PEKERJAAN PEMBESIAN

Instalasi pada pelat dan balok

CONSTRUCT SLAB AND BEAM FORMWORK

PERALATAN KERJA

Bucket cor

Compresor Concreat Vibrator

Concreat Mixer

Stamper

Scaffolding

Bekisting

HOTEL SANTIKA PEKALONGAN

Pemotong baja tulangan

PERALATAN KERJA

Pemotong baja tulangan

Penyulut api tenaga gas

Pembengkok baja tulangan

Waterpass

Backhoe

Compresor

DENAH LOKASI PROYEK

Proyek Hotel Santika Pekalongan mempunyai batas-batas sebagai berikut:

Sebelah Utara : perkampungan

Sebelah Timur : hotel

Sebelah Barat : perkantoran

Sebelah Selatan: Jl. Gajah Mada,Pekalongan

METODE PEKERJAAN PERSIAPAN

PERENCANAAN SITE PLAN

PERHITUNGAN KEBUTUHAN SUMBER DAYA

PEMBUATAN GAMBAR KERJA

PENGADAAN MATERIAL UNTUK PEKERJAAN

PERSIAPAN

MOBILISASI PERALATAN

PELAKSANAAN DI LAPANGAN

KANTOR PROYEK / DIREKSI KEET

GUDANG MATERIAL DAN PERALATAN

FASILITAS & TEMPAT TINGGAL PEKERJA

AREA KERJA FABRIKASI

POS JAGA DAN PAGAR KERJA

PENEMPATAN ALAT BERAT, ALAT BANTU PEKERJAAN ( TOWER CRANE & PASSENGER HOIST)

DENAH LOKASI PROYEK

Proyek Hotel Santika Pekalongan mempunyai batas-batas sebagai berikut:

Sebelah Utara : perkampungan

Sebelah Timur : hotel

Sebelah Barat : perkantoran

Sebelah Selatan: Jl. Gajah Mada,Pekalongan

PERALATAN KERJA

Theodolite

Concrete Pump Truck

Mesin Bor

Trame

Tower Crane

Organisasi Proyek

DATA UMUM PROYEK

Nama Proyek : Hotel Santika Pekalongan

Lokasi Proyek : Jl. Gajah Mada

Jenis Bangunan : Gedung Bertingkat

Lingkup Kerja : Struktur, Arsitektur, Plumbing

Waktu Pelaksanaan : 12 Bulan

Pemilik Proyek : PT. SIMA GRAHA UTAMA

Konsultan Arsitektur : PT. ARKITEKTON LIMATAMA

Konsultan Struktur : PT. TOYO Cahya Konstruksi

Konsultan M & E : PT. BEIMA TECHNO

Quantity Surveyor : PT. ESTIMATIKA KONSTRUKSI INDOTEK

Kontraktor Utama : PT. DJASA UBERSAKTI

Nilai Kontrak : ± 44 M

Jenis Kontrak : Lumsump price fixed

CO

بِسْمِ اللَّهِ الرَّحْمَٰنِ الرَّحِيم

PEMBANGUAN HOTEL SANTIKA

PEKALONGAN – JAWA TENGAH

PIHAK-PIHAK YANG TERLIBAT

CASHIER & COST CONTROL

SITE MANAGER STRUCTURE

PROJECT MANAGER

STRUCTURE ENGINEER

MECHANICAL MANAGER

VICE MARKETING DIRECTOR

STRUCTURE ENGINEER

VICE ENGINEERING DIRECTOR

SRTUCTURE SUPERVISOR

MEP SUPERVISOR

GENERAL AFFAIR

GENERAL / QC / HSE

MANAGER

SITE MANAGER ARCHITECT

WAREHOUSE

SRTUCTURE SUPERVISOR

ARCHITECH SUPERVISOR

ME ENGINEER

GENERAL AFFAIR

WAREHOUSE

PROCUREMENT

GENERAL / QC / HSE

MANAGER

PRESIDENT

DIRECTOR

MEP SUPERVISOR

ME ENGINEER

CONSTRUCTION MANAGER STRUCTURE

VICE ENGINEERING DIRECTOR

ARCHITECH SUPERVISOR

MECHANICAL MANAGER

CONSTRUCTION MANAGER ARCHITECT

CASHIER & COST CONTROL

Created By :

Ayu Radita Tifani_(02.211.3103)

Lianita Armiyanti_(02.211.3139)

GENERAL AFFAIR

MECHANICAL MANAGER

SITE MANAGER ARCHITECT

PROJECT MANAGER

GENERAL / QC / HSE

MANAGER

VICE ENGINEERING DIRECTOR

ARCHITECH SUPERVISOR

PROCUREMENT

PROJECT MANAGER

SRTUCTURE SUPERVISOR

ARCHITECH SUPERVISOR

GENERAL / QC / HSE

MANAGER

STRUCTURE ENGINEER

ME ENGINEER

WAREHOUSE

CASHIER & COST CONTROL

PRESIDENT

DIRECTOR

STRUCTURE ENGINEER

SITE MANAGER STRUCTURE

MEP SUPERVISOR

PROCUREMENT

VICE MARKETING DIRECTOR

ME ENGINEER

MEP SUPERVISOR

CONSTRUCTION MANAGER ARCHITECT

MECHANICAL MANAGER

SRTUCTURE SUPERVISOR

CASHIER & COST CONTROL

WAREHOUSE

VICE ENGINEERING DIRECTOR

GENERAL AFFAIR

FAKULTAS TEKNIK SIPIL

UNIVERSITAS SULTAN AGUNG SEMARANG

SUB CONTRACTOR & FOREMAN

design by Dóri Sirály for Prezi

DATA BANGUNAN

Type Bangunan : Bangunan Beton Bertulang

Total Luas Bangunan : 11300 m2

Total Gedung : 1 Gedung

Total Lantai : - 8 Lantai hunian

- 1 Lantai Mezzanin

- 1 Lantai Ground

Total Unit Hunian : 106 unit

Jenis Pondasi Bangunan : Pondasi Tiang Pancang