat Island Effect: Non-Roof
SSc7.2 - Heat Island Effect: Roof
SSc8 - Light Pollution Reduction
•Provide a site plan identifying the location of any bicycle storage/racks and showing/changing facilities. Ensure quantity shown by locations.
SSc4.2 Alt. Transportation - Bicycle Storage & Changing Rooms
•For Alternative-Fuel Re-fuelling Stations: Provide a narrative on type of refuelling station and how capacity is met. Also, provide the draft wording of the signage to be used, and specs or cutsheets of outlets or fueling stations.
•For Fuel-Efficient Vehicles: Provide site plan and signage showing preferred parking spaces. Also, provide a copy of the organization-wide incentive program which supports employee's purchases.
•For Fuel-Efficient Vehicle Sharing: Provide proof of 2 year lease, including type of cars under lease. Also, provide site plan and signage showing preferred parking spaces.
•If parking does not exceed local zoning requirements: 1. Provide a copy of the local zoning bylaw or other regulation confirming zoning requirement. 2. Provide provide drawing highlighting carpool spaces and signage. 3. Provide carpool management plan.
•Other Options: Provide site drawings or photos highlighting carpool spaces and signage or parking plans demonstrating discounts for carpools.
•Greenfield Sites: 1. Provide site drawings and specifications highlighting limits of construction disturbance. 2. Provide a letter from building owner declaring that the open space is intended to stay open for the life of the building.
•Previously Developed/Grade Sites: 1. Provide LEED building site plan. 2. Provide a letter from the building owner declaring that the open space is intended to stay open for the life of the building. 3. Drawing or landscape plan showing species. 4. Provide a narrative describing species selection and maintenance.
•Provide a letter signed by the building owner declaring that the open space is intended to stay open for the life of the building. Also, provide a site plan indicating the open space is provided to document credit compliance.
•Sites with existing imperviousness 50% or less: 1. Provide a SWM plan including the strategies and calculations reported. 2. Provide a SWM plan that demonstrates protection for receiving waterways.
•Sites with existing imperviousness greater than 50%: Provide summary of SWM plan including strategies and calculations reported.
•Provide documentation confirming TSS removal efficiency. Also, provide management plan outlining measures to minimize pollution and eutrophication of waterways.
•Provide a site or landscape plan identifying all hardscape and parking areas at the parking site. Also, provide documentation to confirm SRI values for reflective materials.
•Provide the project roof plan/drawing depicting roof area and highlighting the location and quantity of specific roofing material/ and or vegetated roofing systems.
•For Interior Lighting Compliance:
Option 1: Provide documentation showing the location of automatic controls. And provide documentation detailing the sequence of operation for interior lighting.
Option 2: Provide drawing showing location of automatic shading devices. Provide documentation detailing sequence of operation of automatic shading devices. Provide documentation that the resultant transmittance of the shading devices is less than 10%.
•For Exterior Lighting Compliance: Provide exterior photometric site plans, including the photometric site plan of the parking area.

WEc1 - Water Efficient Landscaping
WEc2 - Innovative Wastewater Technologies
WEp1/c3 - Water Use Reduction
•1. Provide a narrative describing the chosen water fixtures. 2. Provide cistern performance calculations (if applicable).
•1. Provide a landscape drawing including species type. 2. Provide manufacturer documentation of documentation (if controller efficiency was used. 3. Provide stormwater/ greywater performance calculation
•Reducing Potable water use: 1. Provide a narrative desribing measures used to reduced wastewater conveyance. 2. Provide cistern performance calculation.
•Treat and Infiltrate Wastewater: 1. Provide documentation confirm tertiary treatment. 2. Provide plumbing drawings, diagrams detailing on-site water treatment.
EAp1 - Fundamental Commissioning of Building Energy Systems
EAp2 - Minimum Energy Performance

EAp3 - Fundamental Refrigerant Management
EAc1 - Optimize Energy Performance
EAc2 - On-Site Renewable Energy

EAc3 - Enhanced Commissioning
EAc4 - Enhanced Refrigerant Management
EAc5 - Measurement and Verification
•Provide a narrative describing independence and experience of CxA. Include information about 2 or more buildings that the CxA has commissioned, including details support similarity of scope and type to the LEED project building.
•Provide a letter signed by the owner stating that the owner's project requirements have been reviewed and approved.
•Provide a signed contract with defined scope and timing of commissioning services.
•Provide a compliance report from an acceptable independent third party for compliance with either LEED Canada Energy Modeling Rules, or MNECB 1997/ASHRAE 90.1-2007 or modelling report by an individual on CaGBC's Experienced Modellers List.
•If existing building is planning to phase-out CFC-based Refrigerants or Chillers: Provide a copy of the CFC phase-out plan. Also, provide a copy of the detailed calculations and results of a qualified third-party assessment showing that replacement to laternative refrigerants is not economically viable (if applicable for Chillers).
•See EAp2 - Minimum Energy Performance.
•Provide a narrative for any renewable source allocations; describe calculations and assumptions made to analyze the renewable source across the different end uses.
•Provide a narrative which describes on-site renewable energy production system(s) and calculation of these systems.
•Provide the contract between owner and CxA ensuring CxA involvement post-construction.
•Provide a commissioning review report of schematic (approximately 50%) design documents.
•Provide a commissioning review report of final (75% - 90%) design documents.

•Provide a narrative explaining source and derivation of HVAC&R equipment type, including details such as GWPr, ODPr, etc.
•Provide a copy of the M&V plan.
•Provide a narrative describing the recycling facilities as adequate. Also, provide a floorplan showing the area(s) dedicated to recycled material collection and storage.
IEQp1 - Minimum Indoor Air Quality Performance
IEQp2 - Environmental Tobacco Smoke (ETS) Control
IEQc1 - Outdoor Air Delivery Monitoring
IEQc2 - Increased Ventilation
IEQc6.1 - Controllability of System: Lighting
IEQc6.2 - Controllability of System: Thermal Comfort

IEQc7.1 - Thermal Comfort: Design
IEQc8.1 - Daylight and Views: Daylight
IEQc8.2 - Daylight and Views: Views
•Mechanical Ventilation: 1. Provide a completed ASHRAE 62.1-2007 calculator or local version of calculator. 2. Provide a mechanical schedule demonstrating CFM by zone and MERV level by air handler type.
•Natural Ventilation: Provide a diagram showing airflows.
•Provide site plan/map showing the location of the designated outdoor smoking area(s).
•Provide evidence of signage communicating interior smoking policy; drawing(s) with signage details or photos are acceptable.
•Provide results of the blower door testing. (if applicable)
•Mechanically Ventilated Spaces: 1. Provide a narrative describing the ventilation design and airflow/CO2 monitoring system. 2. Provide the project drawings highlighting sensor locations and types. 3. The control drawings showing outdoor air flow measurement devices that serve non-densely occupied spaces.
•Naturally Ventilated Spaces: 1. Provide a narrative describing the ventilation design and CO2 monitoring system 2. Provide project drawings highlighting location and size of naturally ventilated zones and associated windows as well as sensor locations and types.
•Mechanically Ventilated Spaces (Non-residential): Provide a narrative describing the ventilation system design including air intake volume for each specific occupied zone, to demonstrate that the design exceeds the minimum rates in ASHRAE 62.1 -2007 by at least 30%.
•Naturally Ventilated Spaces: 1. Provide diagrams and calculations demonstrating that natural ventilation is an effective strategy. 2. A summary report demonstrating that the design provides the minimum ventilation rates required by ASHRAE 62.1-2007 for at least 90% of occupied spaces.
•Residential Buildings: Provide a narrative describing the ventilation system ducted directly to the suite(s), and how the air is distributed to all regularly occupied areas in the suite.
•Provide representative drawing(s) or floor plan(s) identifying lighting controls.
•Provide annotate drawing(s)/floor plan(s) identifying thermal comfort controls
•Mechanically Ventilated Spaces: 1. Provide a narrative describing the permanent monitoring system installed. Also, provide project drawings highlighting the system. 2. Provide supporting documentation with PMV/PPD calculation.
•Naturally Ventilated Spaces: 1. Provide documentation with inputs and results of calculations or simulation. Include worse case design outdoor conditions and worse case design indoor conditions.
•Simulation: Provide a summary output from the computer simulation for daylgiht.
•Prescriptive: Provide representative drawing(s) demonstrating interior elevations & window areas.
•Measurement: Provide representative drawing(s) showing the results of measurements taken on a 3 meter grid.
•Provide drawings, photographs or other documentation showing the line of sight from interior spaces through exterior windows for representative floor plans and building space types.
•Provide either an Erosion and Sedimentation Control Plan or Construction Drawing(s) describing the relevant ESC control measures.
•Throughout construction: Perform weekly inspections and provide inspection reports or date-stamped photos which show implemented measures and any corrective actions.
MRc1.1 - Building Reuse: Maintain Existing Walls, Floors, and Roof
MRc1.2 - Building Reuse: Maintain Interior Non-Structural Elements
•Provide a narrative describing the reuse strategy and detailing any materials excluded from re-use.
•Provide photographs showing pre and post-construction elevations.
•Provide a narrative describing the reuse strategy and detailing any materials excluded from re-use.
•Provide photographs showing pre and post-construction elevations.
•Provide a separate spreadsheet detailing waste tracking information for each shipment (bin).
•Provide a list of waste management firms or receivers with supporting letters on the end use of materials.
SSp1 - Construction Activity Pollution Prevention
•Throughout construction: Perform weekly inspections and provide inspection reports or date-stamped photos which show implemented measures and any corrective actions.
SSc5.1 - Site Development: Protect and Restore Habitat
•Greenfield Sites: Provide 6 photos of different disturbed areas characterizing the limitation of construction disturbance.

•Update separate spreadsheet detailing waste tracking information for each shipment (bin).
•Update list of waste management firms or receivers with supporting letters on the end use of materials.
SSp1 - Construction Activity Pollution Prevention
•Throughout construction: Perform weekly inspections and provide inspection reports or date-stamped photos which show implemented measures and any corrective actions.
SSc5.1 - Site Development: Protect and Restore Habitat
•Greenfield Sites: Provide 6 photos of different disturbed areas characterizing the limitation of construction disturbance.

MRc2 - Construction Waste Management
•Update separate spreadsheet detailing waste tracking information for each shipment (bin).
•Update list of waste management firms or receivers with supporting letters on the end use of materials.
MRc4 - Recycled Content
MRc5 - Regional Materials
MRc6 - Rapidly Renewable Materials
MRc7 - Certified Wood
•Provide manufacturer data sheets and/or letters verifying recycled content of materials used.. (only top 5 contributing items need to be submitted unless audited)

•Provide manufacturer data sheets and/or letters verifying regional content of materials within 800km. (only top 5 contributing items need to be submitted unless audited)

•Provide documentation (vendor invoices) to verify the values included in the cost calculation, and provide photographs (if applicable).

•Provide documentation (vendor invoices) for all new wood based products to verify the values included in the cost calculation. Vendor invoices must be itemized by line and include cost, vendor COC# and identify each product as FSC-Pure, FSC-Mixed Credit or FSC-Mixed [xx]%.

SSp1 - Construction Activity Pollution Prevention
•Throughout construction: Perform weekly inspections and provide inspection reports or date-stamped photos which show implemented measures and any corrective actions.
MRc2 - Construction Waste Management
•Update separate spreadsheet detailing waste tracking information for each shipment (bin).
•Update list of waste management firms or receivers with supporting letters on the end use of materials.
MRc4 - Recycled Content
MRc5 - Regional Materials
MRc6 - Rapidly Renewable Materials
MRc7 - Certified Wood
•Provide manufacturer data sheets and/or letters verifying recycled content of materials used.. (only top 5 contributing items need to be submitted unless audited)

•Provide manufacturer data sheets and/or letters verifying regional content of materials within 800km. (only top 5 contributing items need to be submitted unless audited)

•Provide documentation (vendor invoices) to verify the values included in the cost calculation, and provide photographs (if applicable).

•Provide documentation (vendor invoices) for all new wood based products to verify the values included in the cost calculation. Vendor invoices must be itemized by line and include cost, vendor COC# and identify each product as FSC-Pure, FSC-Mixed Credit or FSC-Mixed [xx]%.

•Provide IAQ Mangement Plan, highlighting management practices implemented during construction.
•Provide 18 photographs documenting IAQ performance during construction with date and time stamp. Include representative photos of all methods and at least 2 periods must be included.

MRc2 - Construction Waste Management
•Update separate spreadsheet detailing waste tracking information for each shipment (bin).
•Update list of waste management firms or receivers with supporting letters on the end use of materials.
MRc4 - Recycled Content
MRc5 - Regional Materials
MRc6 - Rapidly Renewable Materials
MRc7 - Certified Wood
•Provide manufacturer data sheets and/or letters verifying recycled content of materials used.. (only top 5 contributing items need to be submitted unless audited)

•Provide manufacturer data sheets and/or letters verifying regional content of materials within 800km. (only top 5 contributing items need to be submitted unless audited)

•Provide documentation (vendor invoices) to verify the values included in the cost calculation, and provide photographs (if applicable).

•Provide documentation (vendor invoices) for all new wood based products to verify the values included in the cost calculation. Vendor invoices must be itemized by line and include cost, vendor COC# and identify each product as FSC-Pure, FSC-Mixed Credit or FSC-Mixed [xx]%.

•Provide photos of bicycles storage/racks (one photo of each type of bicycle rack provided).

•Continue to document the 18 photographs documenting IAQ performance during construction with date and time stamp. Include representative photos of all methods and at least 2 periods must be included.
IEQc4.1 - 4.4 - Low-Emitting Materials

IEQc5 - Indoor Chemical and Pollutant Source Control
•Provide documentation (manufacturer datasheet or MSDS) to verify VOC content.
•Provide a narrative confirming the use of VOC budget compliance path is used only for products with no market alternative (if applicable).
•Provide photos of entry way systems.
•If roll outs mats are used: Provide a narrative describing the entryway systems using floor mats. List the mat type(s) and locations and describe the maintenance procedure for each roll-out mat, including frequency, responsible party(s) and contract length (if applicable).
•Provide mechanical plans showing dedicated exhaust ventilation.
•If water and chemical concentrate mixing occurs: Provide a narrative describing the disposal of hazardous liquid wastes.
•Provide mechanical schedule highlighting MERV rating of filters or provide MERV rating from product data sheet(s).

•Continue to document the 18 photographs documenting IAQ performance during construction with date and time stamp. Include representative photos of all methods and at least 2 periods must be included.
•Provide a copy of the interim or final commissioning report (this copy my exclude actual test reports normally contained within appendices).

•Provide approved show drawings of all water consuming fixtures.
•Provide confirmation of installed whole-building water meter (e.g photo or approved shop drawings) as well as proof of calibration for any meters owned by the tenant, or owner.
IEQc7.2 - Thermal Comfort: Verification
•Building Flush Out: Provide a narrative describing the building flush-out procedure.
•Air Testing: 1.Provide a narrative describing the IAQ testing procedures, test date(s) and scope, sampling locations with respect to floor area, size, and ventilation system, and any corrective measures implemented or project-specific special considerations.
2. Provide a copy of the IAQ testing results highlighting testing date(s) and concentrations of contaminants.
•Provide a narrative describing the permanent monitoring system installed, including feedback and control capacity. The narrative should also include a single-line or schematic drawing depicting sensor location.
•Provide a letter from the owner confirming that the survey will be completed and a plan for corrective action will be developed in the case that 20% or more are dissatisfied with thermal comfort in the building.
•Provide a sample of the questionnaire developed for the survey.
•Provide a narrative describing the party/parties involved responsible for administrating the survey indicating those responsible for setting up the survey, sending invitations, and collecting and analyzing survey results.
For Residential buildings: Also include a photo of instructions provided to building occupants