Loading presentation...

Present Remotely

Send the link below via email or IM

Copy

Present to your audience

Start remote presentation

  • Invited audience members will follow you as you navigate and present
  • People invited to a presentation do not need a Prezi account
  • This link expires 10 minutes after you close the presentation
  • A maximum of 30 users can follow your presentation
  • Learn more about this feature in our knowledge base article

Do you really want to delete this prezi?

Neither you, nor the coeditors you shared it with will be able to recover it again.

DeleteCancel

Renewing Critical Infrastructure - Kingsgate Pump Station

Jonathan Funk's BCWWA Presentation
by

Neal Whiteside

on 27 October 2015

Comments (0)

Please log in to add your comment.

Report abuse

Transcript of Renewing Critical Infrastructure - Kingsgate Pump Station

Kingsgate Pump Station
Renewing Critical Infrastructure
Jonathan Funk, B.A.Sc., EIT
- Aging infrastructure
- Obsolete equipment
- Critical service
Rehabilitation
- A "new pump station" inside existing structure
- Structural modifications
- New bridge crane inside existing building
- New power substation
- Expanded electrical controls / new electrical room
- Incremental transition from existing to new
- Careful construction phasing
The Process
The Choice
Replace
Infrastructure Renewal
Rehabilitate
Cost
Kingsgate Pump Station
Replace
Infrastructure Renewal
Rehabilitate
Cost
New Pump Station
Electrical Room
Bridge
Crane
Power
Supply
Constr.
Phasing
Supply
Contracts
Acknowledgements:
City of Burnaby
Empac Engineering Ltd.
Gygax Engineering Associates
Westport Construction Ltd.
Spare Photos
Kingsgate Pump Station
Renewing Critical Infrastructure
Jonathan Funk, B.A.Sc., EIT
Acknowledgements:
City of Burnaby
Empac Engineering Ltd.
Gygax Engineering Associates
Westport Cosntruction Ltd.
Rehabilitation
New Bridge Crane
Structural Modifications
Rehabilitation
2400V ~> 600V
Build new power supply
Operate simultaneously
Rehabilitation
New electrical room
Structural modifications
Civil and architectural
Rehabilitation
New pump motors
Rebuild / replace pump bowls
Carefully phased construction
2 hr max downtime
City of Burnaby
SFU Water Tower
Kingsgate Pump Station