Loading presentation...

Present Remotely

Send the link below via email or IM

Copy

Present to your audience

Start remote presentation

  • Invited audience members will follow you as you navigate and present
  • People invited to a presentation do not need a Prezi account
  • This link expires 10 minutes after you close the presentation
  • A maximum of 30 users can follow your presentation
  • Learn more about this feature in our knowledge base article

Do you really want to delete this prezi?

Neither you, nor the coeditors you shared it with will be able to recover it again.

DeleteCancel

Make your likes visible on Facebook?

Connect your Facebook account to Prezi and let your likes appear on your timeline.
You can change this under Settings & Account at any time.

No, thanks

ABO Wind Energías Renovables S.A.

Corporate Presentation

Comments (0)

Please log in to add your comment.

Report abuse

Transcript of ABO Wind Energías Renovables S.A.

Development
Vanesa Revelli
CEO Latin America
ABO

Wind
Energías Renovables S.A. is a subsidiary of the German company
ABO

WIND

AG

ABO

Wind
is one of the
most experienced
wind developers in Europe

With a
staff
of over
285 professionals
working in Germany, Spain, France,
Argentina, Uruguay
, Belgium, Ireland, Bulgaria and Great Britain

Yearly
project
volume
of circa
150- 200 million Euros

More than
700 MW
nominal power connected to the
grid

Over
400 wind turbines
installed and connected
Site locations acquisitions
Site appraisal
Land lease contract

Technical planning
Resource measurement
Authorization process
Grid connection

Financial Planning
Project finance
ABO Invest: own financing

Construction
Construction of foundations, roads and associated
Civil and electrical works
Mounting and installation of the turbines

Operation
Operation and maintenance of the wind farm
Profile
Activities
Development: 3-5 years
Financing y PPA
Site location
Resource
Electrical grid
Topography
and environment
Access
Routes
Site appraisal
Other contracts or agreements
Land Lease contract
(cc) photo by medhead on Flickr
Legal security
Site/s
Land owner
ABO
Wind
Development of a Wind Farm
Measurement campaign
Authorizations
Lay out
Simulations with specialized software
Data analysis
Anemometer
Data logging
Other measurements
Financing
Civil works
Electrical works
Ready-to-Build
3 %
9 %
18 %
70 %
Development and others
Civil works
Electrical works
Wind turbines
Argentina
Uruguay
Latin America
Region
Province
Zone
Sites
Interested!
Interesting...
And it finishes with:
Local effects
Financial Engineering
The works begin!
Construction: 1-2 years
And the wind blows...
Operation
Construction
Commissioning
Facility Management
Maintenance
Operation
Wind turbines
Electrical works
Civil Works
(cc) photo by theaucitron on Flickr
ABO
Wind provides the experience and the resources needed in order to
minimize
the investment risk
Wind Resource Measurement
Wind farm modeling and wind turbines selection
Environmental Impact Studies
Electrical Studies
Project authorizations management in national and provincial entities
Financial Engineering and grantint of a Power Purchase Agreement (PPA)
Services provided by
ABO

Wind
:
(mounting)
EPC
TCM
Micrositing
First selection
Pre-feasibility
Finally, a message to our (future) clients...
Don't panic! We are almost finished!
Mast installation
Maintenance
Exploitation: 20 years
Documentation
Mounting
Foundations
Project developed
Cable trays
Soil Studies
Civil and Electrical works
Whole process supervision by
ABO

Wind
Cost
Structure
Construction Process
Operation
Maintenance
Services
Vanesa Revelli
CEO Latin America

Thanks for your attention!
vanesa.revelli@
abo
-
wind
.de

argentina@
abo
-
wind
.com
www.
abo
wind
.com

Own measurements (in situ)
Own database, measured and processed by
ABO

Wind
Ways of obtaining a PPA
PPA = Power Purchase Agreement
Tenders
Res. 1281/06 (Energía Plus)
Res. 269/08
(Autogeneración Distribuida)
Res. SE 108/11
Resolución 269/08 (Distributed self-generation)
: a power
generator
can also consume its
own production
, buying/selling the
difference
between used and produced energy. The company that consumes the energy must be
the same
that the one that invests in wind power.
Resolución 1281/06 (Energía Plus)
:
major consumers
(>300 kW) must acquire from
new sources
of the market the energy above their demands in 2005; a
minimum energy quota
must be delivered, with production or by buying at the Spot market.
Resolución SE 108/11
:
PPA
at a fixed price between CAMMESA and a
new
generation offer, with monthly payments of “
cost + benefit
(approved by the SE)”. All the energy produced can be sold (consistent with wind power particularities) and dispatch and payment
priority
is contemplated, (same as run-of-river hydro).
Simultaneously...
Project authorization management in national and provincial entities
Electrical Studies
Environmental Studies
Public convenience and necessity license
Project sell
Project Finance
Joint Venture
We are looking for bussines partners!
Trusts
Some projects of
ABO

Wind
:
Projects in Portfolio
At
ABO

Wind
we offer our
Know-How
,
human resources
and
management skills
for those interested in the
wind development
of the Latin American region.
Nominal power:
Capacity factor:
Current status:
50 MW
47.9 %
Ready-to-Build (ENARSA 2010 tender)
Parque Eólico Vientos del Secano
Nominal power:
Capacity factor:
Current status:
100 MW
44.0 %
Advanced development
Parque Eólico del Alto Valle
Nominal power:
Capacity factor:
Current status:
49.5 MW
41.0 %
Development (ENARSA 2010 tender)
Parque Eólico Las Armas
Nominal power:
Capacity factor:
Current status:
50 MW
42.0 %
Advanced development
Parque Eólico La Banderita
Nominal power:
Capacity factor:
Current status:
50 MW
42.0 %
Development
Parque Eólico Vientos del Oriente