Introducing 

Prezi AI.

Your new presentation assistant.

Refine, enhance, and tailor your content, source relevant images, and edit visuals quicker than ever before.

Loading…
Transcript

Questions?

References

* [1] JEROMEARIZONA. (N.D.). RETRIEVEDFEBRUARY09, 2016, FROMHTTP://WWW.AZJEROME.COM/JEROME/ SENGSTOCK, A. (2016).

•[2] INITIALCLIENTMEETING. JEROMETOWNHALL. TOWNOFJEROME. (2015).

•[3] GENERALPLANSTEERINGCOMMITTEE(PP. 1-5). JEROME, AZ: TOWNOFJEROME.

•[4] JEROMEMAP. (N.D.). JEROMEMAP. [PHOTOGRAPH] AVAILABLE: HTTP://JEROMECHAMBER.COM/WPCONTENT/THEMES/JEROMECHAMBER/IMAGES/ARIZONA-MAP.PNG •[5] ALBERTSENGSTOCK. (N.D.) [PHOTOGRAPH]. AVAILABLE: HTTP://INWEEKLY.NET/WORDPRESS/WPCONTENT/UPLOADS/2013/06/AL-SENGSTOCK.JPG

•[6] ADOT LOGO. (N.D.). [PHOTOGRAPH]. AVAILABLE: HTTPS://UPLOAD.WIKIMEDIA.ORG/WIKIPEDIA/EN/THUMB/E/EE/ARIZONA_DEPARTMENT_OF_TRANSPORTATION_(LOGO).SVG/102 4PX-ARIZONA_DEPARTMENT_OF_TRANSPORTATION_(LOGO).SVG.PNG

•[7] JEROMEPARKING. (N.D.). [PHOTOGRAPH]. AVAILABLE: HTTP://NERDSONTHEROAD.COM/WPCONTENT/UPLOADS/2015/07/JEROME-PARKING.JPG

•[8] PHOTOSUSEDWITHTHEPERMISSIONOFRONCHILSTON •

[9] JEROME. (N.D.) [PHOTOGRAPH]. AVAILABLE: HTTP://WWW.PLANETWARE.COM/PHOTOS-LARGE/USAZ/ARIZONA-JEROMETOWN.JPG

[10] GOOGLE EARTH. “TOWN OF JEROME,AZ”

Broader Impacts

Figure 15: Broader Impacts

15

Project Schedule

Table 7: Project Schedule

14

Project Cost Estimate

Design Summary

Table 3: Material Cost

Table 5: Actual Hours/Cost

Table 2: Project Summary

Jerome Traffic Study

Table 6: Projected Hours/Cost

Table 4: Labor Cost

Total Cost: $38,123

13

12

Design Process

11

Figure 14: AutoCAD Plan Sheet 16 & 17

=Direction of Traffic Flow

10

Figure 13: AutoCAD Plan Sheet 15

Figure 11: 2"x4" Wooden Delineators [9]

Figure 12: Wooden Delineators Installed [9]

9

=Direction of Traffic Flow

8

Figure 10: AutoCAD Plan Sheet 13

Potential Solutions

Figure 9: Jerome Map [10]

7

Design Options:

  • Maintain Status Quo (Do Nothing)
  • Mitigation of Immediate Concerns
  • Redesign of Entire Corridor

6

Data Collection & Analysis

K.A.S.T Engineering

Parking Study

  • On-Street Parking
  • Parking Lots

Supplemental Surveying

  • GPS
  • Measuring Wheel

Figure 8: Areas of Interest [10]

Table 1: Parking Study Data Overview

Tasks

Figure 7: Collapsed Parking Lot [3]

5

Saud Al Dandan Hashim Sabyah

Cristian Tafoya Bethany Kieffer

1.0 Field Evaluation

  • 1.1 Parking
  • 1.2 Signage
  • 1.3 Striping/Marking

2.0 Surveying

  • 2.1 Parking Area
  • 2.2 Signage
  • 2.3 Striping
  • 2.4 Data Upload & Analysis

3.0 Parking Use Survey/Study

  • 3.1 Data Upload & Analysis

4.0 Design

  • 4.1 Existing Conditions
  • 4.2 Parking
  • 4.3 Signage
  • 4.4 Striping
  • 4.5 Markings
  • 4.6 Standards & Codes

5.0 Project Managemement

  • 5.1 50% Submittal
  • 5.2 Final Design Report
  • 5.3 Final Presentation
  • 5.4 Website

Acknowledgements

4

Northern Arizona University

Figure 6: Client, Albert Sengstock [2]

  • Client: Albert Sengstock, Zoning Administrator/Historical Preservation Officer at Town of Jerome Arizona
  • Technical Advisor: Dr. Edward Smaglik
  • Alarick Reibolt: Grading Instructor
  • Town of Jerome
  • Government
  • Local residents, businesses, and tourists
  • Arizona Department of Transportation (ADOT)
  • Shephard Wesnitzer, Inc

CENE486C 12/9/ 2016

3

Figure 3: Jerome Logo [5]

Figure 4: ADOT Logo [6]

Figure 5: Technical Advisor, Professor Smaglik [7]

Project Background and Scope

2

Figure 2: Areas of Interest in Jerome [10]

Existing Conditions:

  • Faded pavement markings and striping
  • Outdated signage
  • Increased need for parking

Purpose:

  • Provide better navigational clarity
  • Ensure all striping, pavement markings and signage are up to MUTCD standards
  • Improve space utilization and accessibiltiy of existing parking lots and on-street parking