Why zoning?
SMDB
LDB
PDB
EDB
B-Type
C-Type
D-Type
1.
Overall method
2.
Load breakdown
Exact method
3.
Total connected load (overall) = Power density * Build up area
Total demand load (Electrical) = TCL * Demand Factor
Total require load (overall)
=
[Total demand load(Electrical)+mechanical+elevator+ light current]
*
Diversity factor
Demand load (light) = TCL(Light) *D.F
Demand load (lsocket) = TCL(socket) *D.F
Demand load (each floor) = D.L (Light) + D.L (Socket)
Demand load (Electrical) = D.L (G.F + F.F + S.F)
D.L (Total) =[D.L (Electrical) + HVAC + Mech + LC]
*
DF
1.
Transformer
2.
RMU
3.
Generator
4.
UPS
Dry type
Oil Type
90%
80%
Utilization
factor
Transformer room
RMU room
1- Prime Generator
2- Standby Generator
3- Continuous Generator
Offline
Online
Hybrid
Isolating transformer
1- Types of lighting
2- Types of lamps
3- Types of ceiling
4- Control lighting
5- Calculating methods
Tiles
Gypsum board
Metal strips
(10A,13A,16A)
Single
Duplex
(16A,25A,32A)
10 * 100W = 10000W
CB = 16 A ,Cable = 3 mm^2
Wiring of sockets
6* 200W = 12000W
CB = 20 A ,Cable = 4 mm^2
Calculation
( Load Current, C.B Current, Cable Current)
Calculating Method
1- ETAP
2- ABB e-Design
Types of CB
ACB Emax 2
1- TT
2- TN (TN-S, TN-C,TN-C-S)
3- IT
Earthing System
by
Excel Sheet