Introducing 

Prezi AI.

Your new presentation assistant.

Refine, enhance, and tailor your content, source relevant images, and edit visuals quicker than ever before.

Loading content…
Transcript

ISOBUTANE DRYER ADSORBENT BED SWITCHING VALVE

ADSORBER A

(BED A)

ADSORBER B

(BED B)

OLEFIN TREATER

E36170 - REGEN N-BUTANE STEAM VAPORIZER

E36171 REGEN ELECTRIC SUPER-HEATER

V36171A N-BUTANE DRYER

V36171B N-BUTANE DRYER

E36172 REGEN N-BUTANE AIR COOLER

E36173 REGEN N-BUTANE TRIM COOLER

12 AUTOMATED ORBIT SWITCHING VALVES

Process:

The cycle of each Adsorbent Bed consist of:

Adsorption - 24 hours

Regeneration and Standby - 24 hours

Adsorbent Bed A / B

Drain / Heat Cycle - 510 minutes

Cool / Fill Cycel - 150 minutes

Standby -775 minutes

Parallel Flow / Transition - 5 minutes

Overall System :

(2) Adsorber Vessels-

Adsorber A

Adsorber B

(2) Automated Switching Valves Skids

(1)Regeneration Heat Exchanger Skid

(1) Remote Air Cooled Cooler-

Regeneration N-Butane Air Cooler

E36172

Learn more about creating dynamic, engaging presentations with Prezi