Loading presentation...

Present Remotely

Send the link below via email or IM

Copy

Present to your audience

Start remote presentation

  • Invited audience members will follow you as you navigate and present
  • People invited to a presentation do not need a Prezi account
  • This link expires 10 minutes after you close the presentation
  • A maximum of 30 users can follow your presentation
  • Learn more about this feature in our knowledge base article

Do you really want to delete this prezi?

Neither you, nor the coeditors you shared it with will be able to recover it again.

DeleteCancel

Make your likes visible on Facebook?

Connect your Facebook account to Prezi and let your likes appear on your timeline.
You can change this under Settings & Account at any time.

No, thanks

Untitled Prezi

No description
by

rafael chavez

on 23 October 2013

Comments (0)

Please log in to add your comment.

Report abuse

Transcript of Untitled Prezi

GOLDEN GATE BRIDGE
Golden Gate Bridge
Joseph Strauss
-Chief engineer of Golden Gate Bridge
-Died in Los Angeles
-Born in Cincinnati, Ohio
Irving Morrow
-Hired in 1930 by Joseph Strauss
-Was a designer.
-Picked the color orange for the bridge
-Was the designer for Burnside Bridge (1926) in Portland, Oregon & the Lewis and Clark Bridge (1930) over the Columbia River.
-Charles Alton Ellis was responsible for the structural design of the Golden Gate Bridge.
-Graduate certificate in Engineering from the University of Illinois.
-On May 10, 2007, Ellis was officially given recognition for his part in the designing process of the Golden Gate Bridge.
-The copy of the engineering drawings for the Golden Gate Bridge on file at the Library of Congress is signed by Ellis.
Charles Alton Ellis.

Construction
-Width: 90ft.
-Finished: May 27, 1937
-Started: January 5, 1933
-Length:8,980'
to...
Lewis & Clark
Burnside Bridge.
Ellis found a teaching job at Purdue University in 1934.
-Elevation:67m
-Height:227m
Full transcript