About CGHT Unit

Economic Assumptions

Introduction

Calculation Samples For Fixed Capital

Design & Economic Considerations of CGHT Unit

Comfar Results

Total Production Cost , Tax, ...

Members:

Suzan Abrishami

Noorie Seyedi

Zeinab Razavi

Introduction

Where our unit exists in a refinery!

1

Process Flow Diagram

FCC

Stripper

Regenerator

35730 barrel/ Day

Riser

First Hydrotreater

Second Hydrotreater

2

Economic assumptions

3

Removals

Some equipments were omitted from calculations

4

Replacements

Temp < 375 C

Some equipments were substituted

Temp < 375 C

5

Temp < 375 C

using other resources

FCC Reactor's cost was found from websites

6

Fixed Capital Investment

First step

CTCI =1.18 ( CTBM + CSite + C building + C offsite facilities ) + cwc

7

Heat Exchangers

Heat Exchangers

fOR Heat Exchangers

CTCI = CTPI + CWC = 1.18 ( CTBM + CSite + C building + C offsite facilities ) + cwc

CI in 2019=647.22

Reference: www.chemengonline.com

CBM = CPb ( I/Ib) [ FBM + (Fd Fp Fm - 1)]

8

Vessels

for Vessels

Vessels

CTCI = CTPI + CWC = 1.18 ( CTBM + CSite + C building + C offsite facilities ) + cwc

CBM = CPb ( I/Ib) [ FBM + (Fd Fp Fm - 1)]

9

Fixed Capital Investment

Fixed Capital Investment

for equipments

CTCI = CTPI + CWC = 1.18 ( CTBM + CSite + C building + C offsite facilities ) + cwc

C site = ?

C building = ?

C offsite facilities =?

C TCI = ?

C TPI = ?

C WC = ?

10

Total Production cost

Abadan Region

  • Tax
  • Depreciation
  • Income

www.opec.org

11

COMFAR Results

12

Summary Sheet

13

Summary Sheet

14

IRR Sensitivity

15

NPV

16

Thank you for your attention

17