Introducing
Your new presentation assistant.
Refine, enhance, and tailor your content, source relevant images, and edit visuals quicker than ever before.
Trending searches
The type of engineering done was civil engineering.
Louisville,Kentucky&The Ohio River
The time frame was June 1928-October 31,1929.
The cost of the project was $4.7 million
The time for the bridge was June 1928 until October 31,1929.
The cost