Loading presentation...

Present Remotely

Send the link below via email or IM

Copy

Present to your audience

Start remote presentation

  • Invited audience members will follow you as you navigate and present
  • People invited to a presentation do not need a Prezi account
  • This link expires 10 minutes after you close the presentation
  • A maximum of 30 users can follow your presentation
  • Learn more about this feature in our knowledge base article

Do you really want to delete this prezi?

Neither you, nor the coeditors you shared it with will be able to recover it again.

DeleteCancel

RTS 2010

Prezi is simple: You Write, Zoom, Arrange.Using these simple means, you can express many things - with great impact.Here are some basic examples such as timelines, TOC, Zen likes.
by

Fabio Tadeu Alves

on 8 November 2011

Comments (0)

Please log in to add your comment.

Report abuse

Transcript of RTS 2010

Table of Contents? Timeline .............02.............................04...................................06.................................08.................................10..... In-house Developments
Low Cost Development
V&V, PDCA, and so on...
Implementation

Line 3 (RED) New Researches & Developments That's All! 1. Introduction
2. History
3. Signalling System
4. Life-Cycle
5. Implementation
5. Outcomes
6. Conclusion Revamping existing Signalling System
Fleets Modernization Thank you!

falves@metrosp.com.br Fully Automated Line
18 stations
22 km lenght
1/3 underground
2/3 elevated/on ground
1.3 million users/day
Headway 102 (s) peak-time
44-45 fleets (pk-time)(no-spare)
6~10 pass/sq.m Energy Saving Strategy
in
Sao Paulo Metro

Fabio Alves, SPM
Dr. Cassiano Pires, University of Sao Paulo

RTS 2010
University of Birmingham
13th - 15th April 2010 Train Traction Current Consumption ATO Settings o.55 m/s2
0.75 m/s2
1.11 m/s2 0.67 m/s2
0.75 m/s2
0.85 m/s2 What do you really know about Sao Paulo Metro? 1974 (Opened)
State Company
4 Operational Lines
62.3 km
56 stations
2.5 users (2007)
3.3 users (2009)
7.0 users (2040)? Source: Google Images Needed more Line Capacity improvements
Reduced Platform Interference
Signalling System
Reduced Headways
Energy Consumption
R&D
Vee-Cycle, System Engineering Signalling System
(ATP, ATC, ATO, ILK . . .) Energy Consumption (kWh) High Profile (RED)
Low Profile (BLUE) Source: Alves et al (2007) Source: Alves et al (2007) Source: Alves et al (2007) We want to go further!!! Conclusions 1. It really works.
2. Up and Down Hills provide further savings
3. 800 ~ 1200 m long between station
4. Average 5% Energy Traction Consumption Savings at Line 3
5. Further researches are needed.
6. We are living in an Era of Sustenability (Energy Savings are the most) 1974 (Opened)
62.3 km length (Network)
4 Lines
56 stations

2.3 million users/day (2006)
3.3 million users/day (2009)
7.0 million users/day (2040) MBA Student at Sao Paulo University
MSc in Railway System Engineering
BEng Electrical Engineering

Sao Paulo Metro since 1997
- Electrical Technician (Maintenance)
- Signalling Engineer (Project) Academic & Professional Background Agenda Signalling System
(ATP, ATC, ATO, ILK . . .)