Who is PGS?
PGS is a solution driven service company committed to provide operational excellence through Testing Evaluation Assessment Maintenance of Generators and Motors to limit the customer's Risk
2010 - Founded in Hongkong as corporate HQ
2011 - Licensed in the Philippines as Power Generator Solutions Philippines
2012 - National Electric Coil (NEC), largest and oldest (1917) independent Generator Rebuilder in USA chose PGS as their authorised Generator Service Provider (GSP)
2015 - Signed an agreement as a Service and Sales Partner for a Global Turbine Manufacturer, Triveni Turbines Limited Inc.
2016 - Selected as Sales and Service Partner for TMEiC (Toshiba Mitsubishi Electric Industrial Systems Corporation)
PGS' Division
Project and Risk Management
Every Repair, Rehabilitation, Shutdown or Outage is a PROJECT
Our goal is to assist our customers in managing the Triple Constraint of Project Management. We can perform this by ensuring the project is on time and at a level of expected quality
Field or Shop Services
Heavy Rigging
Removal and Installation
Assembly and Disassembly
HV Testing
Electrical Inspection
Mechanical Inspection
Restacking Stator and Rotor Core
Rewinding Stator and Rotor
Stator Rewedge
Stability System
Rotor Rings-off Inspection
Rewinding of all motors
Supply
High Voltage Coils to 25 kv
- Inner cooled coils
- Roebel bars
- Hard 'B' Stage bars and coils
- Hard VPI bars and coils
Turbine Generator Rotor Coils
- New and refurbished winding
- Copper or Aluminum
- Direct or Indirect Cooling
- Square or Edge-Bent winding corner
Diesel Powered Generator
Global Influence
Michael Andrew Hudson - Canadian -Chairman
Karla Gabriel Sulit - Filipino - Vice President
Douglas Harrison - American - Technical Director
Yeni Zamira - Indonesian - Director
Michael Harrison - American- Senior Project Manager
Under The Hood
Reuben “Roy” A. Muaňa, PEE, - He is a graduate of University of San Carlos, and received his PEE in 1983. He has been in the Equipment Repair Business in the Philippines for over 37 years.
Douglas Harrison CPE, CPME – over 43 years in Rotating Equipment, expertise in Generator and Motors. OEM experience with GE, Westinghouse and Siemens
Mary Grace Alipio - Graduated in 2005 from University of Perpetual Help with A Bachelor of Science in Electrical Engineering. She has been in the Quality and Rotating Equipment Business for over 10 years.
Edolo Bernardo over 22 years in the apparatus repair business.
Florante Lasprilla with over 19 years in the apparatus repair business.
Jaime Malelang senior winder 20 years in the apparatus repair business
Logistics
Test Instrument
FAULT ZONES
Power Quaity-diagnose voltage spikes, variable frequency drives, harmonic distortion and power imbalance.
Power Circuit-issue are conductors and connectors from the testing point through and including internal motor connections
Insulation - wet insulation between the windings and ground and other surfaces contamination is likely to increase current flow to ground and can sometimes increase temperatures to unacceptable levels
Stator - it is composed of copper windings connected through solder/braze joints and lugs. One need only look at the situation, history to recognize the cost burden that will occur should a stator require a rewind
Rotor - Impedance and Inductance testing are essential for detecting rotor issues and its potential to cause havoc with the stator winding
Air Gap - occassionally overlooked fault zone involves the evenly distributed gap between the rotor and stator. MCEmax data can detect any inconsistencies, which will warrant further inspection. Left unattended a non-symmetric gap could result in a rotor/stator rub and possible catastrophic failure
TEAM 1
12 -hour inspection designed to fit your bore scope inspection outages
TEAM 2
3-5 days analysis designed to fit turbine valve, gas turbine combustion, or hot gas path inspection outages
TEAM 3
7-10 days rotor out analysis designed to fit your major inspection ouatges
Reveals pending faults in windings of the generator rotor and generator stator
Reveals deterioration of coil insulation caused by Partial Discharge and end winding vibration
Establishes a 'base line' for evaluating future inspections and input for establishing planned major maintenance activities
Assessment of End Winding Stability (resonance conditions can be immediately corrected to avoid premature winding deterioration
Core examination to determine visual issues and tightness
Completed Projects
PGS in Action
Our Industry Partners
Right the FIRST TIME, ON-TIME, EVERYTIME, CONTACT US
Website : www.pgsasiapacific.com
E-mail : sales@pgsasiapacific.com
service@pgsasiapacific.com
techsupport@pgsasiapacific.com
Office Number : (0908) 876 4747
Facility
PGS
Content Comparison
Meet the TEAM
“Best Delivery on Large Critical Motor Rewinds in Asia”
Formed stator coils to 7.2kV and DC armature coils, field coils and even specialty coils; our turnaround is hard to beat. We can ship most standard sets of coils in 3 to 4 days or less from receipt of data and on expedited service only 1 to 3 days is also available!
All coils comes with a 1 year warranty from defects in workmanship and materials
Manufacturing
MCE max
Predictive Maintenance
Preventive Maintenance
Reactive