The remaining grounds around the tennis court and the sports pavilion will be landscaped. It will be elevated and covered with drought resistant grass. The grounds will be left open and will be used for town fiesta activities.
The Municipal Support Services Buildings Area
Todate, no renovation has been planned for this Building.
Todate, no renovation has been planned for the Municipal Support Services Buildings. The concrete-steel fence will eventually be completed to surround the buildings. A gate for each building will be added.
In conjunction to the fitness trail in Phase 2 work, one (1) exercise station will be installed.
While it is impossible to acknowledge everyone who has, in some way, contributed to the Mangatarem Town Plaza Renovation Project, we must recognize those directly involved. Those people who volunteered their services for this Project:
1. Honorable Ramil Penic Ventenilla, Municipal Mayor, Mangatarem, Pangasinan. For allowing us to make this project a reality.
2. Romulo Espiritu Saura, PEE - Project Leader
3. Andronico Fernandez - Project Manager
4. Penn Cruz - Project Architect (Responsible for the overall Town Plaza Coordination and Design)
5. Oscar Jazmin (Chicago, USA) -Project Architect. (Responsible for the Sports Pavilion and Design)
6. Cirilo Regalado PE (Corona, California USA)- Project Engineer responsible for the design of the Nature Park
7. Engr. Junf Miguel V. Ramolete Sr.,
8. Sheryl Sison. - Project Architect/Civil/Structural Engineer
9. Arnel Agliam - Project Electrical Engineer
10. Meldee Galano - Project Secretary
Currently located in the Northwest Quadrant (corner Gen. Luna St. and Gutierrez St.). To date, no renovation has been planned for the existing RHU 1, MSWDO, DSWD, ABC, Senior Citizen's building, the comfort room and the Shahani Gym. The work on the concrete fence surrounding the building will be completed. In conjunction to the fitness trail in Phase 2, one (1) exercise station will be installed. The remaining grounds will be landscaped and will be used for town fiesta purposes.
The Sports Pavilion Area
The Tennis Court will be relocated 2m to the west to make extra real estate for the Sports Pavilion. The Tennis Court fence surrounding it will be completed and planted with climbing vines. Two (2) gates will be added as well.
In conjunction to the fitness trail in Phase 2 work, one (1) exercise station will be installed.
The Sports Pavilion will measure 1,620 sq. meters. It will house an NBA size basketball court, weight room, table tennis, martial arts dojo, separate gender comfort rooms, custodian's cleaning supplies/equipment room, building manager’s office and town plaza security office. The basketball court will be designed to easily convert into a volleyball court.
The remaining grounds around the tennis court and the sports pavilion will be landscaped. It will be elevated and covered with drought resistant grass. The grounds will be left open and will be used for town fiesta activities.
This will be located in the Southwest Quadrant (corner Mabini St. and Gutierrez St.). The Tennis Court will be moved to the west to make more room for the Sports Pavilion. The Tennia Court fence will be completed. The existing basketball court will be demolished and a new Sports Pavilion will rise in its place. The sports pavilion will house a basketball court, weight room, table tennis, martial arts dojo, LGBT compliant comfort rooms, a custodian's cleaning equipment room, building manager's office and town plaza security room. In conjunction to the fitness trail in Phase 2, one (1) exercise station will be installed. The remaining grounds will be landscaped and will be used for town fiesta activities.
UNDER DESIGN
UNDER DESIGN
UNDER DESIGN
The auditorium which is currently located in the center of the plaza. The stage will be renovated. The gate, the 2-orchestra stages, the bleachers and the comfort rooms will be replaced. The Classic Kiosko, which we used to have, will be reconstructed. The fence that surrounds the auditorium will be replaced.
The Auditorium Area
UNDER DESIGN
3
A view of the town plaza on Gutierrez St. looking towards Mabini St. Here we can see the age-old star-apple trees with the Tennis Court and covered Basketball court in the background.
A view of the town plaza on Mabini St. looking towards Romulo Highway. In the foreground are the street food stalls and on the background the age-old star-apple trees.
A view of the town plaza on Gutierrez St. looking towards Gen. Luna St. Also seen is the Shahani Gym building.
A view of the town plaza on Mabini St. looking towards Gutierrez St. Seen in the background is the covered Basketball Court. In the foreground are the street food stalls and age-old star-apple trees.
The Tennis Court.
The Shahani Gym building.
The covered Basketball Court.
This will be located in the Northeast Quadrant (corner Romulo Highway and General Luna St.). It will have lots of shady trees, shrubs, landscape boulders, cobbles, pebbles, etc. A winding walking/running fitness trail covered with asphalt will wind around the nature park and the children's playground and will have six (6) exercise stations. Two (2) large hexagonal-shape gazebo and dry creek bed will be included as well. In addition, a Christmas tree lightstand, a new Gate, a trellis, bus loading/unloading bay and a parking lot. The Rizal Monument will be renovated.
The fitness trail will wind around the Nature Park area and is asphalt covered. It will have six (6) exercise stations along the trail. Shown are three (3) of the exercise stations.
The Children’s Playground will be covered with sea sand. It will have a seesaw, merry-go-round, swing set, slide, chin-up bars and spring rider. Litter receptacles, bike racks and benches will be provided as well.
b. The Water Fountain – The Water Fountain will have flowing water and water jets. The water fountain will be surrounded by spot lights.
The dry creek bed will feature a dry creek bed water source, a wood bridge, an Island with a Mango in the middle and water drain.
The Nature Park Area
There will be two (2) large gazebo in this area. The hexagon-shaped gazebo measures 5 meters on all six (6) sides. It will have a barbeque pit, tables and chairs. It wil be rented out for parties.
The Parking Lot will accommodate fifteen (15) full size vehicles and (1) handicap access space.
The indented curve Bus Loading/Unloading Bay is designed to eliminate vehicular traffic along Romulo Highway. It can accomodate 2-big buses, if parallel park.
This will be located in the Southeast Quadrant (corner Romulo Highway and Mabini St.). It will feature food stalls, a bandstand, a pre-program interactive water fountain, five (5) gazebos, separate gender LGBT compliant comfort rooms, solid waste trash storage shed, a bus loading/unloading bay, passenger waiting shed and parking lot. In conjunction to the fitness trail in Phase 2, one (1) exercise station will be installed.
A view of the town plaza on Gen. Luna St. looking towards Gutierrez St. Seen from left to right is the RHU 1, MSWDO, DSWD, ABC and SSC buildings.
A view of the town plaza on Gen. Luna St. looking towards Romulo Highway. Seen on the right is the PDRRMC building while in the foreground are the street food stalls.
The Rural Health Unit I building.
The Senior Citizens Center building.
The MSWDO building.
The ABC building.
The DSWD building.
P
H
A
S
E
A food stall measures 3m wide x 5m deep. There will be 10 individual food stalls and one (1) coffee shop.
1
The Auditorium bleachers and seen in the background is one of the Orchestra stage.
The Rizal Monument with the Auditorium seen in the background.
The Auditorium Gate.
The Auditorium gate, looking towards Romulo Highway.
The Auditorium stage.
A vintage picture of the Classic Kiosko. This demolished octagonal structure was located in the middle of the Auditorium. It served as the place when VIP's were honored. It also served as a meeting place and as a Municipal bandstand. Seen in the picture was the induction of Mangatarem Municipal Officials. From left to right are Councilor Ramon Ventenilla, Councilor Fidel Jazmin, Vice Mayor Jorge Mendoza, Councilor Victoriano Bugayong, Councilor Cesar Olegario, Mayor Jose Alamillo and Elementary School Superintendent Narciso Seril.
The Auditorium comfort rooms located behind the Auditorium.
The Five Phases of Renovation
Todate, the Renovation of this project is on its engineering and design phase. The following pictures on this Power Point Presentation may not yet depict the completed structures. However, we will continually replace these pictures as final drawings are available.
As much as possible we will save existing trees. Old tress along Mabini, Gutierrez, and Gen Luna Streets will be saved. Pine trees inside the Auditorium will be saved as well. Other trees which do not blend with the current design will be cut down to make room for new construction.
If design allows us, we will include "Handicap Access" on all new and renovated structures.
It has been the dream of all residents of Mangatarem, Pangasinan to have a beautiful Town Plaza. With the election of Mayor Ramil Penic Ventenilla, this dream will now become a reality.
Current Mangatarem Plaza
An aerial view of the northeast portion of the Town Plaza. Seen from left to right is the People's Gate, the Rizal Monument, the Christmas Tree lightstand, the Auditorium and the Children's Park. Structures on the sidewalk are the street food stalls.
A view of the Christmas Tree lightstand and the Children's playground in the background.
An aerial view of the southeast portion of the Town Plaza. Seen from left to right is the Gazebos, the Water Fountain and the Comfort Room. Structures on the sidewalk are the street food stalls and the passenger waiting shed.
A view of the People's Gate with the Rizal Monument in the background.
A view of the southeast portion of the plaza. Seen from left to right is the Water Fountain and the Gazebos. Structures on the background are the street food stalls and the age-old star-apple trees.
The Renovation of the Mangatarem Town Plaza
Renovation Project