Introducing 

Prezi AI.

Your new presentation assistant.

Refine, enhance, and tailor your content, source relevant images, and edit visuals quicker than ever before.

Loading…
Transcript

AIRPORT

EL PRAT DEL

LLOBREGAT

The Control Tower is the place where

the circuit controls the aircrafts,

where they have to land, so there are

no accidents.

Terminal 1

The T1 is a passenger terminal located in the south of the airport, between the two parallel runways. Designed by Ricardo Bofill, was inaugurated on 16 June 2009 and 17 days was set up with a Spanair flight from Madrid. The facilities allow you to receive 30 million passengers a year and increase the capacity of the airport to 55 million passengers a year and give it the ability to manage more than 90 operations per hour. It occupies a floor space of 545,000 m² and is adapted to receive large aircraft like the Airbus A380 through double gateways. It has 13,000 parking spaces, expandable fingers 45 to 60, 15 tapes recoliida baggage check-in counters 168 and 101 boarding gates: gates A and D are in the north wing, the doors to B doors and the central C and E to the south.

Terminal 1 is the storage and turnover would take place, and has at its disposal a set of tracks is bigger than the T-2.

Was created by Ricardo Bofill

T2 was created by Ricardo Bofill was to enlarge the area of ​​the airport when they were held in JJ OO 92 in Barcelona. Is smaller than T1 and is divided into two parts A and B

The terminal T2 is the oldest passenger terminal and consists of three buildings. Formerly, before the opening of the terminal T1, there were three different terminals, the terminals named A, B and C. Currently the three terminals are part of the called terminal T2 and T2A, T2B and T2C, following the old nomenclature. The terminal T2 has the ability to be able to receive 25 million passengers annually, a number close to T1 which guarantees a high capacity of the airport to absorb a growing number of passengers. The terminal T2A contains the boarding of passengers M4 (gates 46-49) and M5 (gates 56-59), T2B contains modules M2 (gates 26-29) and M3 (36-39 gates) T2C and contains the module M1 (gates 16-19)

Interview

Marc: Hello Xavi

Xavi: Hello friend

Marc: Sorry, have a moment

Xavi: Yes,I have one minute

Marc: Where are you from?

Xavi: I'm from Terrassa, but my dad

is Moroco

Marc:Where are you going to???

Xavi: Are going to New York

Marc: Ouuuuu yeahhhh is perfect!!!

I'd like to go to New York

Marc: Who do you travel with?

Xavi: My fathers and grandfathers

Marc: OK, Goodbye Xavi, happy journey

Xavi: Goodbye Friend!!!!! Thanks you.

Video

Xavier Hmichou

Marc Rebollar

Tower of Control 3

One of the most important objectives of the new airport is to meet the needs of people and airlines, both quantitative and cualitativament.

The construction of the third runway and the expansion of the airfield, have required a new control tower that has a more direct visual access to the three tracks, and that, moreover, can be valid for future expansion the Airport.

The new control tower will attend a traffic of 90 flight operations at the time, and hold the tecnlogia and staff necessary in the best conditions.

PASSENGER TRAFIC EVOLUTION

Learn more about creating dynamic, engaging presentations with Prezi