Loading presentation...

Present Remotely

Send the link below via email or IM

Copy

Present to your audience

Start remote presentation

  • Invited audience members will follow you as you navigate and present
  • People invited to a presentation do not need a Prezi account
  • This link expires 10 minutes after you close the presentation
  • A maximum of 30 users can follow your presentation
  • Learn more about this feature in our knowledge base article

Do you really want to delete this prezi?

Neither you, nor the coeditors you shared it with will be able to recover it again.

DeleteCancel

Make your likes visible on Facebook?

Connect your Facebook account to Prezi and let your likes appear on your timeline.
You can change this under Settings & Account at any time.

No, thanks

LEGIT CONSTRUCTION

No description
by

Muhammad Rasyidin

on 4 June 2014

Comments (0)

Please log in to add your comment.

Report abuse

Transcript of LEGIT CONSTRUCTION

LEGIT CONSTRUCTION
BACKGR UND
CONCLUSION
TITLE :
PROPOSED WORK OF DESIGN AND CONSTRUCT ONE (1) UNIT OF IBS GALLERY AT ADELAIDE, AUSTRALIA
Architect
-MUHAMAD HILMI ALI
PROJECT TEAM
OBJECTIVE
To promote a
sustainable property
industry in Adelaide
To introduce the fast track
technique to build building
Reduction of site labour
Faster project completion
Reduce of wastage
Structural Engineer
-MUHAMMAD RASYIDIN ROSLAN
Project Manager
-RUZAINI RAZALI
LEGIT CONSTRUCTION
MATERIAL
RESOURCES
CLADDING SYSTEM
PRECAST SLAB & PRECAST WALL PANEL
ROOFING SYSTEM
-PREFABRICATED STEEL ROOF TRUSS
-CONCRETE ROOF TILE
VENTILATION SYSTEM
DOOR
WINDOW
SOLAR PANEL POWER HOME & WATER HEATER
ALTERNATIVE POWER SOURCE
EXTERIOR FINISHING
WALKWAY - PRECAST CONCRETE INTERLOCKING BRICK
PAINTING - WHEATHER PROOF PAINT
CLIENT
SA Goverment
SIZE
12.6m X 6.8m X 6.4m in height
COMMENCEMENT DATE
1 July 2014
WORKING HOURS
ESTIMATED CONSTRUCTION COST
AUD 376,308.28
CONTRACT DETAIL
CONTRACTOR
LEGIT CONSTRUCTION
CONTRACT DETAIL
COMPLETION DATE
DURATION

1 - 11 JULY 2014
14 JULY -
1 AUGUST 2014
4 AUGUST - 14 OCTOBER 2014
14 - 17 OCTOBER 2014
1. DEVELOPMENT
2. SITE PLANNING
CONSTRUCTION OF IBS GALLERY
Controlled quality
12. HANDOVER
Advantages using
IBS system?
Within the appropriate budget, and high quality of final product, IBS is well said reducing the construction time and more development are seeing in front. It is for great future for Adelaide construction.

To design and build a small show house based on fast track material that called an IBS Gallery

3. Foundation
4. Ground
Beam
5. First Floor-
Precast Slab Panel
6. First Floor-Precast Wall Panel
7. Second Floor-
Precast Slab Panel
8. Second Floor-
Precast wall Panel
9. Roof Installaton -
Prefabricated
Steel
Roof Truss
10. Interior
Finishing
WORKING DAYS
PROJECT FLOW CHART
WORK BREAKDOWN
STRUCTURE
(WBS)
11. Exterior Finishing
17 October 2014
3 1/2 month
78 Days
8.00am - 5.00pm
*
excluding SA public holidays
Project Goal
Build one gallery using fast track method that reduce time and cost at same time improve quality.
Project Scope
Promote Industrialized
Building System (IBS)
in Adelaide
RISK


- IDENTIFICATION
- ANALYSIS
- RESPONSE PLANNING
- MONITORING AND CONTROL
We will work with nature. So the important steps in implement building systems is need to ensure the conservation of flora and fauna, and health of human being.
Reengineering the role of contractor
Restructuring awareness programs
Structuring IBS training program
RECOMMENDATION