Audio Transcript Auto-generated
- 00:01 - 00:04
Hello and thank you for taking a moment to watch
- 00:04 - 00:10
this updated tutorial for the operation accreditation inspection cover sheet.
- 00:11 - 00:15
A portion of the accreditation process for operation and accreditation
- 00:16 - 00:20
includes inspections and as it is one of three essential
- 00:21 - 00:22
parts of the application.
- 00:23 - 00:24
This tutorial will help both.
- 00:25 - 00:29
You the inspector as well as you the operation, understand
- 00:29 - 00:32
this cover sheet and why it is important to the
- 00:32 - 00:35
process for the application.
- 00:36 - 00:41
The operation must include their professional inspection report from the
- 00:41 - 00:42
last 12 months.
- 00:42 - 00:46
That inspection must be performed by an A.
- 00:46 - 00:46
C. C.
- 00:46 - 00:49
T. PVM inspector and A C.
- 00:50 - 00:50
C. T.
- 00:50 - 00:55
Certified Professional inspector or a licensed professional engineer.
- 00:56 - 00:59
Now this can very easily be added to your annual
- 01:00 - 01:04
inspection if your inspection has already happened for the year
- 01:04 - 01:07
and you are just now looking into this accreditation process,
- 01:08 - 01:11
your inspector can go back and fill out this cover
- 01:11 - 01:15
sheet as long as the inspection and the inspector fit
- 01:16 - 01:19
our criteria and was done in accordance with chapter one
- 01:20 - 01:21
of the Anti A.
- 01:21 - 01:21
C. C.
- 01:21 - 01:24
T 03 2019 Standards.
- 01:26 - 01:30
Through the Operation accreditation program, we are looking at how
- 01:30 - 01:34
the operation meets all three chapters of the antsy A.
- 01:34 - 01:34
C. C.
- 01:34 - 01:35
T standards.
- 01:36 - 01:39
This cover sheet and the inspection report will cover chapter
- 01:40 - 01:41
one D.
- 01:41 - 01:41
P. I.
- 01:42 - 01:47
Standards. The operation reviewer will cover chapter two Operation Standards
- 01:49 - 01:53
And the training checklist in affidavit will cover chapter three
- 01:54 - 01:55
chaining training standards.
- 01:56 - 01:59
Now these three pieces of the puzzle will enhance your
- 01:59 - 02:06
application and help the accreditation process go much smoother As
- 02:06 - 02:10
an inspector watching this video, A CCT cannot direct you
- 02:10 - 02:14
to provide this cover sheet for every inspection you do
- 02:14 - 02:18
moving forward as the process of finding an inspector is
- 02:18 - 02:21
an open market opportunity and is not directed by A
- 02:22 - 02:22
C. C.
- 02:22 - 02:26
T. However, please be prepared to be asked to fill
- 02:26 - 02:31
out this cover sheet for the accreditation application as well
- 02:32 - 02:35
as for those accredited operations who will need this form
- 02:36 - 02:42
filled for every professional inspection, including acceptance inspections on major
- 02:42 - 02:49
modifications. Now, this professional inspection cover sheet is now not
- 02:49 - 02:52
as long as it used to be and is fil
- 02:52 - 02:54
a BLE inspectors.
- 02:55 - 02:59
When you are filling out this form, please note that
- 02:59 - 03:03
we are looking for elements as well as equipment that
- 03:03 - 03:07
have failed your inspection and the reasons for that failure.
- 03:08 - 03:11
A failure in this sense is an element or equipment
- 03:11 - 03:15
that are not suitable for participant use at that time.
- 03:16 - 03:20
We have included a failure menu and definitions that coincide
- 03:21 - 03:25
with the menu to help indicate the reason for the
- 03:25 - 03:29
failure, all you will have to do now within this
- 03:29 - 03:32
form is click the box and then click the corresponding
- 03:33 - 03:36
failure. If there is one, If there are notes that
- 03:36 - 03:39
you would like to add, please add those into the
- 03:39 - 03:40
notes section.
- 03:45 - 03:47
Now, after that portion of the cover sheet there is
- 03:48 - 03:52
a portion that goes into the DP standard document requirements.
- 03:54 - 03:56
Through this section, you will be met with yes or
- 03:57 - 03:57
no inquiries.
- 03:59 - 04:02
There are different sections depending on what type of inspection
- 04:03 - 04:03
you are doing.
- 04:04 - 04:07
So if you are doing an annual inspection you will
- 04:07 - 04:09
only need to fill out that specific portion.
- 04:10 - 04:14
If you are only doing a major modification, you will
- 04:14 - 04:19
only need to fill out that portion at the end
- 04:19 - 04:22
of this document, you will be asked to print and
- 04:22 - 04:25
fill out the rest with either black or blue ink
- 04:26 - 04:31
to attest in writing that all the documentation, equipment and
- 04:31 - 04:35
elements listed were observed at the client site during the
- 04:35 - 04:38
inspection. As a part of your signature.
- 04:39 - 04:43
You will also need to include your inspector certification number
- 04:43 - 04:48
and the expiration date This form is available on the
- 04:48 - 04:53
Operation accreditation Web page under forms, A copy of this
- 04:53 - 04:57
form has also been sent to all a C.
- 04:57 - 05:01
C. T certified Inspectors and professional vendor members.
- 05:02 - 05:05
If you are filling out this document and you find
- 05:05 - 05:08
yourself with any questions, I encourage you to please contact
- 05:09 - 05:12
me through email at heather at a c c T
- 05:12 - 05:15
info dot org or you can give me a call
- 05:16 - 05:22
at 3038272432 Again, I want to thank you for watching
- 05:22 - 05:28
this short tutorial on the Operation accreditation inspection cover sheet
- 05:29 - 05:31
and please stay safe out there.