Design team proposals to avoid wood preserver except beech distillates or CKB-salts (chromate/ potassium/ boric acid) outside the building or use of acetylated timber.
Design team to demonstrate how they have considered embodied energy in their design development.
No wood preserver throughout
Design team proposals to incorporate 30% reduction on building regs CO2 targets - at time of planning application- for new build. Design team proposals to incorporate 30% reduction on energy use in existing buildings. Energy data to be presented as both CO2 impact and energy use of major components.
Design team proposals to incorporate a maximum of 5 m3/m2/hr @ 50 Pa for new build. Begin testing and upgrade on existing properties to achieve a maximum of 5 m3/m2/hr.
Design team proposals to incorporate a maximum of 3 m3/m2/hr @ 50 Pa for new build. Target upgrade of existing properties to achieve maximum of 5 m3/m2/hr in all.
Design team proposals to incorporate 60% reduction - at time of planning application- on building regs CO2 targets for new build. Design team proposals to incorporate 50% reduction on energy use in existing buildings. Energy data to be presented as both CO2 impact and energy use of major components.
How could the university of Strathclyde better encourage the surpassing of building standards when it comes to primary energy consumption?
Contractor and design consultants to provide comprehensive policy, overview of practices, procedures and approach. Contractor to include project targets, key performance indicators and detail site environmental management tools.
What KPIs are your organisation in need of/able to provide?
Contractor to provide a SWMP on all projects costing greater than £300,000 in line with the (English) SWMP Regulations 2008 SI 314. Data sheets to be made available to client on request. Target of 70% waste diverted from landfill.
Contractor to provide a SWMP on all projects costing greater than £300,000 in line with the (English) SWMP Regulations 2008 SI 314. Data sheets to be made available to client on request. Target of 90% waste diverted from landfill.
100% FSC or equivalent 3rd party label
Contractor and design team to demonstrate how they will ensure protection of existing ecological features on the site, and provide evidence of adherence to local biodiversity plan and University Bio-diversity Policy.
Design team to provide a policy statement on careful selection of healthy materials.
Contractor to introduce a building inventory that catalogues all the materials that have been used in the construction.
No tropical timber
Design team to comply with ES policy and include biodiverse rich areas with provision of site-wide wildlife corridor.
Design team to comply with ES exclusion list based on health risks and long term disposal concerns.
Design team to develop exclusion list to reduce future burdens. Design team to give consideration to future proofing.
How could contractors and clients best work together to develop a materials exclusion list?
How could Scottish contractors and clients better work together to create more biodiverse construction projects in urban environments?
Design team proposals to include option appraisal of opportunities from non toxic sources.
Design team proposals to avoid PVC and halogenated plastics with exceptions in electric cables and the sewage system.
Design team proposals to incorporate 30% increase over Regulations in new build and option appraisal on upgrade in existing properties.
Design team proposals to improve on datum year by year.
Total avoidance of PVC and halogenated plastics.
Design team proposals to incorporate Passive Standard in new build and option appraisal on upgrade in existing properties.
How could contractors and clients work better together to ensure that non-toxic, low carbon materials are used in the construction process?
The contractor should demonstrate how they will seek to minimise travel by site staff and visitors and integrate with public transport.
The contractor should have a plan in place to encourage low impact travel by site staff and visitors integrated with public transport.