Introducing 

Prezi AI.

Your new presentation assistant.

Refine, enhance, and tailor your content, source relevant images, and edit visuals quicker than ever before.

Loading…
Transcript

The George R. Clark Memorial Bridge

The type of engineering

The type of engineering done was civil engineering.

The bridge location

time&cost

the cost,time frame,&materials used

Louisville,Kentucky&The Ohio River

The time frame was June 1928-October 31,1929.

The cost of the project was $4.7 million

The time for the bridge was June 1928 until October 31,1929.

The cost

Learn more about creating dynamic, engaging presentations with Prezi