Loading presentation...

Present Remotely

Send the link below via email or IM

Copy

Present to your audience

Start remote presentation

  • Invited audience members will follow you as you navigate and present
  • People invited to a presentation do not need a Prezi account
  • This link expires 10 minutes after you close the presentation
  • A maximum of 30 users can follow your presentation
  • Learn more about this feature in our knowledge base article

Do you really want to delete this prezi?

Neither you, nor the coeditors you shared it with will be able to recover it again.

DeleteCancel

Scenario #4

Bore-Hole Wells
by

meghan hance

on 8 March 2010

Comments (0)

Please log in to add your comment.

Report abuse

Transcript of Scenario #4

Scenario #4 Bore Hole Wells Sanitizing Pumping Systems Gravity Fed Distribution systems Storage tanks are placed at the highest point in a community Designing a water transmission line from a pump to the point of use. Estimate the peak flow according to the present population Estimate the future demand based on the area. Size the transmission line based on limiting the flow to .75 liters/second. determine the head losses from the flow in the transmission lines. Tabulate and compare head losses. First, identify a water source Designing an electric pumping system Find Quantity of water required. Find pumping head Type of power available, and voltage type. (AC or DC) Size of well, and production capability.
Full transcript