Form 003 signed off for the Flexi-Pile Cap. On-site the pile is cut off at the required level. Holes are then drilled to suit the template provided by FLI.
For speed and accuracy a disk cutter is used
Cutting of the pile: <60 minutes
The drilling template is used to mark drill holes
Profiling for welded bosses & hot works negated
Completion of template: <4 Minutes
Marking of the pile: <5 Minutes
Drill mount is attached to pile
Drilling: <30 Minutes
Adjustment Features of FLI Flexi-Pile Cap
Each tab is fitted with two M36 bolts
Flexi-Pile Cap tabs fitted & ready for the structure
Completed remedial solution: <2 Hours
Solution – FLI Flexi-Pile Cap
Each tab is fitted with two M36 bolts
Flexi-Pile Cap tabs fitted & ready for the structure
interface/plate
to standard 610 piles
Tube drilled and cap fitted
610 pile refused/out of rotation
Structure fitted to pile cap
P A T E N T P E N D I N G
For use with
Four angled fabricated masts
Double channel masts
Challenges on site
Angle of Deviation
Incorrect Orientation
Correct Orientation
Installed out of rotation
Challenge No 4
Offset Deviation
Finish Position
Design Position
Final Position
Design Depth
Set Back From Track
Depth Refusal
Challenge No 2
Challenge No 3
Damaged on installation
Challenge No 1
Standard caps/stubs to fit all structure types
Adaptor beam for services or portals
The Flexi-Pile Cap is a remedial solution for 610 & 762 diameter piles, in particular those piles that refuse early in hard ground and do not achieve full depth, or are out of rotational tolerance.
The Flexi-Pile Cap provides a quick and efficient cutting down solution that negates the need for hot works and re-welding new bosses in-situ. The solution helps to improve the completed productivity of 610 pile installations and enables higher output of piling activity, so more piles can be installed per shift, saving time and money. View our storyboard for more detail on how the Flexi-Pile Cap overcome pile challenges.
P A T E N T P E N D I N G
Identify risk
Design for it up front
A suite of solutions
Overall design input reduced to limit stop flows
Overall manufacturing timeframe reduced
Overall installation timeframe reduced