What Problem/ Why is it a problem?
Huge impact (new risks) for the mixer 2:
Reducing the risks with 30 % for the mixer 2 staff, who have to work alone in the evening
Collect data, document, interview and analyze risky situations to the operation, Risk Assessment, MOC
Restore the machine and the factory standard
Implementation is the process of executing a procedure so that a concept becomes a reality
Several sessions of evaluations with the team of the mixer
Restore behavioral standard and Training
The whole Mixer team had two days First Aid training.
Two members of the mixing team are also in the emergency responds team (ERT)
At least 3 employee in the evening
Because of the Mobile phone policy, no phone where allowed
Examen the residual risk and reduce them when required
Goal Achieved?
Planning closed
Continuous Improvement
Observation the mixer team in the evening
Workplace inspection
Interviewing the team
Checking the BSD's and safety reports
Target: Reducing the risks with 30%
Total risk rating -> 34
Total residual risk rating -> 18
Risk reducing 52 %
Goals is achieved!
The result are shared with work-council, unions and shop floor
Also feedback to employees
Continues improvement by: