Introducing 

Prezi AI.

Your new presentation assistant.

Refine, enhance, and tailor your content, source relevant images, and edit visuals quicker than ever before.

Loading…
Transcript

Production from the Kebabangan Gas Development

Sammy

Cindy Z

$1.25

Monday, February 17, 2014

Vol XCIII, No. 311

Types of Asset and what phases of EAM cycle it represents

Activity : Gas production

The assets in the project are developed

natural gas.

The project represents the following phases:

  • drilling,
  • completion,
  • equipping and facilities,
  • maintenance and production operations.

Kebabangan (KBB) Gas Field

EAM disciplines required and roles

Completion

Drilling

-ConocoPhillips announced gas production from Kebabangan (KBB) gas field

-Exported to Sabah Oil and Gas Terminal in Kimanis.

-The gas production is anticipated to increase 60,000 BOED (barrel of oil equivalent per day) by 2017

The required EAM disciplines in completions include

  • mineral land
  • surface land
  • joint venture
  • well asset management
  • operation accounting

The EAM disciplines required to participate in drilling are

  • mineral land
  • surface land
  • joint venture
  • well asset management
  • operation accounting

Matt Fox, executive vice president, Exploration and Production states "These projects will contribute to the company's organic growth over the coming years."

Key Performance Indicator

Equipping and facilities

stakeholders

SIGNIFICANCE OF THE PLAY

References

The disciplines required in equipping and facilities

  • mineral land
  • surface land
  • joint venture
  • well asset management
  • operation accounting
  • News Releases. (n.d.). Retrieved November 17, 2014, from http://www.conocophillips.com/newsroom/Pages/2014/Production-Begins-from-the-Kebabangan-Gas-Development-in-Malaysia.aspx

  • KPOC hits first gas at Kebabangan. (n.d.). Retrieved November 17, 2014, from http://www.oilonline.com/news/upstream/kpoc-hits-first-gas-kebabangan

  • First Gas Flows from Kebabangan Field Offshore Sabah, Malaysia. (n.d.). Retrieved November 17, 2014, from https://www.rigzone.com/news/oil_gas/a/135887/First_Gas_Flows_from_Kebabangan_Field_Offshore_Sabah_Malaysia

  • Production begins from the Kebabangan gas development in Malaysia (Scandinavian Oil-Gas Magazine). (n.d.). Retrieved November 17, 2014, from http://www.scandoil.com/moxie-bm2/news/production-begins-from-the-kebabangan-gas-developm.shtml

Maintenance and production operation

Stakeholders in this play are Petrons, ConocoPhillips Sabah Ltd and Shell Energy Asian Ltd.

  • Petron hold 40% working interest
  • ConocoPhillips Sabah Ltd hold 30%
  • Shell Energy Asian Ltd hold 30%

Key indicators that effects ConocoPhillips’ assets are cash flow and production volume (BOED).

The significance of the project producing from over seas targets the Asia market.

The project signifies a beginning of multiple directions investment around the world.

The disciplines required in Maintenance and production operation are

  • mineral land
  • surface land
  • joint venture
  • well asset management
  • operation accounting
Learn more about creating dynamic, engaging presentations with Prezi