14TH JULY 1992
GEOHAN SDN BHD WAS FORMED IN YEAR 2002 FROM GEOHAN HOLDING SDN BHD
it first ventured into property development
GROUND WORK AND BUIDLING FOUNDATION
Cadangan Pembangunan 3 Blok Pangsapuri Yang Mengandungi 318 Unit Kediaman 40 Tingkat Untuk Pangsapuri Kos Tinggi (Blok A), 534 Unit Kediaman 42 Tingkat Untuk Pangsapuri Kos Tinggi (Blok B), 398 Unit Kediaman 33 Tingkat Untuk Pangsapuri Mampu Milik (Blok C), 8 Tingkat Podium Tempat Letak Kereta 2 Unit Pondok Pengawal dan Kemudahan Di Atas P.T. 8758 dan P.T. 8759, Jalan Langkawi, Mukim Setapak, Wilayah Persekutuan Kuala Lumpur.
CADANGAN PEMBANGUNAN ( KEDIAMAN ) 1 BLOK PANGSAPURI ( 35 TINGKAT ) YANG MENGANDUNGI PANGSAPURI MAMPU MILIK 27 TINGKAT (515 UNIT) BESERTA 1 TINGKAT KEMUDAHAN PENDUDUK PENGAWAL 2 PENCAWANG ELEKTRIK DI ATAS LOT 1003, JALAN PERSIARAN PERTAHANAN KAMPUNG WIRAJAYA, MUKIM SETAPAK, WILAYAH PERSEKUTUAN KUALA LUMPUR
GEOHAN TEAM
PROJECT MANAGER
SHENG WEI CHYI
OPERATION MANAGER
WONG KING SENG
SHO
KHAIRULIZHAM
ENGINEER
JANNAH
SUPERVISOR
HELMY
SUPERVISOR
ZAINUREE
G472 AND G488 STAFF
ESHT
ELYZIUS
SUPERVISOR
MUIZ
ESHT
LUISSON LIM
G472 AND G488 STAFF
METHODOLOGY
Review of documentation and any related documentation
Gain more information of the hazard. Example: Review the past accident and near
miss report/records, method statement, Job safety analysis(JSA).
Questionnaire :
By questioning the workers, supervisor, person in charge and any one who involves, it is to know the next process of works, so that can identify the hazards and possible accident might happen.
Observation at workplaces :
Supervising the workers through their working manners and the surrounding area to identify hazard of unsafe condition of working places and preventing unsafe act of workers.
Interview and review of the past accident document :
Interview the Project manager, operation manager, supervisor, and workers about the past accident and near miss and review all related document of past accident, near miss, method statement, job safety analysis.
Inspection at workplaces :
Inspection before work with checklist form. ( inspection on machinery to identify the unsafe condition/hazards) and inspection after work done to eliminate and minimize hazards.
BORE PILE WORK PROCESS
STEP 2
BORING WORK
( HOLE OPENING )
STEP 3
INSTALLING TEMPORARY CASING
STEP 5
INSTALLING STEEL BAR TO THE BORING HOLE
STEP 6
CHECKING HOLE DEPTH
STEP 7 CONCRETING
STEP 8
EXTRACTING TEMPORARY CASING
HIRARC
RECOMMENDATION
CONCLUSION
QUESTION ?
THANK YOU