Max profit per machine would be 1200 with 0 as x and 4 as y, however in order to produce some of both types, this would need to be changed to 1 as x, and 3 as y, so the maximum profit per machine would be 975

Constrains

x = boot cleats

y = regular cleats

y>0 // Minimum must be more than 0

x>0 // Minimum must be more than 0

1x+1.5y<6 // Total painting time must be less than 6 hours

6x+4y<18 // Total production time must be less than 18 hours

x+y<6 // Total of cleats must be less than 6

Production

One production machine can work for a maximum of 18 hours per day. It takes 6 hours to produce one pair of boot cleats, and 4 for one pair of the regular.

One coloring machine can work for a maximum of 6 hours per day. It takes 1 hour to color the boot cleats, and 1.5 hours to color the regulars.

In one day, one machine is capable of producing a maximum of 6 cleats in total.

Note: there are 600 machines of each

Our

Products

Boot Cleats

Boot Cleats: $300

Regular Cleats: $75

Regular Cleats

A revolutionary company, created to help you win every soccer match

Who are we?

Results

P=75x+300y

(0,0) = 0

(.6,3.6) = 1125

(0,4) = 1200

(3,0) = 225

(1,3) = 975