Loading presentation...

Present Remotely

Send the link below via email or IM

Copy

Present to your audience

Start remote presentation

  • Invited audience members will follow you as you navigate and present
  • People invited to a presentation do not need a Prezi account
  • This link expires 10 minutes after you close the presentation
  • A maximum of 30 users can follow your presentation
  • Learn more about this feature in our knowledge base article

Do you really want to delete this prezi?

Neither you, nor the coeditors you shared it with will be able to recover it again.

DeleteCancel

Make your likes visible on Facebook?

Connect your Facebook account to Prezi and let your likes appear on your timeline.
You can change this under Settings & Account at any time.

No, thanks

Quality Results August 2013

No description
by

Maria Nino

on 28 August 2013

Comments (0)

Please log in to add your comment.

Report abuse

Transcript of Quality Results August 2013

August '2013
Customer Complaints
Score Card
Sort Cost
Action Plan

Customer Complaints
Scorecard
Sort Cost
\
External / Internal Formal Customer Complaints (CFC)
2013 TRN2 Plant

Increase Matting Parts
Improve:
Prevent Escape and cost reduction.
Root Cause:
Internal RPMs
Scope:
Implementation of defect recognition, all hourly personnel is participating to detect non conforming parts prior to shipped out of the customer.
Action:
A quality gift is given to hourly personnel as part of motivation
Personnel Recognition
Improve:
Internal RPMs.
Root Cause:
Functional defect escape to the customer.
Scope:
Increase matting parts for defect detection.
Action:
QE are checking matting parts status as production schedule runs.
Swing Chute Covers
IMM's skirting
Improve:
Scrap
Root Cause:
Material on production floor.
Scope:
IMM's skirting to avoid parts felt down out of the IMM
Action:
New skirting was ordered
Improve:
Scrap/RPM's
Root Cause:
Reject short shot parts due to not acceptable regrind.
Scope:
Grinder modifications, turns control, regrind acceptance criteria, Blades, etc.
Action:
Regrind team will monitor all activities related to this Master.
Regrind Turns Control
Action:
Monitor how many turns . This will prevent dust on regrind.
Audit Process
Improve:
Scrap
Root Cause:
Material on production floor.
Scope:
Swing chute covers to avoid material felt down to floor .
Action:
We have swing chute covers for the following IMM : B29, C14, B11 and A26
Target
Quality Results

#1
#2
#3
Regrind Release

Action:
Regrind board was located to help Quality Inspectors and Mold Tech to release or reject Regrind. New label with Mold Tech and Quality Inspector signatures was implemented
.
New blades

Action:
Monitor Blade usage and reposition for all grinder blades. This will reduce the excess of oversized pellets.
Juarez Only
Regrind Master
Improve:
Sort Cost
Root Cause:
Audits based only in products
Scope:
New Audit Process focus on machine variations, poka joke verification, process setting .
Action:
In process mainly found parameters variation ( fill time and cycle time). As interim action a process deviation has been approved until new process setting will be implemented.
30 min Shot Box
Improve:
Internal RPMs
Root Cause:
Reject parts not detected on time by IMM operator
.
Scope:
30 min shot box in all work stations.
Action:
Work station standardization.
Refurbish 6/14
LOW RPM 1/5
Wittmann 4
LOW RPM 1/5
Refurbish 6/14
Cavitation Plan
Improve:
Internal RPMs
Root Cause:
Prevent scape
Scope:
Microanalysis program for FORD's tools to detect cracks and prevent damage on production .
Action:
Current Microanalysis Matrix and correction plan for current months shows 100% completation
Microanalysis
Improve:
Sort Cost
Root Cause:
Damaged tooling.
Scope:
Cavitation Plan

Action:
Weekly status review based on priority list.
Fast Response Improve
Improve:

Root Cause:
Customer Satisfaction.
Scope:
Improve fast response meeting to reduce time , organize , standardize ,analyze customer 8Ds.
Action:
We have to proposal. 1) Involves standardize concepts ( defects, customer, etc), divide whiteboards according champions and a MATTEC Television to post Alerts and detail the customer Defect. 2 ) A interactive whiteboard will replace our actual boards. This will help us to register all actions implemented during the 8Ds.
&
Improve:
Scrap
Root Cause: Incorrect MATTEC scrap data
Scope:
Weekly audit to review system information (MATTEC) versus production daily reports.
Action:
Weekly Meetings to review MATTEC information has been implemented.
MATTEC review

Action:
Include pulleys change, low rpm, cleaning , painting, gear revision .
Grinder Refurbish
ACTION PLAN