Loading presentation...
Prezi is an interactive zooming presentation

Present Remotely

Send the link below via email or IM

Copy

Present to your audience

Start remote presentation

  • Invited audience members will follow you as you navigate and present
  • People invited to a presentation do not need a Prezi account
  • This link expires 10 minutes after you close the presentation
  • A maximum of 30 users can follow your presentation
  • Learn more about this feature in our knowledge base article

Do you really want to delete this prezi?

Neither you, nor the coeditors you shared it with will be able to recover it again.

DeleteCancel

Make your likes visible on Facebook?

Connect your Facebook account to Prezi and let your likes appear on your timeline.
You can change this under Settings & Account at any time.

No, thanks

Creative Cube - Portfolio

Get this FREE Prezi template from Prezibase.com
by

Zlatko Simonovski

on 9 February 2016

Comments (0)

Please log in to add your comment.

Report abuse

Transcript of Creative Cube - Portfolio

Description of the project task

Erection of hydro-mechanical equipment in tunnel foundation discharge of a cover.
Manufacture and erection of a pipeline:
Nominal diameter DN 1220,
Working pressure Pmax= 6 bar
Length 150 m
Weight 60t.
Built-in valves, compensators, expansion couplings and other connection equipment weighing a total of 35 t.
The following was made:
Technological method of welding
Technological method of erection
Design for hydro test of the pipeline

For the internal horizontal transport in the tunnel during the erection Terex AC 45 – city mobile crane was used.
The pipeline was put into trial use in December 2010
SHIPYARD
EQUIPMENT

PRODUCT
PORTFOLIO

Sports and Public facilities
Production halls
Tanks/Silos
Bridges
Industrial facilities and machinery
Shipyard equipment
Pipelines & Hydro Systems
Special structures

NATIONAL ARENA
PHILIP II

BASIC INFORMATION ABOUT
THE PROJECT
Project task: SPORTS ARENA FOR ABOUT 36.000 SPECTATORS
The project includes :
aа) reconstruction of the south stand
b) building a new north, east and west stand
c) building a complete renovation of the sports fighting arenas
 FAKOM, AD designed, manufactured and erected the complete steel roof structure
VEKOMA
ROLER COASTER

400 ton steel structure for suspended looping coaster for Iraq.  Vekoma rides have recently designed new trains with new modular design of seats with special integrated vests. FAKOM took part in manufacturing of this steel structure.
OTHER
PUBLIC FACILITIES

PRODUCTION
HALLS

Tanks /
Silos

INDUSTRIAL FACILITIES
& MACHINERY

FINAL STRUCTURE
EAST STAND FACADE
EAST AND WEST STAND
EAST AND WEST STAND
RECONSTRUCTION OF THE SOUTH STAND
NORTH STAND
NORTH STAND
NORTH STAND
NORTH STAND
“VODENICA” SHIP-RESTAURANT
“VODENICA” SHIP-RESTAURANT
Red Star Stadium Belgrade
Swimming pool Mladost
City Shopping Center Skopje 60000 sqm, 5000 tons
City Shopping Center Skopje 60000 sqm, 5000 tons
Pekabesko - Skopje
Storage HENKEL - Bileci
MONTMONTAZA GROUP
Project: Tank Farm, 3 x 80.000 m3
Client: JANAF
Main Contractor: Montmontaza
PLC Location: Sisak Terminal, Croatia
Works: Construction/erection of oil tanks and interconnection piping
Works (FAKOM) : Production
Year of completion: end of 2011
BRIDGES
The bridge of Art - Skopje
Erection of the third arch
Trial assembly in the production plant combined with virtual assembly using modern laser metrology
Trial assembly in the production plant combined with virtual assembly using modern laser metrology
Trial assembly in the production plant combined with virtual assembly using modern laser metrology
Bridge at Sremska Racha
The bridge is a continuous beam over three fields, orthotropic plate with spans of 125,0 + 150,0 + 125,0 , i.e. a total length of L=400 m`. The transverse cross section is a closed unsymmetrical box with two consoles of 2.05 m` and 3,05 m` and a total width of 10,90m` . The bridge has two traffic lanes, one foot path and one inspection path.
The total weight of the manufactured and erected steel structure of the bridge is about 2.040 tons.
For the execution of the welding works a special Welding technological method at erection was made, which included EPP welding procedures, REL and CO2. The erection of the steel structure was completed in September 2008.

Adabtable steel bridges
PIPELINES &
HYDRO SYSTEMS

De-dusting system MakStil
Combustion chamber 70 t
Water cooling pipeline 90 t
Primary Duct 110 t
Secondary Duct 301 t
Centrifugal separator 30 t
Filter 346 t
Elephant house (Main Hall) 450 t
Dump yard Disassembly 356 t
Assembly 432 t
Support wall 385 t
Total structure weight 2.385 t
GAMA - ТеТо
USJE Rotating kiln
Technip
Prefabrication of 165 tons shell nozzles with and without PWHT (post-welding heat treatment) for Algiers Refinery Plant at Sadi-Arcine, East of Algiers.
Cooperation with the reowned German company TAKRAF

Refurbishment of the bucket wheel excavator, SRs -2000 with excavation capacity of 2000 m3/hour for residue in the Suvodol mine of REK BITOLA – Bitola.
Complex steel structure with a total weight of about 1700 tons.
The refurbishment foresees
complete dismantling,
checking of all the connections and assemblies,
replacement of the worn parts,
reassembly and trial work.
Within the refurbishment, in FAKOM Production unit, about 150 tons of new structural elements are being manufactured, according to drawings.
BUCKET WHEEL EXCAVATOR
SRs -2000 in REK Bitola
Before renewal
A picture from the production plant
After renewal
Compact Bucket Wheel Excavator
SRs(H) 1050.23/2.0
Customer - A.D. Elektrani na Makedonija (ELEM)
Plant Location - Open Cast Mine Brod Gneotino(Macedonia)
Scope of work - Turn-key project
Specific digging force: 100 kN/m
Theoretical Capacity: 4,800 lm³/h
Cutting height: 23 m
Cutting depth: 2.0 m
Max. outreach of bucket wheel : 27 m
Distance centre of excavator –
Centre of discharge pulley: 32.5 m
Bucket wheel diameter: 10.5 m
Bucket wheel drive power: 900 kW
Number of buckets: 17
Nominal bucket volume: 1,005 l
Discharge rate: 77.0 1/min
Belt width: 1.8 m
Service weight: 1,200 t
Bucket Wheel Excavator
2000.28/3.0+VR
Customer - MIBRAG, Theißen
Plant Location - Open Cast Mine Schwerzau (Germany)
Scope of work - Transfer / refurbishment of a SRs 2000 + VR (~2900t)
from Czech Republic to Germany (built by TAKRAF)
(Turn key – project)
Specific digging force: 100 kN/m
Theoretical Capacity: 4,900 bm³/h
Cutting height: 28 m
Cutting depth: 3 m
Max. outreach of bucket wheel : 44 m
Distance centre of excavator –
Centre of discharge pulley: 107.6 m
Bucket wheel diameter: 11.2 m
Bucket wheel drive power: 1 x 800 kW
Number of buckets: 14
Nominal bucket volume: 1,700 l
Discharge rate: 46 1/min
Belt width: 2.0 m
Service weight: 2,850 t
REK Bitola
erection of conveyor belt
Holland Shipyard IHC - equipment
ITALIAN SHIPYARD
FINCANTIERI
Steel beams for ships
2010 - 98 t
2011 - 655 t
2012 - 925 t
2013 - 1786 t
2014 - 4302 t
2015 - 4500 t
CROATIAN SHIPYARDS
Steel beams for ships
10.000 t – 15.000 t
per year
HPP – Sveta Petka
Installation of a cover of a by-pass tunnel, inspection tube to overflow manhole Φ 2500 with depth of 30m into the ground, aeration tube and a crane of 5 t.
Erection, centering, welding of items for supply pipelines 1 and 2 = Ф 3280mm
Erection of supporting parts for compensators with walkways, platforms, railings and stairs
The installation of the following dam items is underway:
Erection, centering with a total station of cover guides, aeration pipes for the two compensators on the front side of the dam
Erection of inspection equipment on the dam (boxes, stairs, monorail track, platforms, frames etc.)
Erected equipment that weighs over 200 tons
SPECIAL
STRUCTURES

HS-Zletovica
MACEDONIAN PHILHARMONIC
Two connected Domes
Total weight of structure 220t
Total number of assemblies 1220
Welded connection between assemblies
3D Model Design using Tekla Structures
DESIGN, MANUFACTURE AND
ERECTION OF GEODESIC DOME
Within the scope of the reconstruction and extension of the building of the Parliament of the Republic of Macedonia , construction of a Parliament hall for representational purposes is foreseen. The Parliament hall is a complex steel structure composed of V16 3/8 geodesic dome with diameter of 32.0m and height 10.0m.
Full transcript