Introducing 

Prezi AI.

Your new presentation assistant.

Refine, enhance, and tailor your content, source relevant images, and edit visuals quicker than ever before.

Loading content…
Loading…
Transcript

bridge construction

First we took popsicle sticks and layered them to make the start of the base

Me and Tyler entered the St. John's bridge building competition this year at the Geo Centre. In this prezi we will explain the construction process the bridge went through before it was finished.

We then started layering over planks of sticks for the main base

Then we put the base together

Then we built the walls and put the top on

What we could have done to improve the bridge is that we could have built cross braces like this one

We also could have used more suspension like this one

btw the dimensions are 10 by 8

The last bridge we researched was the Confederation Bridge that connects New Brunswick to PEI.

The second bridge we researched was the Brooklyn Bridge in New York.

The first bridge we researched was the London Bridge.

or we could have layered the base some more like this

It was completed in 1883

It was opened in 1824

Its width is 26m

Its length is 1825m

Its length is 269m

Its width is 32m

Its length is 12900m

Its length is 36m

Learn more about creating dynamic, engaging presentations with Prezi