ISHIKAWA DIAGRAM
Network Pwb wire Preparation
Front grill assembly process
WHY choose this theme?
Subwoofer packing
Subwoofer supply conveyor
Main Assembly Layout
Our Team Name & Logo
Subwoofer and sound bar pairing process
AFTER MAIN ASSEMBLY LAYOUT
ITEM
SAVE
COST (RM)
CALCULATION
Insufficient facility
and layout
(Cause sets transferring
& waiting loss)
FINAL
38.06 sec
38.06 X 0.6245 X 450 X 20 X 3 / 60
RM 10,695
Contract worker attendance
turn out insufficient
Eliminate transfer loss
TOTAL PREPARATION TIME
3.Appearance
4.Packing
RM 7,200
2.Inspection
1.Fix & screw soundbar
TOTAL FINAL ASSEMBLY
2 M/P
2 X RM1200 X 3
New worker training loss
Conveyor too long
28.37 sec
28.37 X 0.6245 X 450 X 20 X 3 / 60
RM 7,972
TOTAL PACKING
Brainstorming Ideas
PREPARATION
RM 25,867
Grand Total
1) Stick felt to Network Pwb wire one by one.
* Jig design similar to ladder type , as to simplify and reduce hand motion.
Part arrangement
change
Improved 5S
Part arrangement
change
Improved conveyor
1.Existing conveyor line not enough capacity to
cope with the production plan.
2.Production line capacity low.
3.To reduce unnecessary loss on process occured
in production.
4.To improve production & factory efficiency by
strengthen line balancing & facility.
Prod. Staff need to pickup Sub Woofer & Sound Bar near to pairing unit place.
One P/S is required to place Sub Woofer on working bench. Only 4 unit can be placed.
SAVE
RM25,867
( 3 MONTH )
Eliminate All distractions
32 METER
1) Make small hanger using Box File Clip to hang HDPE Bag.
Working method impropriate
1) Adjust the positioning Pairing Unit.
2) PS only require to turn & pickup
Sound Bar.
3) Readjust Ac Cord Connector Height
Conveyer design improved will be benchmark for standardization of similar product. ( Plan new project method for new model 2013 )
Plan straight line layout to reduce MP & get optimum quantity.
1) HDPE Bag hang on Pipe & Joint for PS to pick & cover Sub Woofer.
2) This bag easily fall down on floor as it's smooth surface.
Design matter cause
material defect
(Button stuck problem)
one time.
2) Input Sub Woofer to Pairing Inspection using new conveyor
3) Same manpower used to support at packing area.
Nature of job distribution
not smooth
Jig is located beside conveyor.
Jig is directly located on the conveyor.
Reduce hand and body motion time.
Reduce push and pull jig process and body
turning motion.
Manpower vs process
not match
Start the Task
3)Using 3 steps Jig by modifying single jig so that 3 wire can be prepared at a time.
6.Hi-pot & vibration test
7.Fix speaker
5.Preparation
8.Transfer next station
2) Make new Single Jig for preparation.
Target Achieved
Line Balancing
Speaker unit preparation
Packing Layout
Subwoofer packing
Sound bar packing process
10 meter pairing process
Carton transfer slow effect the packing jobs
Monitor progress
Loss time 3
AUTO
SEALING M/C
Warehouse
ROLLER CONVEYOR
BELT CONVEYOR
Carton Preparation
Packing
3
Packing
4
Wrapping Sound Bar
Appearance
10
Meter
Pairing
Sound
Bar Unit From Gr.Floor
Warehouse
502
Carton
Preparation
Packing
2
386
Packing 1
A
ROLLER CONVEYOR
Part arrangement
change
Improved 5S
How does it occurs?
Production output qty low, sets transferring & waiting loss.
P
BELT CONVEYOR
Plan the activity
AUTO
SEALING M/C
Using flip Jig to apply cushion.
Pairing
Packing 4
Packing 3
What is the root cause ?
limitation of the
conveyor system
not suit to the
model.
(Vizio sound bar)
Sub Woofer Input
Continue to implement straight
and understanding
INPUT = OUTPUT
to others audio production line.
Nature of job & job distribution
Sound bar unit
Wrapping
Sound Bar
not even .
Place
Sub Woofer To Table
Place
Sub Woofer To
10 Meter pairing
Appearance
From Gr.Floor
Stanble For Pairing
Pairing Unit For Pairing
KC Ewe
Part arrangement
change
Improved motion
Stick Cushion to Speaker unit inner baffle L & R manually at 3 position.
Ergonomic working method
Improved table height
Packing 2
Carton Preparation
Packing 1
1) Packing table height was lower than conveyor
AUTO SEALING M/C
1) Poor arrangement of Packing material.
2) Effect overall 5'S.
Warehouse
ROLLER CONVEYOR
Where this problem happens?
Audio Production Area
(Vizio sound bar line)
Packing 3
Packing 4
Packing 1
LV Loo-1st speaker
Nikkie - prepare material
Pairing
Who is responsible
to increase production
output qty?
Prod. Eng’g, Officer,
Technicians, prod. staff
1) Front View of this process shows no facility / improvement done to support prod.
Wrapping Sound Bar
Appearance
10 Meter Pairing
Sound Bar Unit From Gr.Floor
1) Make new working table to place packing material in front of P/S (to bring parts/ component nearer to the working area)
Packing 2
Sub Woofer
Input
1) Adjust current packing table height to same level of conveyor.
2) Make additional working table to speedup packing process.
Loss time 2
Job distribution not even
C
Loss time 1
D
Place subwoofer to table stanble for pairing
Place subwoofer to pairing unit
Pairing
1) Rearrange parts as easy for PS to pickup.
SP Foo-line layout
HS Cheng -line layout
Shukery-process study
PAIRING
UNIT
Why does it happens?
The output qty not tally against the tact time
When it happens?
During production
running.
Sub Woofer Input
.
Jun 12
Aug 12
Sep 12
Apr 12
May 12
Sep 12
Jul 12
KY Khoo -line layout
Lingam-line balancing
Zaini-data collector
Saniah-animator
3 JAN 2013