Commissioning of Automatic
Signalling with slip-siding in
BNC-WFD sections.
Introduction
- Automatic signalling proposed between Bengaluru Cant-Whitefield stations under Traffic Facility PB item No.55 of 2016-17 in Bengaluru-Jolarpettai section of B’ route.
- Total length 18.955 Kms on Double Line with RE.
- 07 Nos of stations with STD-II(R) interlocking.
- The scheme finalized as Signal control through Quad cable and track detection with HASSDAC.
- Tender invited in April 2016.
- Section commissioned on Feb-2019.
Introduction
Section Details
SECTION SYSTEM MAP :