Introducing
Your new presentation assistant.
Refine, enhance, and tailor your content, source relevant images, and edit visuals quicker than ever before.
Trending searches
System manufacturers, glass suppliers, designers, and installers hire us for 3 main reasons:
We designed, engineered, manufactured, and delivered the custom steel turrets
in only 45 days.
Our client received every piece of our documentation ahead of schedule.
Two engineers who participated in constructing the turrets traveled in September 2015 to NYC for on-site installation support.
Only high quality steel was used in manufacturing.
No welding on-site will be needed.
We can!
The Installer
That night, after having inspected the preassembly, our client slept peacefully.
No painting will be needed on the construction site.
The Architect
Can you design the modules not too big and not too small?
Can you make the turrets easy to assemble on-site, using only bolts and without welding?
Can you manufacture the turrets and ship them to NYC?
Hardly any construction project would be too much for our large network of independent professionals that we can activate quickly.
We can do that because since 1990 we've been part of the AluK Group, one of the leading European brands of high quality systems for aluminium windows/doors and curtain walls.
The Investor
Can you make the turrets look great, as if they were made of just one part, with no visible bolts on joints?
How can we lower the construction price?
Can you complete it ahead of schedule? We're in a rush.
The steel tubes consist of multiple parts...
...but we hid the bolts / joints with steel caps...
...and delivered the structure nicely painted.
View other successful projects and download our brochure on our website:
http://www.itd.systems
ITD:
Custom
Fast
Competitive
Solutions
Delivery
Prices