Loading presentation...

Present Remotely

Send the link below via email or IM

Copy

Present to your audience

Start remote presentation

  • Invited audience members will follow you as you navigate and present
  • People invited to a presentation do not need a Prezi account
  • This link expires 10 minutes after you close the presentation
  • A maximum of 30 users can follow your presentation
  • Learn more about this feature in our knowledge base article

Do you really want to delete this prezi?

Neither you, nor the coeditors you shared it with will be able to recover it again.

DeleteCancel

PMIS Reports Training

No description
by

Justin McKinney

on 26 February 2016

Comments (0)

Please log in to add your comment.

Report abuse

Transcript of PMIS Reports Training

PMIS Reports Training
Expediting Ease, Efficiency, and Information
Reporting Groups
There are over 20 PMIS Reports that are divided into several groupings
Allows user to save specific input settings on a report so that it can be ran in the future with a single click

After running a report and making sure your inputs are correct simply click “Save Report” and name it
Reports can be saved multiple times under different names so that various input sets can be utilized
Reports can be re-run at will by clicking in the upper right hand corner of the screen under My Saved Reports
Users can edit and delete their reports as desired
My Reports
PMIS Reporting Benefits
Resource for responding to various inquiries
Data points for specific users or entire groups
Unlimited customizable reports
Instant access to data
Fiscal doc preparation
Monitor PM workload, progress, and proficiency
Allows user to save specific input settings on a report so that it can be ran in the future with a single click
My Reports
So how do I do it?
Select all of your desired inputs and then click Run Report
After running a report and making sure your inputs are correct simply click “Save Report” and name your report
Saved Reports will show up under the My Saved Reports tab and can be re-run at will by clicking the magic wand icon
The same report can be saved multiple times under different names so that various input sets can be utilized
Users can delete their reports by clicking the red X icon
Users can edit their reports by clicking the pencil icon
Upcoming construction or engineering work that falls within a user defined time frame based on a projects Advertise for Bid or RFP milestone date
Upcoming Construction Bid and Engineering RFP Reports
Planning Reports
User selects parameters as desired and then clicks "Run Report"
Benefits Include...
- Breakdown of upcoming Consultant/Contractor opportunities

- Impending workload for prepping RFP/Bid docs and legislation requests
- Preview expected funding needs in the short term
DPU Project Summary Report
Planning Reports
Basic project information such as description, schedule, budget, and period summary for DPU projects
More detailed parameters allow for greater granularity
Benefits Include...
- Gauge workload in the short or long term for an individual PM or an entire Section
- Insight on how to possibly redistribute tasks or provide assistance to those in need
Full transcript