Turlough Hill

HISTORY

- ESB central

- Cost 2.1M pounds

- 1968 -> 1974

- 1000 feets under the floor

- 350 Mans

WORKING

How the Turlough Hill's electrcity central works ?

DIAGRAM

Reservoir 1

Huge pipe

Pump turbine

Electric cable

Reservoir 2

DIAGRAM

Diagram Legend :

1. Pump Turbine

2. Motor/Generator

3. Main Unit Tranformer

4. Flap Gate

5. Turbine Inlet Valve

6. Pony Motor/Generator

7. 10 kV Switchgear, Control

Panels and Relays.

8. 2 x 70 ton Bridge Cranes

9. False Roof with

Soundproofing

10. Haunch Beams

11. 50 ton Bridge Crane

12. Cable Gallery for

220 kV Cables

5 000 tones water/min

PERFORMANCE

Generator :

4 * 75 MW

10 kV

PERFORMANCE

Electrical cable :

220 kV

3000 to 4300 MW

Lag time :

Some minute

(nuclear power station needs 6 hours)