Background

Introduction

Outline

Problem Statement

  • Current Torrington WWTP will not be able to meet upcoming regulations

Torrington Wastewater

Treatment Plant

  • Introduction
  • Problem Statement & Purpose
  • Design Goals
  • Background
  • Selection of Design Goals and Criteria
  • Selection of Alternatives
  • Treatment Options
  • Five Alternatives
  • Scoring of Alternatives
  • Benefit Analysis
  • Cost Analysis
  • Cost-Benefit Analysis
  • Final Design
  • Recommendations
  • Conclusion

Project Methodology

Complete Design

Design Criteria

Selection Of Alternatives

Selection of Design Goals and Criteria

Treatment Options

Design Goals

1. Improve the water quality of the effluent discharged into the North Platte River

2. Design a highly operable WWTP

  • Preliminary Treatment
  • Primary Treatment
  • Secondary Treatment
  • Tertiary Treatment
  • Disinfection
  • Solids Treatment

3. Reach stakeholder consensus by meeting all client and public requirements

4. Decrease the quantity of residual solids within treatment processes, and sufficiently treat the remaining solids to be recycled or safety disposed

5. Design a low-cost and high-benefit solution that achieves all other goals

Ben Collamer, HCH Engineering Owner & Design Engineer

Britton Hammit, Project Manager

Josh Harkins, Lead Engineer

Recommendations & Pretreatment

Recommendations:

  • Industrial Pretreatment
  • Heavy Metal Removal at Water Treatment Plant

Alternative 2

Benefit Scoring

Alternative 1

Alternative 3

Oxidation Ditch with Membrane Filtration

  • Criteria
  • Removal Efficiencies
  • Scoring Example
  • Benefit Scoring Summary

Oxidation Ditch with Gravity Sand Filter

5 Stage Bardenpho

Criteria

Removal Efficiencies

Alternative 1 Scoring

Complete Alternatives

Alternative 4

Alternative 5

Benefit Score Summary

A20

Aerated Lagoons with Gravity Sand Filter

Conclusions

Recommendations

  • Implement Grit Chamber in Short Term
  • Consider Upgrading Lagoon System
  • DO Monitors
  • Variable Blower System
  • Introduction
  • Problem Statement & Purpose
  • Design Goals
  • Background
  • Selection of Design Goals and Criteria
  • Selection of Alternatives
  • Treatment Options
  • Five Alternatives
  • Scoring of Alternatives
  • Benefit Analysis
  • Cost Analysis
  • Cost-Benefit Analysis
  • Final Design
  • Recommendations
  • Conclusion
  • Require Heavy Metal Treatment at Water Treatment Facility
  • Require Industrial Pre-Treatment

Lift Station and Pump

Cost Benefit Analysis

Final Design

Cost Summary

Cost & Benefit Summary

Questions?

Contact Information:

Cost & Benefit Summary

HCH Engineering: hcheng@hch.com

307-710-8668

Ben Collamer: bcollame@uwyo.edu

Britton Hammit: bhammit1@uwyo.edu

Josh Harkins: jharkin2@uwyo.edu

References

Photo From Google Maps

http://cnbsa.org/?page_id=344

Vortex Grit Chamber

1. Evaluate current operations at Torrington WWTP

2. Identify alternatives to meet future regulations

3. Compare alternatives

4. Provide a final recommendation with design details

  • Outdated treatment system
  • Preliminary Treatment
  • Continuous Blower System
  • Finishing Pond

Lagoon System

SAGR

Sum(Scores) = Overall Score

Backwash Gravity Sand Filter (1)

Backwash Gravity Sand Filter (2)

UV Disinfection

http://www.dewatering-press.com/sale-1869203-gravity-belt-thickener-liquid-filter-press-for-mining-industry.html

Finishing Pond for Flow Regulation

Cascade Aeration and Discharge to North Platte River

BOD Score Calculation

(100%-98.5%)

__________

= 0.14

*(0.15)

(100%-85%)