Loading presentation...

Present Remotely

Send the link below via email or IM

Copy

Present to your audience

Start remote presentation

  • Invited audience members will follow you as you navigate and present
  • People invited to a presentation do not need a Prezi account
  • This link expires 10 minutes after you close the presentation
  • A maximum of 30 users can follow your presentation
  • Learn more about this feature in our knowledge base article

Do you really want to delete this prezi?

Neither you, nor the coeditors you shared it with will be able to recover it again.

DeleteCancel

Make your likes visible on Facebook?

Connect your Facebook account to Prezi and let your likes appear on your timeline.
You can change this under Settings & Account at any time.

No, thanks

BIM Presentation

An Introduction to BIM
by

andrew bespalov

on 16 August 2013

Comments (0)

Please log in to add your comment.

Report abuse

Transcript of BIM Presentation

BIM
BIM:
Its here, and its here to stay.

BIM
What is BIM?
Or a Technology?
A Process?
Its a combination of Both
Technology
Process
BIM does not come in a box!
BIM
Building Information Management
Acronymns. We do love them!
BIM
Building Information Modeling
BIM, describes the process of designing a “
Building
” collaboratively using a shared database of “
Information
” that is represented by a Computer “
Model


Don’t be misled by the word ‘building’ – BIM can be used in Civil Engineering, Product Design, etc.
Its not new!! Look around you. Almost everything you see was created using BIM!! It just wasn’t called BIM. In Manufacturing it has been known as Virtual Design or Virtual Prototyping.
Its been going on since the mid 90’s.!
How is it Different?
The older processes, or CAD (Computer Aided Design) relied on the manual sharing of information.
Information regarding the project was typically stored in multiple locations, multiple files and multiple formats, such as drawings, excel files, hand sketches etc.
A LOT of manual co-ordination was required to keep everything together and up to date.
Changes required careful management and could take a long time to make.

BIM uses a central database to store all the project information, so that any change to the information instantly updates any related information.
E.g.. If you move a window in plan view, it updates the elevations, sections window schedule etc.
More information is required at the early stages of the project and more time is spent in the design phase, and less as the project continues on.

The deliverables from a BIM Project are similar, however they are more co-ordinated, and have advantages that flow onto other parts of the project.

Think of BIM as Building it twice
Once in a Computer
then in real life!
BIM benefits


Enhanced project understanding.
Improved productivity. (less rework)
Enhanced performance of design (analysis)
Higher quality outcomes (build it twice! / Clash detection)
Faster delivery, quick response to queries.
Reduced wastage
Reduced Construction costs


Benefits per stage
DESIGN STAGE
Earlier and more accurate visualizations of Design
with 3D model Automated corrections (low-level) when design
changes are made. (faster)
Earlier collaborate and simultaneous work by multiple design disciplines
Increased accuracy and consistency – of 2D drawings – from early stages and at any stage of
the design production phase.
Linking of building model to energy analysis tools (early) to improve energy efficiency and
Sustainability
Extraction of bill of quantities for cost estimation
Design intent checks using 3D visualizations as well as quantification of the space areas
A Little Humour
OR...
DESIGN STAGE
DESIGN STAGE:
Earlier and more accurate visualizations of Design
with 3D model Automated corrections (low-level) when design
changes are made. (faster)
Earlier collaborate and simultaneous work by multiple design disciplines
Increased accuracy and consistency – of 2D drawings – from early stages and at any stage of the design production phase.
Linking of building model to energy analysis tools (early) to improve energy efficiency and Sustainability
Extraction of bill of quantities for cost estimation
Design intent checks using 3D visualizations as well as quantification of the space areas
PRE CONSTRUCTION
Feasibility study and conceptual design benefits which include enhanced processes and reduction in unnecessary time required.
Schematic model design prior to detailed building model development allows for enhanced evaluation for increased buildability and performance.
CONSTRUCTION
Synchronisation of design and construction planning can be co-ordinated to reveal sources of potential problems
Clash detection allows for discovery of design errors, as well as omissions before actual construction.
BIM model as well as objects and families can be utilized as basis for fabricated components
Enhance synchronisation of procurement with design as well as construction through the generation of 3D models
Reduction of wast and better implementation of lean construction techniques

POST CONSTRUCTION:
Model provides a source of information for building systems to for better operations and facilities management
As-built spaces and systems utilized as a starting point for maintenance and operations, as well as a database for possible future retrofits.
V Arc BIM Presentation
The BIM Promise
Dept of Defence: BIM mandate mid 2016
UK Government: BIM from 2014
USA GSA: BIM from 2013
Hong Kong:2014
Sweden, Norway, Finland, Denmark.....
show schedules / changes / updates
show quick video - fast / quick
slightly better
high quality
show live walkthough example - retail
show large realtime