MEASURES TO OPTIMIZE MANPOWER IN ASSY LINE USING PROCESS BAL TECHS/ REPLACING MEN WITH MACHINES
CAPT AYESHA
Reasons for optimization
Shortage
Optimization
To brief about the measures taken to optimize manpower in an assy line
- Analysis
- Measures
- Dev of Trg Aids
- Case Study
- Concl
Part 1
ANALYSIS
Part 2
ANALYSIS
Part 3
Part 4
Storage
Improper material storage
Handling
Poor material handling
Time spent in sorting
Sorting
Part 1
MEASURES
Part 2
MEASURES
Part 3
Part 4
Calc of line efficiency
Line Efficiency
Std min value
Takt time
Tgt
Manpower
Productivity
Line efficiency
Measures to inc line efficiency
Ident of bottlenecks
Measures
Distr of work ld
Rt man for the job
Cross trg of employees
Cleaner work area
Org workplace
Automated assy lines
Auto Assy Line
Automated guided vehs
AGVs
Automated storage and retrieval sys
AS/ RS
Use of conveyer belts
Conveyers
Robots on workstation
Robots
Dev of Trg Aids
Significance of proper material storage
Trg Aids
Dev of Software
Demo
Case study
Part 1
CASE STUDY
Part 2
Part 3
Part 4
Stitching sec
Time Study
Layout
Stitching sec
Inc in efficiency
Up-gradation of 607 regional wksp assy line
Reduction in man hrs
Inc Efficiency
Mil Appls
Cleaner and safer work areas
Best use of aval resources
Faster repair activities
Concl
Part 1
Part 2
Part 3
CONCL
Part 4