Green Lines Indicate Existing Air Lines
Compressed Air System Improvements
Presentation by: Michael Gant (260) 417-3247
Dana Fort Wayne Plant Layout
Tube Mill
110 Slip Yokes Lines 2 & 3
240 Grob Bank
240 Grob Splined Drive Shaft Tubes
110 Line 1
110 Lines 4 & 5
Storage
North
860 Service
Plant Services
Recommended Piping Solutions
Shipping
Garage
Salvage
Layout Zeiss
Heavy Trucks
Raw Storage
Receiving
Tool Room
Open
350 Case Assy
860 Housing
Identify areas for improvement in overall system piping, focusing on areas where pressure drop is an issue.
541-2
200
Open
1. Close loop in area between 310 and 109
2. Close loop at location S20 near area 300
3. Close loop in area between 300 and 121
4. Install new header and drops in Cutter Grind
5. Connect 4" lines at Shot Peener
6. Close loop between lines @ 110
310
Stores
2200 Gal
Open
661
109
541-1
300
Open
541-3
202 Alum Carrier Machine
400
377
541-4 Carriers
109 Flanges
121 Carbs & 6
Storage
400 gal
#1
#2
121 (1-4 Carb. & Quench Gears
Shot Peeners
121 Hangas Anneal
131
151
121 Carburizers 1-4. & Quency Gears