Introducing 

Prezi AI.

Your new presentation assistant.

Refine, enhance, and tailor your content, source relevant images, and edit visuals quicker than ever before.

Loading…
Transcript

Roller Coaster Polynomial Project

By: Kayla Knight

Equation

Standard Form:

Equation

Factored Form:

Work

Zeros

X=2

X=4

X=6 M: 2

X=+/- i

Work

Work

Characteristics

Practical Domain:[0,6.71]

Practical Range:[-37.535,120]

Relative Maximum:(4.91,32.915)

Relative Minimum:(2,971,-37.535), (6,0)

Intervals of Increase:(2.972,4,91), (6,6.71)

Intervals of decrease:(0,2.972), (4.91,6)

Characteristics

The Wonky Coaster

Roller Coaster

Reason Behind Name

I decided to name the roller coaster "The Wonky Coaster" because of the odd hump that appears at the beginning of the coaster.

Rough Draft

Learn more about creating dynamic, engaging presentations with Prezi