Fort Wayne, Indiana

Project Notes

Green Lines Indicate Existing Air Lines

Fort Wayne, Indiana

  • Numbers in PINK are Problem Areas
  • Recommendations for system improvement are in RED

Compressed Air System Improvements

Presentation by: Michael Gant (260) 417-3247

(3) 350hp Fixed

(1) 350hp VSD

Dana Fort Wayne Plant Layout

Tube Mill

110 Slip Yokes Lines 2 & 3

240 Grob Bank

6

240 Grob Splined Drive Shaft Tubes

Close Loop

4" pipe

110 Line 1

110 Lines 4 & 5

Storage

Project Goal

North

860 Service

Plant Services

Recommended Piping Solutions

Shipping

Improve Piping in Strategic Locations

Garage

Salvage

Layout Zeiss

Heavy Trucks

Raw Storage

Receiving

Tool Room

Open

350 Case Assy

860 Housing

2

Close Loop Location S20

Identify areas for improvement in overall system piping, focusing on areas where pressure drop is an issue.

541-2

200

Open

1. Close loop in area between 310 and 109

2. Close loop at location S20 near area 300

3. Close loop in area between 300 and 121

4. Install new header and drops in Cutter Grind

5. Connect 4" lines at Shot Peener

6. Close loop between lines @ 110

310

3

Stores

2200 Gal

Open

661

109

541-1

300

Open

541-3

1

Close Loop Between 310 and 109

202 Alum Carrier Machine

400

377

541-4 Carriers

109 Flanges

Close Loop

121 Carbs & 6

Storage

Connect 4" air lines to support Shot Peener

4" Line

Unused 4" Line

400 gal

#1

#2

121 (1-4 Carb. & Quench Gears

Shot Peeners

5

4" Lines for shot Peener Application

121 Hangas Anneal

131

Closing the loop - will improve pressure in 131 and 151

151

121 Carburizers 1-4. & Quency Gears

4

Cutter Grind

Recommend New Header & Drops

Michael Gant (260) 417-3247