Introducing
Your new presentation assistant.
Refine, enhance, and tailor your content, source relevant images, and edit visuals quicker than ever before.
Trending searches
2:50 pm
2:59 pm
3:01 pm
3:05 pm
3:06 pm
3:08 pm
3:09 pm
3:10 pm
3:11 pm
3:14 pm
3:35 pm
3:43 pm
3:45 pm
3:46 pm
3:47 pm
4:39 pm
5:16 pm
- A hose from the exhaust system in the attic storage area above the service area, fell burning to the floor
PD
- Fire knocked down (completely extinguished)
PD
H
Eng2
H
Building Background:
H
Triage
Area
ICP
PD
ICP
Triage
Area
PD
- Water tender 1 and Water tender 2 arrive on scene
- Tow trucks arrive on scene
PD
ICP
EMS Staging
M4
W2
EMS Staging
- Fire Cop (Capt. Joe) and Safety Officer (Lt. Mack) arrive on scene
- Fire Cop (Capt Joe) receives orders from command to:
- Safety Officer (Lt Mack) receives orders from command to:
EMS Staging
M4
W2
PD
- Overhaul process begins with FD personnel (3rd alarm and Rescue units).
- 2nd Alarm is released
- Fire Cop Capt Joe gives an update to the media during a news conference.
EMS Staging
M4
W2
- Engine 1 (Capt. Luke) arrives on scene
- Firefighter and Engineer pull 2&1/2 inch attack line
- Engine Capt. does 360 size-up of structure
M3
Eng2
M3
Truck 1 (Capt. Jacob) receives orders to:
- exposure protection for Kirk’s Auto Center to the N, trees and vehicles to the E).
Truck Capt. Jacob links up with building supervisor to devise best plan for moving the vehicles in immediate vicinity of fire.
M3
- Overhaul complete - Demobilization
- Tow trucks are released
- 3rd alarm packs up
- 1st alarm inventories all respective hose, tools, and equipment
- Water tenders are released
- PD opens River St back up
M2
M3
Eng2
T1
- Hackensack PD arrive on scene and report to the IC
- IC orders officers to
- avoiding LDH hose from Eng 2
- coordinating placement with Fire Cop Capt Joe.
Eng2
M2
Eng2
M2
- Medic 2, Medic 3, and Medic 4 arrive on scene
- Paramedic Cathy takes charge of EMS personnel as the Medical Group Supervisor and is accountable for all medical personnel.
Eng2
T1
Mobile
Rehab
M2
- At about the same time, another employee discovered heavy smoke in the attic on the west side of the repair shop
T1
Mobile
Rehab
Eng2
T1
Mobile
Rehab
T1
Mobile
Rehab
Eng1
PD
T1
Mobile
Rehab
Eng1
PD
FD Staging
Eng1
FD Staging
Eng1
PD
BC1
FD Staging
Eng1
3rd
Alarm
Eng1
3rd
Alarm
Eng1
3rd
Alarm
BC1
Eng1
FD Staging
FC
Tow2
3rd
Alarm
S
FC
S
Eng1
Tow2
S
BC1
FC
Tow3
S
3rd
Alarm
BC1
PD
S
BC1
S
PD
FC
BC1
Tow2
2nd
Alarm
W1
S
PD
FC
S
BC1
2nd
Alarm
W1
PD
R4
FC
2nd
Alarm
Tow1
R3
R4
R3
2nd
Alarm
W1
FC
Tow1
R3
R4
PD
H
R3
R4
H
PD
Tow1
H
R3
PD
H
PD
H
PD
H
Building Description:
3:08 pm
3:10 pm
3:08 pm
PD
H
- Fire investigator inspects the building, looking for place of origin, signs of arson
H
- 911 call (woman called from across the street)
- Dispatch tones out to FD units
H
Triage
Area
ICP
Eng2
ICP
Triage
Area
PD
- Roof collapses in the B-C corner of building.
- IC conducts PAR with all officers
PD
EMS Staging
ICP
M4
W2
EMS Staging
M4
PD
EMS Staging
M3
M4
M3
W2
- 1st alarm FFs go to rehab (switch out SCBA bottles, McDonald’s from across the street, Gatorade, water, monitor vitals, cold wet towels, dry towels, etc.)
- BC Cody calls into dispatch a status report on fire.
M3
- Put the wet stuff on red stuff
M2
Eng2
M3
Eng2
Battalion 1 (BC Cody) arrives on scene
- IC requests additional resources
(2) RIC (1 Capt/3 FF)
(4) Engine (1 Capt/1 Eng/1 FF)
(2) Truck (1 Capt/3 FF)
(2) Water Tender (1 Engineer/1 FF)
(1) Patrol Supervisor
(5) Patrol Officers
(3) Ambulances
For Command Operations
For RIC
Dispatch Responds:
M2
Eng2
T1
Mobile
Rehab
T1
Mobile
Rehab
- Rescue 3 and Rescue 4 arrive on scene, both Rescues led by (Capt Maddie)
- Capt. Maddie receives orders from IC to:
- Capt. Maddie completes her own 360 size-up and formulates a rescue plan using the acronym AWARE.
Air supply for downed FF.
Water in the hoseline to fight fire.
A radio with dedicated rescue frequency.
Extrication tools and equipment needed to recover downed FF.
- 2nd and 3rd Alarm arrive on scene, standby in FD staging area, officers report to IC
IC (BC Cody) completes RECEO-VS plan:
- 2 in 2 out established with Eng 1 (Capt/FF) and Eng 2 (Capt/FF)
Eng2
M2
Eng2
- Engine 2 (Capt Kevin) and Truck 1 (Capt Jacob) arrive on scene
- Engine 2 receives orders from command to:
- hydrant at the first entrance to the McDonald's parking lot, on the West side of River St
- Flow water before laying line (this is primary water until water tenders arrive; ETA 8 minutes)
- Forward hose lay
T1
Eng2
Mobile
Rehab
PD
T1
Mobile
Rehab
FD Staging
PD
T1
FD Staging
Eng1
PD
3rd
Alarm
Eng1
FD Staging
3rd
Alarm
FD Staging
FC
Eng1
FD Staging
Tow2
FC
S
3rd
Alarm
Tow2
Eng1
Eng9
S
Eng1
BC1
Eng1
3rd
Alarm
PD
FC
Eng1
3rd
Alarm
BC1
PD
S
FC
2nd
Alarm
W1
BC1
Tow2
S
BC1
S
PD
2nd
Alarm
W1
BC1
PD
R4
PD
2nd
Alarm
R4
Tow1
R3
Tow1
2nd
Alarm
R3
W1
S
H
S
R4
PD
H
R4
R3
R4
PD
H
R3
Tow1
FC
R3
PD
H
PD
H
PD
H
- Mobile Rehab Unit
- Law Enforcement Officers are needed for traffic control operations. Closing down the immediate area will help with the protection of the deployed hose lines and will also keep non-essential personnel out of the incident.
- Hose line protectors
- Upgraded radios with multiple frequencies
- Public Address System to evacuate the building
- Extinguishing Agents such as Aqueous Film-Forming Foam (AFFF)
- Additional Water Sources
- Private Contractors
- 1st Alarm (13 on scene)
- 2nd Alarm (16 in Staging Area 1)
- 3rd Alarm (8 in Staging Area 2)
- Hackensack Police
Department (10 on scene)