Introducing
Your new presentation assistant.
Refine, enhance, and tailor your content, source relevant images, and edit visuals quicker than ever before.
Trending searches
ISOBUTANE DRYER ADSORBENT BED SWITCHING VALVE
ADSORBER A
(BED A)
ADSORBER B
(BED B)
OLEFIN TREATER
E36170 - REGEN N-BUTANE STEAM VAPORIZER
E36171 REGEN ELECTRIC SUPER-HEATER
V36171A N-BUTANE DRYER
V36171B N-BUTANE DRYER
E36172 REGEN N-BUTANE AIR COOLER
E36173 REGEN N-BUTANE TRIM COOLER
12 AUTOMATED ORBIT SWITCHING VALVES
Process:
The cycle of each Adsorbent Bed consist of:
Adsorption - 24 hours
Regeneration and Standby - 24 hours
Adsorbent Bed A / B
Drain / Heat Cycle - 510 minutes
Cool / Fill Cycel - 150 minutes
Standby -775 minutes
Parallel Flow / Transition - 5 minutes
Overall System :
(2) Adsorber Vessels-
Adsorber A
Adsorber B
(2) Automated Switching Valves Skids
(1)Regeneration Heat Exchanger Skid
(1) Remote Air Cooled Cooler-
Regeneration N-Butane Air Cooler
E36172